LANE CLOSURES This output is created each weekday. It contains records of lane closures for the next two weeks. The information in this document is unedited data from the Highways Agency's database of Scheduled Road Works and is offered as an aid to journey planning. Generated on: 29-Aug-2008 06:02:21 ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Barnet Location: Jct 3 to Jct 2 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 800 metres Description: 22.00hrs - 05.00hrs Lane 1 and 2 closure southbound due to piling rig installation. [E521045,N192431] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Barnet Location: Jct 3 to Jct 2 Period: 02-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 800 metres Description: 22.00hrs - 05.00hrs Lane 1 and 2 closure southbound due to piling rig installation. [E521045,N192431] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Barnet Location: Jct 2 to Jct 4 Period: 11-Sep-2008 to 12-Sep-2008 Effect: Slight (less than 10 mins) Length: 4000 metres Description: 22.00hrs - 05.00hrs Lane 1 and lane 2 closure northbound, due to barrier guard removal. [E519376,N194047] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Barnet Location: Jct 2 northbound entry and southbound exit slips Period: 12-Sep-2008 to 13-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 400 metres Description: 22.00hrs - 04.30hrs Slip road closures both carriageways, due to surveying. Diversion to A41 to Jct 4 [E522141,N190871] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Barnet Location: Jct 2 to Jct 4 Period: 11-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 5000 metres Description: 22.00hrs - 05.00hrs Lane 1 and lane 2 closure southbound, due to barrier guard removal. [E519803,N193787] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Barnet Location: Jct 2 to Jct 4 Period: 19-Jun-2008 to 20-Sep-2008 Effect: Slight (less than 10 mins) Length: 4000 metres Description: 24hrs Hardshoulder closure both carriageways, with narrowing of lanes and 50mph speed limit, due to technology renewal scheme. [E519868,N193758] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Barnsley Location: Jct 37 Period: 02-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 1988 metres Description: 3 lanes closed with hardshoulder running with switch to lane 3 running southbound for communication works. [E432782,N404848] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Barnsley Location: Jct 35 - 38 Period: 02-Sep-2008 to 10-Sep-2008 Effect: Slight (less than 10 mins) Length: 19148 metres Description: Lane 3 closure northbound and southbound for survey works, 2200 - 0600 hrs. [E433660,N402830] ---------------------------------------------------------------------------------------------- M1, Bedfordshire Location: Jct 11 to Jct 10 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 3526 metres Description: Lane closure Southbound 2130 - 0530 hrs due to essential maintenance [E506177,N221772] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Bedfordshire Location: Jct 11 to Jct 12 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 2260 metres Description: Lane closure Northbound 2100 - 0600 hrs due to communication works on SOS phones. [E502346,N229484] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Bedfordshire Location: Jct 13 to Jct 12 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 1616 metres Description: Lane closure Southbound 2100 - 0600 hrs due to communication works on SOS phones. [E496468,N237176] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Bedfordshire Location: Jct 12 to Jct 13 Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 793 metres Description: Lane closure Northbound 2100 - 0600 hrs due to communication works on SOS phones. [E501100,N232250] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Bedfordshire Location: Jct 12 to Jct 13 Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 1225 metres Description: Lane closure Northbound 2100 - 0600 hrs due to communication works on SOS phones. [E496466,N237157] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Bedfordshire Location: Jct 13 to Jct 12 Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 2318 metres Description: Lane closure Southbound 2100 - 0600 hrs due to communication works on SOS phones. [E501374,N231485] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Bedfordshire Location: Jct 12 to Jct 11 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 1924 metres Description: Lane closure Southbound 2100 - 0600 hrs due to communication works on SOS phones. [E502475,N229404] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Buckinghamshire Location: Jct 14 to Jct 13 Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 1185 metres Description: Lane closure Southbound 2300 - 0600 hrs due to essential maintenance. [E491317,N239733] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Buckinghamshire Location: Jct 14 to Jct 15 Period: 30-Aug-2008 to 31-Aug-2008 Effect: Slight (less than 10 mins) Length: 1019 metres Description: Lane closures Northbound 2200 - 0800 hrs due to essential maintenance. [E488615,N241249] ---------------------------------------------------------------------------------------------- M1, Buckinghamshire Location: Jct 14 Entry Slip Period: 02-Sep-2008 to 