Publication search results

You searched for:
 
Publication Type:
Report Remove
Sort results by: DateTitle
Consultation report

M2M consultation report

Type: Report

M1 junction 10 to 13 consultation document

March 2015 Consultation Document

Type: Report

Environmental Assessment Report - figures and appendices

Volume 2 - figures (zip file - 226 mb) Volume 3 - appendices (zip file - 82 mb) Please note that these documents are very large. If you experience difficulty downloading we can also provide them via Compact Disk. Please contact us at the below email address if you require these documents posted to you. m2​0​lorryarea@​highwaysengland.​co.​uk  

Type: Report

M1 junction 10 to 13 response to consultation document

Response to the consultation report on the M1 junction 10 to 13

Type: Report

A27 Chichester Environmental Study Reports

Assessment of Implications on European Sites ESR - Appendices - Options 1, 1A, 2, 2A, 3, 3A and 6 ESR - Appendices - Options 4 and 5 ESR Options 1, 1A, 2, 2A, 3, 3A and 6 ESR Options 4 and 5 Extended Phase 1 Habitat Surveys - Offline Options Extended Phase 1 Habitat Surveys - Online Options Flood…

Type: Report

April 2016 options input workshop

Report from the April 2016 workshop

Type: Report

M1 Junctions 28-35a Smart Motorway – Environmental Assessment Report October 2015

This Environmental Assessment Report (EAR) presents the findings of an environmental review and assessment of the potential environmental impacts and effects of the implementation of the proposed scheme on the M1 between J28 and 35a.

Type: Report

M1 Junctions 28-35a Smart Motorway – Environmental Assessment Report October 2015

This Environmental Assessment Report (EAR) presents the findings of an environmental review and assessment of the potential environmental impacts and effects of the implementation of the proposed scheme on the M1 between J28 and 35a.

Type: Report

Highways England delivery plan 2015 to 2020

View the Highways England delivery plan on our gov​.uk page

Type: Report

M6 junction 16 to 19 smart motorway - variable mandatory speed limit consultation report

Report for the consultation which took place for the M6 smart motorway

Type: Report

A47 and A12 corridor feasibility study: technical report

Link to feasiblity studies: stage 1, 2 and 3

Type: Report

M20 Junction 10a Preliminary Environmental Information Report

Preliminary Environmental Information Report

Type: Report

Delivery Plan 2015 to 2020

Highways England Delivery Plan 2015 to 2020

Type: Report

A27 feasibility study

Technical reports

Type: Report

M1 J32 to 35a Smart Motorway - Environmental Assessment Report

Environmental Assessment Report Smart Motorway Operational Phase

Type: Report

M5 Junction 4a - 6 Noise Impact Assessment

Revised April 2016 to reflect the following amendments: removal of reference to four-lane running not occurring during the night, retitled photographs in appendix A

Type: Report

A27 feasibility study

Technical reports

Type: Report

Highways England Delivery Plan 2015 to 2020

Highways England Delivery Plan 2015 to 2020

Type: Report

A27 corridor feasibility study

Technical reports  

Type: Report

Highways England Delivery Plan 2015 to 2020

Highways England Delivery Plan 2015 to 2020  

Type: Report

Summary of Statutory Instrument Consultation Responses

Summary of Statutory Instrument Consultation Responses

Type: Report

A30 Carland Cross to Chiverton Cross public engagement report

For details of the public engagement for this project, please see the published report on the Cornwall Council website.  

Type: Report

M6 Junctions 16 to 19 Smart Motorway – Environmental Assessment Report

This Environmental Assessment Report (EAR) presents the findings of an environmental review and assessment of the potential environmental impacts and effects of the implementation of the proposed scheme on the M6 between junctions 16 and 19

Type: Report

A14 Cambridge to Huntingdon improvement scheme - consultation report

A14 Cambridge to Huntingdon improvement scheme - consultation report

Type: Report

Statutory instrument consultation

M1 - junctions 39 to 42 statutory instrument

Type: Report

Case for the scheme - executive summary

Cambridge to Huntingdon improvement scheme

Type: Report

M25 junction 23 to 27 Final Use Assessment

M25 junction 23 to 27 Final Use Assessment – Noise Insulation Regulations Assessment

