Publication search results

You searched for:
 
Publication Type:
Report Remove
Year:
2014 Remove
Sort results by: DateTitle
M4 Junctions 3-12 Smart Motorway – Feedback Report

M4 Junctions 3-12 Feedback Report presenting the findings of the initial stakeholder consultation.

Type: Report

M60 junction 8 to M62 junction 20 smart motorway - report on outcome of SI consultation on implementation of variable speed limits

Report on outcome of SI consultation on implementation of variable mandatory speed limits

Type: Report

M1 Junctions 28 to 35a Air Quality Mitigation Summary of Consultation Responses

Responses to the consultation on proposal to introduce a maximum mandatory 60mph speed limit on the M1 between junction 28 and 35a.

Type: Report

M1 Junctions 28 to 35a Air Quality Mitigation Summary of Consultation Responses

Responses to the consultation on proposal to introduce a maximum mandatory 60mph speed limit on the M1 between junction 28 and 35a.

Type: Report

M1 Junctions 28 to 35a Air Quality Mitigation Summary of Consultation Responses

Responses to the consultation on proposal to introduce a maximum mandatory 60mph speed limit on the M1 between junction 28 and 35a.

Type: Report

Annual Report 2013-2014

Annual Report 2013-2014

Type: Report

Business Plan 2014-2015 Technical Notes

Performance specification: technical notes and scoping documents The Highways Agency’s performance specification sets out the service that we are to deliver and the targets we are to meet by March 2015. The specification is broken down into five key outcomes, as set out in our business plan, which comprise 12 outputs that define the individual…

Type: Report

M3 Junction 6 Black Dam Roundabout Improvements - Environmental Covering Note

Summary note describing environmental assessments required for this scheme.

Type: Report

M3 Junction 6 Black Dam Roundabout Improvements - Surface Water Drainage

Summary of results from surface water drainage investigation carried out as part of scheme design.

Type: Report

M3 Junction 6 Black Dam Roundabout Improvements - Summary of Environmental Results

Summary of results following investigation of environmental aspects affected by this scheme including air quality, visual impact and wildlife.

Type: Report

Route Strategies Evidence Reports

Route Strategies Evidence Reports

Type: Report

A1 Lobley Hill to Dunston Improvement - Environmental Assessment Report (EAR)

The Environmental Assessment Report (EAR) Summary presents the findings of an environmental review and assessment of the potential environmental impacts and effects of the implementation of the proposed scheme.

Type: Report

M1 J32 to 35a Smart Motorway - Environmental Assessment Report

This Environmental Assessment Report (EAR) presents the findings of an environmental review and assessment of the potential environmental impacts and effects of the implementation of the proposed scheme on the M1 between J32 and 35a.

Type: Report

M1 J28 to 31 Smart Motorway - Environmental Assessment Report

This Environmental Assessment Report (EAR) presents the findings of an environmental review and assessment of the potential environmental impacts and effects of the implementation of the proposed scheme on the M1 between J28 and 31.

Type: Report

Delivering the Highways Agency equality objectives – January 2014 progress report

This report, achievements and aspirations, provides a summary of our progress to date and gives a feel for our thinking for the future.

Type: Report

POPE meta report 2013

Summary of 2013 POPE meta report 2013 (PDF 443KB) Full 2013 POPE meta report (PDF 7MB)

Type: Report