05-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 510 metres Description: Carriageway closure Northbound 2130 - 0530 hrs due to essential maintenance. [E488914,N240993] ---------------------------------------------------------------------------------------------- M1, Buckinghamshire Location: Jct 14 Entry Slip Period: 05-Sep-2008 to 06-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 510 metres Description: Carriageway closure Northbound 2200 - 0800 hrs due to essential maintenance. [E488914,N240993] ---------------------------------------------------------------------------------------------- M1, Buckinghamshire Location: Jct 13 to Jct 14 Period: 12-Sep-2008 to 14-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2713 metres Description: Lane closures northbound and southbound 2200-0530 due to essential maintenance. [E495999,N237348] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Derbyshire Location: Jct 30 to Jct 31 Period: 19-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 502 metres Description: Hardshoulder closed northbound for bridge maintenance works, 24 hrs [E447703,N379263] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Derbyshire Location: Jct 30 - 31 Period: 02-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 1001 metres Description: Hardshoulder closure northbound for bridge maintenance works, 0600 - 2200 hrs. [E447763,N379533] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Derbyshire Location: Jct 30 - 31 Period: 01-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 1001 metres Description: Lane 3 running northbound for bridge maintenance works, 2200 - 0600 hrs. [E447763,N379533] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Derbyshire Location: Jct 30 to Jct 31 Period: 31-Aug-2008 to 29-Sep-2008 Effect: Slight (less than 10 mins) Length: 1004 metres Description: Lane 3 running with switch to hardshoulder running northbound for bridge maintenance works. [E447703,N379263] ---------------------------------------------------------------------------------------------- M1, Derbyshire Location: South Of Junction 30 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 5858 metres Description: Next planned works 21-07-08 will be lane 3 closures north and southbound 21:00 to 05:00 hours or lane 2 and 3 closed southbound with lane 3 closure northbound 22:00 to 05:00 hours. Cyclic maintenance programme. [E446082,N374613] ---------------------------------------------------------------------------------------------- M1, Derbyshire Location: North Of Junction 29 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 4007 metres Description: Next planned works 22-07-08 will be lane 3 closures north and southbound 21:00 to 05:00 hours or lane 2 and 3 closed southbound with lane 3 closure northbound 22:00 to 05:00 hours. Cyclic maintenance programme. [E444979,N370365] ---------------------------------------------------------------------------------------------- M1, Derbyshire Location: South Of Junction 29 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 3971 metres Description: Next planned works 23-07-08 will be lane 3 closures north and southbound 21:00 to 05:00 hours or lane 2 and 3 closed southbound with lane 3 closure northbound 22:00 to 05:00 hours. Cyclic maintenance programme. [E445263,N366466] ---------------------------------------------------------------------------------------------- M1, Derbyshire Location: North Of Tibshelf Service Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 4087 metres Description: Next planned works 24-07-08 will be lane 3 closures north and southbound 21:00 to 05:00 hours or lane 2 and 3 closed southbound with lane 3 closure northbound 22:00 to 05:00 hours. Cyclic maintenance programme. [E444986,N361451] ---------------------------------------------------------------------------------------------- M1, Derbyshire Location: South Of Tibshelf Service Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 3961 metres Description: Next planned works 25-07-08 and 28-07-08 will be lane 3 closures north and southbound 21:00 to 05:00 hours or lane 2 and 3 closed southbound with lane 3 closure northbound 22:00 to 05:00 hours. Cyclic maintenance programme. [E444956,N358440] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Derbyshire Location: South Of Junction 28 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 4006 metres Description: Next planned works to be confirmed but will be lane 3 closures north and southbound 20.00 to 06.00 hours. Cyclic maintenance programme. [E446429,N355172] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Derbyshire Location: Trowell to Junction 25 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 4144 metres Description: Next planned works to be confirmed but will be lane 3 closures north and southbound 20.00 to 06.00 hours. Cyclic maintenance programme. [E447825,N337630] ---------------------------------------------------------------------------------------------- M1, Derbyshire Location: South Of Junction 25 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 3486 metres Description: Next planned works 29-07-08 will be lane 3 closures north and southbound 21:00 to 05:00 hours or lane 2 and 3 closed southbound with lane 3 closure northbound 22:00 to 05:00 hours. Cyclic maintenance