Type: Report

M25 junction 5 to 7 Final Use Assessment

M25 junction 5 to 7 Final Use Assessment – Noise Insulation Regulations Assessment

Type: Report

M1 Junctions 28 to 31 Smart Motorway, Junctions 31 to 32 Variable Mandatory Speed Limits, Junctions 32 to 35a Summary of Consultation Responses

Responses to the consultations on proposals to implement variable mandatory speed limits on the M1 between junction 28 and 35a

Type: Report

M1 Junctions 28 to 31 Smart Motorway, Junctions 31 to 32 Variable Mandatory Speed Limits, Junctions 32 to 35a Summary of Consultation Responses

Responses to the consultations on proposals to implement variable mandatory speed limits on the M1 between junction 28 and 35a

Type: Report

M4 Junctions 3-12 Smart Motorway – Feedback Report

M4 Junctions 3-12 Feedback Report presenting the findings of the initial stakeholder consultation.

Type: Report

M60 junction 8 to M62 junction 20 smart motorway - report on outcome of SI consultation on implementation of variable speed limits

Report on outcome of SI consultation on implementation of variable mandatory speed limits

Type: Report

M1 Junctions 28 to 35a Air Quality Mitigation Summary of Consultation Responses

Responses to the consultation on proposal to introduce a maximum mandatory 60mph speed limit on the M1 between junction 28 and 35a.

Type: Report

M1 Junctions 28 to 35a Air Quality Mitigation Summary of Consultation Responses

Responses to the consultation on proposal to introduce a maximum mandatory 60mph speed limit on the M1 between junction 28 and 35a.

Type: Report

M1 Junctions 28 to 35a Air Quality Mitigation Summary of Consultation Responses

Responses to the consultation on proposal to introduce a maximum mandatory 60mph speed limit on the M1 between junction 28 and 35a.

Type: Report

Annual Report 2013-2014

Annual Report 2013-2014

Type: Report

Business Plan 2014-2015 Technical Notes

Performance specification: technical notes and scoping documents The Highways Agency’s performance specification sets out the service that we are to deliver and the targets we are to meet by March 2015. The specification is broken down into five key outcomes, as set out in our business plan, which comprise 12 outputs that define the individual…

Type: Report

M3 Junction 6 Black Dam Roundabout Improvements - Environmental Covering Note

Summary note describing environmental assessments required for this scheme.

Type: Report

M3 Junction 6 Black Dam Roundabout Improvements - Surface Water Drainage

Summary of results from surface water drainage investigation carried out as part of scheme design.

Type: Report

M3 Junction 6 Black Dam Roundabout Improvements - Summary of Environmental Results

Summary of results following investigation of environmental aspects affected by this scheme including air quality, visual impact and wildlife.

Type: Report

Route Strategies Evidence Reports

Route Strategies Evidence Reports

Type: Report

A1 Lobley Hill to Dunston Improvement - Environmental Assessment Report (EAR)

The Environmental Assessment Report (EAR) Summary presents the findings of an environmental review and assessment of the potential environmental impacts and effects of the implementation of the proposed scheme.

Type: Report

M1 J32 to 35a Smart Motorway - Environmental Assessment Report

This Environmental Assessment Report (EAR) presents the findings of an environmental review and assessment of the potential environmental impacts and effects of the implementation of the proposed scheme on the M1 between J32 and 35a.

Type: Report

M1 J28 to 31 Smart Motorway - Environmental Assessment Report

This Environmental Assessment Report (EAR) presents the findings of an environmental review and assessment of the potential environmental impacts and effects of the implementation of the proposed scheme on the M1 between J28 and 31.

Type: Report

Delivering the Highways Agency equality objectives – January 2014 progress report

This report, achievements and aspirations, provides a summary of our progress to date and gives a feel for our thinking for the future.

