Search results

You searched for:
 
Year:
2013 Remove
Sort results by: DateTitle
A556 Knutsford to Bowdon Improvement - Consultation Report

This report sets out how the Highways Agency has carried out pre-application consultation on the A556 Knutsford to Bowdon Improvement scheme.

Type: Report

Annual Report 2012-2013

The 2012-13 Highways Agency Annual Report and Accounts

Type: Report

Area 12 Road Users Satisfaction Survey

Area 12 Road Users Satisfaction Survey

Type: Report

Area 14 Road Users Satisfaction Survey

Area 14 Road Users Satisfaction Survey

Type: Report

Equality and Diversity - Gathering Momentum - Progress in delivering the Highways Agency equality objectives April 2012 - March 2013

In April 2012 the Agency set four equality objectives. The Gathering Momentum document summarises progress made during the first year of delivery and demonstrates how we are giving due regard to our equality duties.

Type: Report

HA Road Lighting Control System (HARLiCS)

Authors: MottMacDonald Document Reference: Garda S (2011) Publication Date: 07 August 2012 14:01 Assessment Level: Addition to the evidence pool Peer Review Information: No Topics: No related topics Executive Summary The HARLiCS Phase 1 project was commissioned by the Highways Agency’s Network Services Directorate in Dec 2010. Mott MacDonald as the consultant has developed and…

Type: Report

Highways Agency Initial Fire Risk Audit Report

This report provides an initial assessment of the potential fire risk locations around the strategic road network (SRN), consisting of the motorways and trunk roads of England.

Type: Report

M1 J39 to J42 Managed Motorway - Environmental Assessment Report - July 2013

Environmental Assessment Report (EAR) for the M1 J39 to J42 Managed Motorway Scheme.

Type: Report

M20 Junction 10A - Appraisal Summary Table 2013

Appraisal Summary Table - published February 2013

Type: Report

M25 Junctions 23 to 27 Managed Motorways - Summary of Consultation Responses

Summary of Consultation Responses Managed Motorways – All Lanes Running M25 J23 to J27

Type: Report

M25 Junctions 5 to 7 Managed Motorways - Summary of Consultation Responses

Summary of Consultation Responses Managed Motorways – All Lanes Running M25 J5 to J7

Type: Report

M3 Junctions 2-4a Managed Motorway Statutory Instrument Consultation Report

M3 Junctions 2-4a Managed Motorway - Response to the Consultation Report - September 2013

Type: Report

M4 Bus Lane: Environmental Assessment Report

Environmental Assessment Report (EAR) for the M4 Bus Lane Revocation.

Type: Report

M6 Junction 10a-13 Managed Motorway - Environmental Assessment Report

Environmental Assessment Report for the M6 Junction 10a-13 Managed Motorway scheme.

Type: Report

Managed Motorways Future Design

Authors: Mouchel Document Reference: 518482 Publication Date: 10 April 2012 13:37 Assessment Level: Addition to the evidence pool Peer Review Information: Yes by a Techical Project Board as per Agency standard process Topics: Developing Standards Executive Summary Interim Advice Note (IAN) 161/12 provides the requirements and guidance for the permanent conversion of the hard shoulder…

Type: Report

Planning - The Highways Agency's improvement plan - monitoring report

Summary A progress report against the Highways Agency's improvement plan objectives. The Highways Agency's improvement plan - monitoring report (PDF 45KB)  

Type: Report

Quantified risk assessment for road worker safety

Authors: C Fowler, S Clark, I Rillie, R Cuerden and L Smith Document Reference: 514707 Publication Date: 21 June 2011 10:25 Assessment Level: Peer Review Information: Topics: No related topics Executive Summary Every year a number of road workers suffer fatal or life changing injuries as a consequence of their work. Other road workers suffer…

Type: Report

Reduced Energy Lighting - White Light Sources

Authors: Capita Symonds Document Reference: 514324 Publication Date: 05 March 2012 08:13 Assessment Level: Addition to the evidence pool Peer Review Information: N/A Topics: No related topics Executive Summary A 2km section of the M4 between J5 & J6 has had its 250W high pressure sodium (SON) lamps replaced with 140W Cosmo white lights. These…

Published date:05 March 2012 08:13

Type: Report

Tourist Signs - Process and Policy Guidance

Summary Application Process The process steps needed to secure a tourist sign on the strategic road network, along with Annex C  application form, to be completed and sent to the Local Highways Authority. Tourist (brown) sign application process and application form (34.2KB PDF) An introduction to our policy If you are considering applying for tourist…

Type: Report

Waste Data Management

Authors: Jacobs Document Reference: 515386 Publication Date: 03 August 2011 09:39 Assessment Level: Addition to the Evidence Pool Peer Review Information: No Topics: Environmental Indicators / Management Executive Summary The Highways Agency (the HA) generates construction, demolition and excavation (CD&E) waste through the activities of its supply chain. In accordance with the HM Treasury Guidance…

Published date:03 August 2011 09:39

Type: Report