programme. [E446972,N333653] ---------------------------------------------------------------------------------------------- M1, Derbyshire Location: North Of Junction 24 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 4257 metres Description: Next planned works 29-07-08 will be lane 3 closures north and southbound 21:00 to 05:00 hours or lane 2 and 3 closed southbound with lane 3 closure northbound 22:00 to 05:00 hours. Cyclic maintenance programme. [E447030,N329670] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Hertfordshire Location: Jct 5 to Jct 4 Period: 27-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 1700 metres Description: 22.00hrs - 05.30hrs Lane 3 and lane 4 both carriagways, due to electrical faults. [E513412,N197824] ---------------------------------------------------------------------------------------------- M1, Hertfordshire Location: Jct 6a to Jct 8 Period: 16-Jul-2007 to 31-Dec-2008 Effect: Severe (more than 30 mins) Length: 4968 metres Description: 00.00 - 00.00, Both carriageways, contraflow with a 50 mph speed limit [E515497,N195722] ---------------------------------------------------------------------------------------------- M1, Hertfordshire Location: Jct 8 to Jct 10/10a Period: 13-Mar-2006 to 31-Mar-2009 Effect: Severe (more than 30 mins) Length: 13217 metres Description: Various traffic management northbound and southbound 24 hrs due to major motorway widening scheme. [E509007,N214717] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Leeds Location: M1 Jct 40 to Jct 41 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 3509 metres Description: Lane 3 closure northbound and southbound for survey works, 2100 - 0530 hrs [E429784,N422807] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Leeds Location: Jct 41 - 42 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 3559 metres Description: Lane 3 closure northbound and southbound for survey works, 2100 - 0530 hrs. [E431340,N425067] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Leeds Location: Jct 41 to Jct 42 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 3597 metres Description: Lane 3 closure northbound and southbound for survey works, 2000 - 0600 hrs [E431340,N425067] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Leeds Location: Jct 40 - 41 Period: 02-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 3508 metres Description: Lane 3 closure northbound and southbound for electrical works, 2000 - 0600 hrs. [E429781,N422809] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Leicestershire Location: M1 Jct 21 Period: 20-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 686 metres Description: Carriageway Reconstruction Lane 1 & 2 Closure on the Exit Slip Southbound Between 2000-0630 [E454637,N300212] ---------------------------------------------------------------------------------------------- M1, Leicestershire Location: Jct 19 Period: 30-Aug-2008 to 31-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 575 metres Description: Carriage Maintenance. Full closure of the Southbound carriageway between 2000-0600 [E455845,N279508] ---------------------------------------------------------------------------------------------- M1, Leicestershire Location: Jct 19 Period: 06-Sep-2008 to 07-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 575 metres Description: Carriage Maintenance. Full closure of the Southbound carriageway between 2000-0600 [E455845,N279508] ---------------------------------------------------------------------------------------------- M1, Leicestershire Location: Between Jct 23a & Jct 24 Period: 01-Sep-2008 to 15-Sep-2008 Effect: Slight (less than 10 mins) Length: 2475 metres Description: Carriageway Reconstruction.Hardshoulder running northbound between 2200-0600. A 50mph speed limit to be in pace. No works between 5-7th September due to major event [E446948,N324576] ---------------------------------------------------------------------------------------------- M1, Leicestershire Location: jct 24 Period: 01-Sep-2008 to 15-Sep-2008 Effect: Slight (less than 10 mins) Length: 529 metres Description: Carriageway reconstruction lane 1 and lane 2 closure Northbound between 22:00 - 06:00. No works between 5-7th September due to major event [E447278,N326167] ---------------------------------------------------------------------------------------------- M1, Leicestershire Location: M1 Jct 24 Northbound Exit Slip Road Period: 01-Sep-2008 to 15-Sep-2008 Effect: Slight (less than 10 mins) Length: 661 metres Description: Carriageway reconstruction, Northbound exit slip road between 22:00 - 06:00. No works between 5-7th September due to major event [E447278,N326167] ---------------------------------------------------------------------------------------------- M1, Northamptonshire Location: Jct 16 to Jct 17 Period: 26-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 2151 metres Description: Lane closure Northbound 2300 - 0600 hrs due to essential maintenance. [E463131,N262243] ---------------------------------------------------------------------------------------------- M1, Northamptonshire Location: M1 Jct 19 Period: 30-Aug-2008 to 31-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 1856 metres Description: Carriageway closure southbound 2000-0600hrs due to essential