Type: Report

POPE meta report 2013

Summary of 2013 POPE meta report 2013 (PDF 443KB) Full 2013 POPE meta report (PDF 7MB)

Type: Report

M3 Junctions 2-4a Managed Motorway Statutory Instrument Consultation Report

M3 Junctions 2-4a Managed Motorway - Response to the Consultation Report - September 2013

Type: Report

M4 Bus Lane: Environmental Assessment Report

Environmental Assessment Report (EAR) for the M4 Bus Lane Revocation.

Type: Report

M1 J39 to J42 Managed Motorway - Environmental Assessment Report - July 2013

Environmental Assessment Report (EAR) for the M1 J39 to J42 Managed Motorway Scheme.

Type: Report

M25 Junctions 5 to 7 Managed Motorways - Summary of Consultation Responses

Summary of Consultation Responses Managed Motorways – All Lanes Running M25 J5 to J7

Type: Report

M25 Junctions 23 to 27 Managed Motorways - Summary of Consultation Responses

Summary of Consultation Responses Managed Motorways – All Lanes Running M25 J23 to J27

Type: Report

A556 Knutsford to Bowdon Improvement - Consultation Report

This report sets out how the Highways Agency has carried out pre-application consultation on the A556 Knutsford to Bowdon Improvement scheme.

Type: Report

Planning - The Highways Agency's improvement plan - monitoring report

Summary A progress report against the Highways Agency's improvement plan objectives. The Highways Agency's improvement plan - monitoring report (PDF 45KB)  

Type: Report

M6 Junction 10a-13 Managed Motorway - Environmental Assessment Report

Environmental Assessment Report for the M6 Junction 10a-13 Managed Motorway scheme.

Type: Report

Annual Report 2012-2013

The 2012-13 Highways Agency Annual Report and Accounts

Type: Report

Highways Agency Initial Fire Risk Audit Report

This report provides an initial assessment of the potential fire risk locations around the strategic road network (SRN), consisting of the motorways and trunk roads of England.

Type: Report

M20 Junction 10A - Appraisal Summary Table 2013

Appraisal Summary Table - published February 2013

Type: Report

Reduced Energy Lighting - White Light Sources

Authors: Capita Symonds Document Reference: 514324 Publication Date: 05 March 2012 08:13 Assessment Level: Addition to the evidence pool Peer Review Information: N/A Topics: No related topics Executive Summary A 2km section of the M4 between J5 & J6 has had its 250W high pressure sodium (SON) lamps replaced with 140W Cosmo white lights. These…

Published date:05 March 2012 08:13

Type: Report

Waste Data Management

Authors: Jacobs Document Reference: 515386 Publication Date: 03 August 2011 09:39 Assessment Level: Addition to the Evidence Pool Peer Review Information: No Topics: Environmental Indicators / Management Executive Summary The Highways Agency (the HA) generates construction, demolition and excavation (CD&E) waste through the activities of its supply chain. In accordance with the HM Treasury Guidance…

Published date:03 August 2011 09:39

Type: Report

Equality and Diversity - Gathering Momentum - Progress in delivering the Highways Agency equality objectives April 2012 - March 2013

In April 2012 the Agency set four equality objectives. The Gathering Momentum document summarises progress made during the first year of delivery and demonstrates how we are giving due regard to our equality duties.

Type: Report

Managed Motorways Future Design

Authors: Mouchel Document Reference: 518482 Publication Date: 10 April 2012 13:37 Assessment Level: Addition to the evidence pool Peer Review Information: Yes by a Techical Project Board as per Agency standard process Topics: Developing Standards Executive Summary Interim Advice Note (IAN) 161/12 provides the requirements and guidance for the permanent conversion of the hard shoulder…

Type: Report

HA Road Lighting Control System (HARLiCS)

Authors: MottMacDonald Document Reference: Garda S (2011) Publication Date: 07 August 2012 14:01 Assessment Level: Addition to the evidence pool Peer Review Information: No Topics: No related topics Executive Summary The HARLiCS Phase 1 project was commissioned by the Highways Agency’s Network Services Directorate in Dec 2010. Mott MacDonald as the consultant has developed and…

