Latest traffic information

Breadcrumb Navigation

You are here:

  1. »
  2. Home »
  3. Road Projects »
  4. Road Projects »
  5. How We Manage Our Roads »
  6. Post Opening Project Evaluation (POPE) »
  7. Post Opening Project Evaluation (POPE) of Local Network Management Schemes (LNMS)

Website Navigation

Useful Links

Quick Links

Map Based Road Projects Finder - Feedback

We are currently piloting a new map based tool to help you find road projects. Please let us know what you think

The Project Control Framework

This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.

Post Opening Project Evaluation (POPE) of Local Network Management Schemes (LNMS)

What are Local Network Management Schemes (LNMS)?

These are schemes which bring improvements to our network and cost no more than £10 million. They are managed on an area by area basis. More information about area schemes is available on the managing our network page.

What is included in POPE for LNMS?

For POPE, LNMS are split into two categories for evaluation:

  • 'Large LNMS' are those which cost between £1 million and £10 million to implement. (Anything costing more than £10 million is a 'Major Scheme'')
    For large LNMS the approach is similar to that for Major Schemes but it is only carried out at the One Year After stage. 
  • For schemes between £25,000 and £1 million, POPE studies are undertaken on an annual cycle, ensuring each scheme has been open for at least one year before it is evaluated. A mini-report is produced for all economy and safety schemes, and also for a sample of environment, accessibility and integration schemes. This mini-report sets out:
    • what was proposed;
    • the predicted and outturn costs and benefits, and hence calculates the first year rate of return;
    • a comparison of the predicted and outturn wider impacts; and,
    • whether or not the scheme objectives were met.

Exactly what 'after' data is collected for a LNMS study depends on the availability of 'before' data to compare it against.

Where can I find the results of POPE of LNMS?

The main output of POPE of LNMS is an annual report summarising the results of all the schemes examined so far and highlighting a number of trends. This allows different scheme types to be compared and to identify if there is any consistent under - or over-prediction of certain types of benefit.

The full report is also available to download:

For the 'large LNMS' a scheme POPE report is written.  POPE reports are available for the following schemes:

North West

M6 J32 Southbound Widening (2.01MB PDF)

A55 / A483 Junction Improvement Scheme (1.46MB PDF)

M62 J10  Westbound Diverge (1.14MB PDF)

M6 J40 Improvements (2.72MB PDF)

A596 / Calva Brow Junction Improvement (1.0MB PDF)

A596 Northside Junction Improvement (1.31MB PDF)

North East & Yorkshire

A523 Leek To Hazel Grove (2.03MB PDF)

A66 Sadberge Grade Separated Junction (1.95MB PDF)

A1(M) Durham Climbing Lanes (Bradbury To Bowburn) (3.1MB PDF)

A1 Rainton Crossroads (4MB PDF)

A63 Garrison Road Roundabout (1.31MB PDF)

A19 Black Swan Bridge (1.46MB PDF)

M62 Junction 25 Eastbound Entry Slip (1.73MB PDF)

M62 Junction 27 Westbound Entry Slip (2.81MB PDF)

A64 / Top Lane Junction Improvement at Copmanthorpe (1.8MB PDF)

Midlands

A45 Packington Crossroads (3MB PDF)

A46 / A607 Hobby Horse Roundabout (1.85MB PDF)

M40 J15 Improvement Scheme (3.72MB PDF)

A45 / A46 Stivichall Junction (1MB PDF)

M1 J25 Safety Improvements (2.9MB PDF)

M1 J28 Capacity Improvements (1.2MB PDF)

A45 / A445 Ryton-on-Dunsmore Junction Improvement (550KB PDF)

A5 Bayleys Roundabout (2.6MB PDF)

East

A47 Honingham Roundabout (2.5MB PDF)

A12 Stanway to Spring Lane Interchange (1.4MB PDF)

A14 Spittals Interchange Provision of Traffic Signals (875KB PDF)

A14 Brampton Hut Interchange -  New Traffic Signals (3.2MB PDF)

A14 Huntingdon to Cambridge Safety Cameras (2.9MB PDF)

A45 Wilby Way Roundabout Segregated Left-Turn Lane (1.2MB PDF)

A14 Jane Coston Bridge (3MB PDF)

A47 / A10 Hardwick Roundabout (1.5MB PDF)

A5 Dunstable Queue Relocation (4MB PDF)

South West

M4/M5 Almondsbury Interchange Phase 2A (1.4MB PDF)

A419 Calcutt Access Roads (1.28MB PDF)

A30 Chiverton Cross Roundabout Improvement (1.7MB PDF)

M5 J31 Lane Drop (1.9MB PDF)

London and South East

A2 Kingston Bridleway Bridge (1.58MB PDF)

M20/M26 Street Lighting Improvement (1.69MB PDF)

M11 Junction 4 Northbound Merge of Slip Roads (1MB PDF)

A21 Johns' Cross Junction Improvement (1.6MB PDF)

M25 Junctions 18 to 19 Climbing Lane (1MB PDF)

M25 Junctions 16 to 17 Climbing Lane (1.6MB PDF)

M25 Junctions 27 to 28 Climbing Lane (1.7MB PDF)