maintenance. [E456426,N277635] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Northamptonshire Location: Jct 16 to Jct 17 Period: 30-Aug-2008 to 31-Aug-2008 Effect: Slight (less than 10 mins) Length: 2151 metres Description: Lane closure Northbound 2200 - 0800 hrs due to essential maintenance. [E463131,N262243] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Northamptonshire Location: Jct 17 to Jct 16 Period: 30-Aug-2008 to 31-Aug-2008 Effect: Slight (less than 10 mins) Length: 1114 metres Description: Lane closure Southbound 2200 - 0800 hrs due to essential maintenance. [E462258,N263472] ---------------------------------------------------------------------------------------------- M1, Northamptonshire Location: M1 Jct 19 Period: 06-Sep-2008 to 07-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1911 metres Description: Carriageway closure southbound 2000-0600hrs due to essential maintenance. [E456214,N278392] ---------------------------------------------------------------------------------------------- M1, Northamptonshire Location: Jct 16 to Jct 17 Period: 28-Jul-2008 to 13-Dec-2008 Effect: Slight (less than 10 mins) Length: 2000 metres Description: Lane closures northbound and southbound 2130-0530hrs due to essential maintenance. [E464307,N261251] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Nottinghamshire Location: Junction 27 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 4007 metres Description: Next planned works to be confirmed but will be lane 3 closures north and southbound 20.00 to 06.00 hours. Cyclic maintenance programme. [E449312,N351508] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Nottinghamshire Location: Junction 27 to 26 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 4040 metres Description: Next planned works week commencing 14-07-08. Lane 3 closures north and southbound 20.00 to 06.00 hours. Cyclic maintenance programme. [E450633,N347882] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Nottinghamshire Location: Junction 26 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 3966 metres Description: Next planned works to be confirmed but will be lane 3 closures north and southbound 20.00 to 06.00 hours. Cyclic maintenance programme. [E451177,N344348] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Nottinghamshire Location: Trowell to Junction 26 Period: 31-Mar-2008 to 27-Mar-2009 Effect: Slight (less than 10 mins) Length: 4051 metres Description: Next planned works to be confirmed but will be lane 3 closures north and southbound 20.00 to 06.00 hours. Cyclic maintenance programme. [E449641,N341108] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Nottinghamshire Location: Junction 25 (Sandiacre) to Junction 28 (South Normanton) Period: 29-Oct-2007 to 29-Oct-2010 Effect: Moderate (10 - 30 mins) Length: 20259 metres Description: * Narrow lanes and speed restrictions now in place 24/7 between junction 26 and 27 north and southbound lane 1 closure on all 4 slip roads at junction 27 and Junction 26 northbound on slip road. Plus the following variations; * 26 and 27-08-09 Lane 1 closure northbound, 21:00 to 05:00 hours. * 28-08-09 Lane 1 & 2 closure northbound, 22:00 to 05:00 hours. * 29-08-09 Lane 1 closure southbound, 22:00 to 05:00 hours. * All works are for widening of carriageway. [E448913,N348088] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, Rotherham Location: Jct 34 Period: 10-Sep-2008 to 11-Sep-2008 Effect: Slight (less than 10 mins) Length: 3023 metres Description: Lane 3 closures northbound and southbound for survey works, 2200 - 0400 hrs. [E439638,N391316] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M1, West Yorkshire Location: M1 South exit UJnc 42 closed Period: 02-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 702 metres Description: M1 S/B exit Jnc 42 [E432290,N426813] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M2, Kent Location: East and West between Chatham and Brenley Corner Period: 01-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 22492 metres Description: Horticultural Works - Daytime off peak works, east and westbound hard shoulder closure [E591143,N160786] ---------------------------------------------------------------------------------------------- M2, Kent Location: Eastbound at Junction 3 Period: 01-Sep-2008 to 30-Sep-2008 Effect: Slight (less than 10 mins) Length: 1601 metres Description: Scheme - Installation of Weather Station, Nightworks, eastbound hard shoulder closure [E574801,N163093] ---------------------------------------------------------------------------------------------- M2, Kent Location: East and Westbound between Junction 6 and Junction 7 Period: 05-Sep-2008 to 20-Dec-2008 Effect: Slight (less than 10 mins) Length: 2172 metres Description: Scheme - Selling Road & Ruins Barn Column Strengthening, 24 hour works, East and Westbound hardshoulder closure with narrow lanes [E595380,N160153] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M3, Hampshire Location: Twyford Down, Hockley link Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 558 metres Description: Lane Closure 0930 - 1530 T Mobile Maintainance works [E447256,N126074] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M3, Hampshire Location: Jct 8 to 9 (Mp 85/2 - 84/1) NB Period: 27-Aug-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 