Type: Report

Tourist Signs - Process and Policy Guidance

Summary Application Process The process steps needed to secure a tourist sign on the strategic road network, along with Annex C  application form, to be completed and sent to the Local Highways Authority. Tourist (brown) sign application process and application form (34.2KB PDF) An introduction to our policy If you are considering applying for tourist…

Type: Report

Quantified risk assessment for road worker safety

Authors: C Fowler, S Clark, I Rillie, R Cuerden and L Smith Document Reference: 514707 Publication Date: 21 June 2011 10:25 Assessment Level: Peer Review Information: Topics: No related topics Executive Summary Every year a number of road workers suffer fatal or life changing injuries as a consequence of their work. Other road workers suffer…

Type: Report

Area 14 Road Users Satisfaction Survey

Area 14 Road Users Satisfaction Survey

Type: Report

Area 12 Road Users Satisfaction Survey

Area 12 Road Users Satisfaction Survey

Type: Report

Area 9 Road Users Satisfaction Survey

Area 9 Road Users Satisfaction Survey

Type: Report

Area 2 Road Users Satisfaction Survey

Area 2 Road Users Satisfaction Survey

Type: Report

Area 1 Road Users Satisfaction Survey

Area 1 Road Users Satisfaction Survey

Type: Report

Area 7 Road Users Satisfaction Survey

Area 7 Road Users Satisfaction Survey

Type: Report

A19 Testos Junction Improvements - Appraisal Summary Table

Appraisal Summary Table (AST) for A19 Testos Junction Improvements.

Type: Report

Bedfordshire and Luton Casualty Data - Highways Agency Roads

Summary Bedfordshire and Luton Safety Camera Partnership Data (Excel 575KB)

Type: Report

Safety cameras - casualty data reports

The Agency uses safety cameras as one of measures to help improve safety. There are fixed safety camera sites, mostly on all purpose trunk roads, which are operated within local Road Safety Partnerships.

Type: Report

Waste Data Management

Summary The Highways Agency (the HA) generates construction, demolition and excavation (CD&E) waste through the activities of its supply chain. In accordance with the HM Treasury Guidance “Public Sector Annual Reports: Sustainability Reporting – Guidance for the 2010-11 Dry Run”, the HA is expected to report externally on the extent of its construction waste generation.…

Type: Report

A5-M1 Link (Dunstable Northern Bypass) - Environmental Statement

Non-Technical Summary of the Environmental Statement and link to the full Environmental Statement

Type: Report

A5-M1 Link (Dunstable Northern Bypass) - Public Consultation Exit Interviews

Public Consultation Exit Interviews

Published date:October 2005

Type: Report

Reported Road Casualties on the Strategic Network

The High­ways Agency makes an impor­tant con­tri­bu­tion to road safety in Eng­land. As oper­a­tor of the Strate­gic Road Net­work, every­thing we do has safety implications.

Type: Report

A46 Newark to Widmerpool Improvement - Following the Fosse Way through Nottinghamshire Archaeology and the A46

Following the Fosse Way through Nottinghamshire Archaeology and the A46

Published date:2012

Type: Report

M25 Junctions 23-27 Managed Motorways - Environmental Assessment Report

For a copy of the Environmental Assessment Report for this scheme please email the team at: M2​5​J2​3​toJ2​7​MM@​highways.​gsi.​gov.​uk  

Type: Report

Latest major projects meta report (May 2011)

Latest major projects meta report

Type: Report

Major projects POPE reports

Completed major projects and their latest published POPE report (if available).

Type: Report

A63 Castle Street - Public Consultation Report

Public Consultation Report - CONSULTATION NOW CLOSED

Published date:March 2010

Type: Report

A63 Castle Street - Scheme Assessment Report

Scheme Assessment Report

Published date:March 2010

Type: Report

A453 Widening - Non-Technical Summary

Non-Technical Summary

Published date:January 2009

Type: Report

A453 Widening - Public Consultation Report

Public Consultation Report

Published date:December 2007

Type: Report

A453 Widening - Appraisal Summary Table - Preferred Route Announcement May 2004

Appraisal Summary Table - Preferred Route Announcement May 2004

Type: Report

A45/A46 Tollbar End Improvement Public Consultation

This content is available on The National Archive website: Public Consultation - November 2001

