Latest traffic information

Breadcrumb Navigation

You are here:

  1. Home »
  2. Road Projects »
  3. How We Manage Our Roads »
  4. Area Teams »
  5. Area 2 »
  6. The Severn Bridges »
  7. Facts and Figures

Website Navigation

Useful Links

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

How We Manage Our Roads

In this section you can find out more about how we manage and maintain these roads and plan for the future

The Project Control Framework

On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

Facts and Figures

Severn Bridge

The Severn Bridge was opened to replace the ferry service between Aust Cliff and Beachley.  The bridge is 8 miles upstream from Avonmouth and, at this point, the River Severn is almost 1 mile wide at high water. 

The Bridge took 3½ years to build at a cost of £8m.  The towers are 445 feet high and the main span is 3,240 feet.  It carries two 24ft wide carriageways marked as two lanes, as well as two 12ft wide pedestrian/cycle paths.   The centres of suspension cables are 75 ft apart.

The Crossing consists of four structures: the Severn Bridge which spans the River Severn, the Wye Bridge which spans the River Wye, Beachley Viaduct which connects the Severn Bridge and the Wye Bridge, and Aust Viaduct. It carries around 17,000 vehicles a day.

The Severn Bridge originally carried the M4, but with the opening of the Second Severn Crossing in 1996, the new crossing became part of the M4 Motorway and the Severn Bridge became part of the M48 Motorway.

The former Avon County Council, and Gloucestershire County Council prior to that, maintained and operated the Severn Bridge on behalf of the Secretary of State until responsibility passed to Severn River Crossing plc (SRC) in April 1992.  

The M48 Severn Bridge is a local land mark and a Grade 1 listed structure.  Unlike the Second Severn Crossing, it has no wind shielding and is subject to closures during high winds (see High Winds Protocol).

The toll plaza is situated at Aust on the English side of the estuary.

Second Severn Crossing

In July 1986 the Secretaries of State for Transport and for Wales agreed to build a bridge across the Severn Estuary.  The new bridge would be situated approximately 3½ miles downstream from the Severn Bridge and would connect to the M4 on both banks, as well as to the M5 near Avonmouth.

The contract to design, build, finance and operate the Second Severn Crossing was awarded to SRC in April 1990.  As a result, SRC entered into an agreement with the Government.  The Concession Agreement was embodied into an Act of Parliament, and on 6 March 1992, the Secretary of State signed the Order setting the starting date of the Concession as 26 April 1992.

The Concession period is limited to a maximum of 30 years, although the actual end date will be achieved when SRC has collected a fixed sum of money from tolls.

The Second Crossing took 4 years to build at a cost of £330 million.  The structure is 5,126m long and consists of a central 948 metre cable stayed bridge supported by two 137 metre high pylons.  It carries three lanes of traffic in each direction and was designed to include wind shielding to protect traffic.

The toll plaza is situated at Rogiet on the Welsh side of the estuary.

Further information, including toll prices, maintenance and lane closures, and  the current status of the crossings are available on Severn River Crossing's website at www.severnbridge.co.uk