1103 metres Description: Hardshoulder Closure 0930 to 1600 Comms works for Serco [E457536,N145911] ---------------------------------------------------------------------------------------------- M3, Hampshire Location: Jct 4a On Slip North Bound Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 690 metres Description: Mobile Lane Closure 2100 to 0600 Driver Information Sign Base Construction [E484341,N156752] ---------------------------------------------------------------------------------------------- M3, Surrey Location: Jct 2 Period: 26-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 4000 metres Description: 22.00hrs - 05.30hrs Total closure, Eastbound due to Loop Cutting. Diversion to M25 Jct 13. [E501815,N167455] ---------------------------------------------------------------------------------------------- M3, Surrey Location: M25 B to M3 B Period: 26-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 500 metres Description: 22.00hrs - 05.30hrs Total closure, Eastbound due to Loop Cutting. Diversion to M3 Jct 3. [E501963,N168091] ---------------------------------------------------------------------------------------------- M3, Surrey Location: Jct 12 M3 N/E and N/W slips Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 900 metres Description: 22.00hrs - 05.30hrs Total closure eastbound for safety lanes. Diversion to Jct 11 and return. [E502023,N167914] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M3, Surrey Location: Jct 3 to Jct 2 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 1100 metres Description: 22.00hrs - 05.30hrs Lane 1 closure eastbound due to inspections. [E501157,N167529] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M3, Surrey Location: Jct 1 to Jct 2 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 1900 metres Description: 22.00hrs - 05.30hrs Lane 3 closure westbound due to trial holes and drainage investigations. [E502636,N167650] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M3, Surrey Location: Jct 3 to 4 (Mp 47/7 to 49/0) South Bound Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 1305 metres Description: White Linning Hardshoulder Running 24hrs [E490090,N161078] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M3, Surrey Location: Jct 3 to Jct 2 Period: 05-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 1100 metres Description: 22.00hrs - 05.30hrs Lane 1 closure eastbound due to inspections. [E501157,N167529] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M3, Surrey Location: Jct 3 to Jct 2 Period: 08-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 800 metres Description: 22.00hrs - 05.00hrs Lane 1 closure eastbound due to bridge joint repairs. [E501157,N167529] ---------------------------------------------------------------------------------------------- M3, Surrey Location: Jct 2 to Jct 3 Period: 05-Mar-2007 to 31-Dec-2008 Effect: Slight (less than 10 mins) Length: 2067 metres Description: 24 hrs, carriageway and entry slip roads lane 1 closure, westbound, for new road layout trial, temporary speed limit of 50 mph. [E501365,N167566] ---------------------------------------------------------------------------------------------- M3, Surrey Location: Jct 1 to Jct 2 Period: 19-May-2008 to 31-Dec-2008 Effect: Slight (less than 10 mins) Length: 2300 metres Description: 24 hrs westbound and eastbound, for Tfl viaduct refurbishment, 50/30 mph temporary speed limit. [E509614,N169737] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Avon Location: m4 E/B jct 18-17 Period: 02-Jul-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 6688 metres Description: lane 3 closure between 2000 - 0500 for deep chamber cleaning [E359037,N185825] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Avon Location: M4 jct 19-18 EB Period: 26-Aug-2008 to 22-Sep-2008 Effect: Slight (less than 10 mins) Length: 3421 metres Description: 24hr variogaurd with narrow lanes with 50 mph speed limit for geotechnical works [E368376,N178190] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: J11 (Mp 65/3 to 64/8) EB Period: 26-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 507 metres Description: Hardshoulder 0900 to 1600 improvement scheme - Strrimming [E472404,N168734] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 12 to 13 (Mp 76/3 to 77/5) Westbound Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 1183 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E462860,N173455] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 13 to 12 (Mp 85/6 to 84/4) Eastbound Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 1206 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E454305,N173955] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 12 to 13 (Mp 83/9 to 85/1) Westbound Period: 02-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 1188 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E454298,N173930] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 13 to 12 (Mp 82/6 to 81/4) Eastbound Period: 02-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 1211 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E456747,N173818] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 12 to 13 (Mp 89/0 to 90/2) Westbound Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 1169 