Published date:November 2001

Type: Report

A45/A46 Tollbar End Improvement Appraisal Summary Table

Appraisal Summary Table - August 2013

Type: Report

A45/A46 Tollbar End Improvement Non-Technical Summary

Non-Technical Summary

Published date:March 2009

Type: Report

A45/A46 Tollbar End Improvement Environmental Statement

Environmental Statement

Published date:March 2009

Type: Report

M1 Junction 19 Improvement Scheme Environmental Statement

Non-Technical Summary of the Environmental Statement and the full Environmental Statement for the M1 Junction 19 Improvement Scheme

Published date:February 2010

Type: Report

M1 Junction 19 Improvement Scheme Explanatory Statement

Explanatory Statement

Published date:February 2010

Type: Report

M1 Junction 19 Improvement Scheme - Appraisal Summary Table

On this page you can download the Appraisal Summary Table (AST) for M1 Jct 19.

Type: Report

Area 5 Road Users Satisfaction Survey

Area 5 Road Users Satisfaction Survey

Type: Report

Area 4 Road Users Satisfaction Survey

Area 4 Road Users Satisfaction Survey

Type: Report

Area 3 Road Users Satisfaction Survey

Area 3 Road Users Satisfaction Survey

Type: Report

M1 Junction 19 Improvement Scheme - Road Based Study Junction Improvements Proposals 2002

M1 Junction 19 Road Based Study Junction Improvements Proposals 2002 (4 MB PDF)

Type: Report

Customer Feedback Report

Customer Feedback Report

Type: Report

NRUSS Annual Report

NRUSS Annual Report 2011-12

Type: Report

Area 8 Road Users Satisfaction Survey

Area 8 Road Users Satisfaction Survey

Type: Report

Area 6 Road Users Satisfaction Survey

Area 6 Road Users Satisfaction Survey

Type: Report

Area 13 Road Users Satisfaction Survey

Area 13 Road Users Satisfaction Survey

Type: Report

Area 10 Road Users Satisfaction Survey

Area 10 Road Users Satisfaction Survey

Type: Report

A21 Tonbridge to Pembury Dualling - Revised Environmental Statement

Revised Environmental Statement, Non-Technical Summary of the Environmental Statement and Statement Explaining the Proposals

Type: Report

A21 Tonbridge to Pembury Statement of Case

Full Statement of Case, Statement of Case - Listed Buildings, Statement of Case - Listed Buildings Appendix A

Published date:May 2010

Type: Report

M1 Junction 10 - 13 Improvements Environmental Statement

Environmental statement and non-technical summary of the environmental statement

Type: Report

M1 Junctions 10 to 13 Response to Consultation Report

Response to consultation report

Published date:October 2011

Type: Report

M25 Junctions 5-7 Managed Motorways - Environmental Assessment Report

For a copy of the Environmental Assessment Report for this scheme please email the team at:M2​5​junction5​to7​MM@​highways.​gsi.​gov.​uk

Type: Report

A23 Handcross to Warninglid - Environmental Statement

On this page you can download a copy of the Environmental Statement Non-Technical Summary and find out how to obtain a copy of the Environmental Statement.

Type: Report

A556 Knutsford to Bowdon Environmental Improvement - Business Case

Business Case - Information correct as at December 2010

Type: Report

Climate change adaptation

Climate change adaptation is concerned with how we adapt to operate within a changing climate

Type: Report

Project Control Framework - Product Matrix

Project Control Framework - Product Matrix

Type: Report

A11 Fiveways to Thetford Improvement - Non-Technical Summary

The Non-Technical Summary and the Revised Non Technical Summary for the A11 Fiveways to Thetford Improvement

Type: Report

A11 Fiveways to Thetford Improvement - Appraisal Summary Table

Appraisal Summary Table (AST) for the A11 Fiveways to Thetford Improvement

Type: Report

A11 Fiveways to Thetford Improvement - Environmental Statement

This publication is currently unavailable, please email: a1​1​fivewaystothetfordimprovement@​highways.​gsi.​gov.​uk if you have any queries relating to the Environmental Statement

Type: Report

Penfold Review of non planning consents - Higways Agency Implementation report as of 10 July 2012

The Penfold Review of Non-Planning Consents was commissioned by the Department of Business Innovation and Skills (BIS).