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E449889,N173593] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 13 to 12 (Mp 79/5 to 78/3) Eastbound Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 1168 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E460474,N173811] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 13 to 12 (Mp 88/5 to 86/1) Eastbound Period: 04-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 2392 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E451893,N173984] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: J11 (Mp 68/0 to 65/0) WB & EB Period: 14-Jul-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 3024 metres Description: Lane closure 2100 to 0600 improvement scheme [E470987,N169017] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: J11 On & Off slips WB & EB Period: 14-Jul-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 736 metres Description: Lane closure 2100 to 0600 improvement scheme (survey) [E471693,N168817] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 13 to 12 (Mp 76/5 to 74/5) Eastbound Period: 05-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 1956 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E463578,N173015] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 13 to 14 (Mp 96/0 to 97/2) Westbound Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 1793 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E442398,N172679] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 14 to 13 (Mp 101/2 to 100/0) Eastbound Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 1219 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E440203,N172282] ---------------------------------------------------------------------------------------------- M4, Berkshire Location: Jct 10 Link Rd 5 Period: 08-Sep-2008 to 09-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 910 metres Description: Closed Follow Diversion 2200 to 0600 Communications [E479665,N170925] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 13 to 14 (Mp 97/8 to 100/3) Westbound Period: 09-Sep-2008 to 10-Sep-2008 Effect: Slight (less than 10 mins) Length: 2375 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E440203,N172282] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Berkshire Location: Jct 14 to 13 (Mp 96/5 to 93/3) Eastbound Period: 09-Sep-2008 to 11-Sep-2008 Effect: Slight (less than 10 mins) Length: 3179 metres Description: Lane 1 Closure 2100 to 0600 Maintenance Repairs to MS4 [E444804,N173000] ---------------------------------------------------------------------------------------------- M4, Berkshire Location: Jct 13 All Slips E&W Bound Period: 08-Sep-2008 to 12-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 614 metres Description: Closed Follow Diversion 2200 to 0600 Inlay Works [E447750,N172920] ---------------------------------------------------------------------------------------------- M4, Berkshire Location: Jct 6 Inc Off Slips A&B C/ways Period: 26-Nov-2007 to 10-Feb-2009 Effect: Slight (less than 10 mins) Length: 1474 metres Description: Narrow Lanes 24hrs Bridge strengthening + New hardshoulder [E495591,N179347] ---------------------------------------------------------------------------------------------- M4, Hillingdon Location: Jct 4 Period: 03-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 800 metres Description: 09.30hrs - 16.00hrs Hardshoulder closure both carriageways due to survey works. [E507507,N178531] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Hillingdon Location: Jct 4 Period: 12-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 1400 metres Description: 23.00hrs - 02.00hrs Lane 1 closure northbound, due to signal repairs. [E507483,N177774] ---------------------------------------------------------------------------------------------- M4, Hounslow Location: Jct 1 to Jct 3 Period: 01-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 5500 metres Description: 21.00hrs - 06.00hrs Lane 1 closure westbound, due to routine maintenance. [E517367,N178362] ---------------------------------------------------------------------------------------------- M4, Hounslow Location: Jct 3 to Jct 1 Period: 08-Sep-2008 to 11-Sep-2008 Effect: Slight (less than 10 mins) Length: 7000 metres Description: 21.00hrs - 06.00hrs Lane 1 closure eastbound, due to routine maintenance.. [E517058,N178340] ---------------------------------------------------------------------------------------------- M4, S. Bucks Location: Jct 2 to Jct 4 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 3500 metres Description: 22.00hrs - 05.30hrs Lane 2 and 3 closure westbound due to sign works. [E507947,N178445] ---------------------------------------------------------------------------------------------- M4, S. Bucks Location: Jct 3 to Jct 5 Period: 29-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 3500 metres Description: 22.00hrs - 05.30hrs Lane 2 and 3 closure westbound due to sign works. [E505117,N178380] ---------------------------------------------------------------------------------------------- M4, S. Bucks Location: Jct 6 to 7 (Mp 38/0 to 38/8) West Bound Period: 08-Sep-2008 to 09-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2749 metres Description: Closed Follow Diversion 2200 to 0600 C/way Works [E494348,N179737] ---------------------------------------------------------------------------------------------- M4, S. Bucks Location: Jct 6 to 7 (Mp 38/8 to 39/8) West Bound Period: 08-Sep-2008 to 09-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2749 metres Description: Closed Follow Diversion 2200 to 0600 C/way Works [E494348,N179737] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: Jct 14 (Mp 120/0 to 122/0) West Bound Period: 27-Jul-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 2968 metres Description: Hardshoulder Closure 24hr Remedial Works [E420942,N180815] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: M4, Jct 15-16 Period: 06-Sep-2008 to 07-Sep-2008 Effect: Slight (less than 10 mins) Length: 1453 metres Description: full carriageway closure for bridge demolition between 19:00 - 07:00 [E415841,N181750] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: M4 J 15 to J16 Both. Period: 06-Sep-2008 to 07-Sep-2008 Effect: Slight (less than 10 mins) Length: 4134 metres Description: Hard Shoulder and Lane one Closure from 1500 to 1000 for bridge demolition preparation. [E413100,N182316] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: M4 J 15 to J 16 Both Period: 07-Sep-2008 to 07-Sep-2008 Effect: Slight (less than 10 mins) Length: 4023 metres Description: Lane 3 closure from 0700 to 1200 for central reserve barrier. [E413100,N182316] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: M4 Jct17-16, both Period: 02-Sep-2008 to 21-Sep-2008 Effect: Slight (less than 10 mins) Length: 3525 metres Description: 24 hour hard shoulder closure and lane 3 closure(off peak) for removal of central reservation signs [E405577,N183818] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: M4 J 16 to J 17 Both Period: 22-Aug-2008 to 22-Sep-2008 Effect: Slight (less than 10 mins) Length: 20711 metres Description: Lane 3 closure from 0900 to 1600 for removal of matrix signs. [E401002,N181797] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: M4 Jct17-16, both Period: 02-Sep-2008 to 22-Sep-2008 Effect: Slight (less than 10 mins) Length: 3489 metres Description: 24 hour hard shoulder closure and lane 3 closure(off peak) for removal of central reservation signs [E398322,N181045] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: M4 Jct 16 - 17 WB Period: 28-Jul-2008 to 18-Oct-2008 Effect: Slight (less than 10 mins) Length: 20124 metres Description: 24Hr Hardshoulder Closure and off peak lane 1 closure for remedial works [E401008,N181895] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: M4 Jct 15 - 16 Period: 04-Aug-2008 to 19-Oct-2008 Effect: Slight (less than 10 mins) Length: 8885 metres Description: 24Hr Hardshoulder closure and offbeak lane 1 closure for remdial works [E414161,N182042] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M4, Wiltshire Location: Jct 14 to 15 A&B C/ways Period: 04-Aug-2008 to 03-Mar-2009 Effect: Slight (less than 10 mins) Length: 1000 metres Description: Lane Closures 1/2 2100 to 0600 MS4 Sign Erection [E420942,N180815] ---------------------------------------------------------------------------------------------- M5, Avon Location: M5 J 20 to J 21 NB. Period: 26-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 9374 metres Description: HS Lane 1, Lane 2 and lane 3 from 2000 to 0600 for Stud/liners. [E339782,N166370] ---------------------------------------------------------------------------------------------- M5, Avon Location: M5 jct 18 NB Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 777 metres Description: lane 2 closure between 2000 - 0500 for street lightinspections [E352705,N178153] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Avon Location: m5 jct 21 NB Period: 30-Jul-2008 to 14-Sep-2008 Effect: Slight (less than 10 mins) Length: 1013 metres Description: 24 hr H/S and lane one closure to replace gully tops [E337804,N161873] ---------------------------------------------------------------------------------------------- M5, Avon Location: M5, SB, Jct 20 Period: 08-Sep-2008 to 22-Sep-2008 Effect: Slight (less than 10 mins) Length: 599 metres Description: slip road closure for upgrade of white lines and road stud between 20.00-0500 [E341688,N170341] ---------------------------------------------------------------------------------------------- M5, Avon Location: M5, Avonmouth Bridge, NB and SB Period: 18-Aug-2008 to 22-Dec-2008 Effect: Moderate (10 - 30 mins) Length: 723 metres Description: Contraflow, narrow lanes, single lane running in operation to carry out resurfacing of the bridge [E353231,N178237] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Devon Location: M5 jct 27 NB Period: 27-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 552 metres Description: hard shoulder closure on slip between 0900 - 1600 for Geo Work [E304774,N114040] ---------------------------------------------------------------------------------------------- M5, Devon Location: M5, Jct 30 SB Period: 08-Sep-2008 to 19-Dec-2008 Effect: Slight (less than 10 mins) Length: 2830 metres Description: various TM layouts for painting of bridge with 50 mph spped restrictions between 22:00 - 06:00 [E296234,N90370] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Dudley Location: Junction 3 to junction 2, northbound Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 738 metres Description: Hardshoulder