Type: Report

M62 Junctions 25 to 30 Managed Motorway - Appraisal Summary Table

Download the Appraisal Summary Table (AST) for the M62 J25 to J30 Managed Motorway scheme

Type: Report

M62 Junctions 25 to 30 Managed Motorway - Public Consultation

This information is no longer available on our site. To access this information please follow the link below to the NAtional Archive website: M62 Junction 25 to 30 Managed Motorway Public Consultation  

Type: Report

Area 6 - Area Safety Action Plan

The objective of the Area Safety Action Plan is to monitor the performance of Area 6 in terms of casualty reduction, to determine ways of reducing casualties further by working with various partners and evaluate the benefits of past initiatives.

Type: Report

Area 6 Congestion Reduction Plan

This report has been produced to review levels of congestion on the Area 6 strategic road network.

Type: Report

Area 6 Route Reports

The Route Reports follows on from the Safety Reports and investigate clusters and network links identified for further investigation.

Type: Report

Area 6 Quarterly Safety Reports

These reports monitor the number of personal injury accidents on the Area 6 by network, route and local authority area, analysing casualty and collision numbers for each quarter, to identify any developing trends or issues.

Type: Report

A1 Elkesley Junctions Improvement - Appraisal Summary Table

Download the Appraisal Summary Table (AST) for the A1 Elkesley Junctions Improvement.

Type: Report

Road Projects - Post Opening Project Evaluation (POPE) of Local Network Management Schemes (LNMS)

POPE of LNMS 10th Annual Report POPE of LNMS 10th Annual Report (2013) - Executive Summary (682KB PDF) POPE of LNMS 10th Annual Report (2013) (4.34MB PDF) Large LNMS Evaluation Reports North West M6 J32 Southbound Widening (2.01MB PDF) A55 / A483 Junction Improvement Scheme (1.46MB PDF) M62 J10  Westbound Diverge (1.14MB PDF) M6 J40…

Type: Report

Road Projects - Post Opening Project Evaluation (POPE) of Major Schemes

Summary We have pro­duced a table that sum­marises the appraisal and eval­u­a­tion fig­ures for our major schemes. The appraisal fig­ures show the pre­dicted impact of the scheme, cal­cu­lated dur­ing the design stage. The eval­u­a­tion fig­ures recal­cu­late these pre­dic­tions using out­turn data — i.e. what was found to be hap­pen­ing after the scheme opened. The table…

Type: Report

Equality and Diversity - Making a Difference

The Highways Agency Equality objectives.

Type: Report

Highways Agency 2011 People Survey Results

The survey was part of the wider Civil Service People Survey which had almost 300,000 responses from staff in 97 government departments and agencies.

Type: Report

Business Plan 2012-2013

Business Plan 2012-13 sets out how the Highways Agency will operate, maintain and improve the 4,300-mile network of motorways and trunk roads in England.

Type: Report

Annual Report 2011-2012

This report accounts for the Highways Agency's performance over the 2011-2012 financial year.

Type: Report

Our roads - safety cameras

Highways Agency safety cameras as one of measures to help improve safety.

Type: Report

Brine Spreading Trial

Authors: TRL - M Evans, R Jordan and T Rasalingham Document Reference: 510390 Assessment Level: Definitive evidence Topics: No related topics Executive Summary Background As part of a project to investigate benefits of (i) pre-wetted salting with uniformly graded salt and (ii) liquid (brine) treatments, TRL prepared a business case which examined the economic viability…

Published date:25 October 2011

Type: Report

A1 Elkesley Junction Improvements Public Consultation Report - 2006

This report presents a summary of the findings from the Public Consultation study and data collected during this phase.

Type: Report

A1 Elkesley Junctions Improvement - Public Consultation Brochure - 2005

This document is available on the National Archive website. To access this document please follow the link below: Public Consultation Brochure - 2005

Type: Report