closure from 2100 - 0500 hrs for safety fence repairs [E398745,N286532] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Gloucestershire Location: M5 J 11 to 11a both. Period: 27-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 615 metres Description: Lane 3 Northbound closed from 2000 to 0500 for coring and sampling. [E389716,N220596] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Sandwell Location: Junction 1 northbound entry slip road Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 536 metres Description: Lane 2 closure from 2100 - 0500 hrs for the installation of diversion route signage [E401936,N291127] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Sandwell Location: Junction 1 to junction 2, both directions Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 2034 metres Description: Lane 3 closures from 2100 - 0500 hrs for electrical works [E400196,N289545] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Somerset Location: M5 J 24 NB SLip. Period: 28-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 533 metres Description: Full Closure of J24 slip. 2100 to 0500 for installation of road loop. [E330280,N133787] ---------------------------------------------------------------------------------------------- M5, Somerset Location: M5 J23 Southbound Entry slip road Period: 08-Sep-2008 to 22-Sep-2008 Effect: Slight (less than 10 mins) Length: 624 metres Description: Closure of S/B entry slip road to enable patching works to take place [E331517,N141044] ---------------------------------------------------------------------------------------------- M5, Worcestershire Location: Junction 4a, southbound Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 1046 metres Description: Lane 1 closure from 2100 - 0500 hrs for bridge inspections [E395218,N272877] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Worcestershire Location: Junction 4 southbound exit slip road Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 542 metres Description: Lane 1 or lane 2 closure as required from 2100 - 0500 hrs for litter picking, strimming and drainage works [E396880,N276171] ---------------------------------------------------------------------------------------------- M5, Worcestershire Location: Junction 4a, northbound Period: 04-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 1026 metres Description: Lane 1 closure from 2100 - 0500 hrs for bridge inspections [E395235,N272998] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Worcestershire Location: Junction 4 southbound entry slip road Period: 04-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 638 metres Description: Lane 1 closure from 2100 - 0500 hrs for litter picking, strimming and drainage works [E396793,N275253] ---------------------------------------------------------------------------------------------- M5, Worcestershire Location: Various locations Period: 01-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 509 metres Description: Hard shoulder closure in operation 0930 - 1530 hrs for sweeping [E390655,N259750] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M5, Worcestershire Location: Junction 4a to junction 2, both directions Period: 01-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 3349 metres Description: Nightly lane 1 closures from 2100 - 0500 hrs for drainage works and carriageway sweeping at various locations [E397644,N278868] ---------------------------------------------------------------------------------------------- M5, Worcestershire Location: Junction 4a, M5 north to M42 & M42 south to M5 link roads Period: 05-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 2029 metres Description: Lane 1 closures from 2100 - 0500 hrs for bridge inspections [E395368,N272343] ---------------------------------------------------------------------------------------------- M6, Birmingham Location: Junction 6 to junction 7, both directions Period: 27-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 883 metres Description: Nightly lane 3 northbound closed and lanes 2 & 3 southbound closed from 2100 - 0500 hrs for safety fence repairs [E405680,N294233] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Birmingham Location: Junction 6 to junction 7, both directions Period: 04-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 883 metres Description: Lane 3 northbound closed and lanes 2 & 3 southbound closed from 2100 - 0500 hrs for safety fence repairs [E405680,N294233] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Birmingham Location: Junction 6 to junction 7, both directions Period: 05-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 1044 metres Description: Lane 3 closures from 2100 - 0500 hrs for electrical works [E407894,N291833] ---------------------------------------------------------------------------------------------- M6, Birmingham Location: Junction 6 link roads into City and Out of City to Junction 6 Period: 08-Sep-2008 to 27-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 796 metres Description: Full overnight closures fro 2100 - 0500 hrs for carriageway resurfacing, white lining and bridge joint repairs (Gravelly Into City, Tyburn Road Into City, M6 north into City M6 south into City Link Roads) [E409331,N290210] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Birmingham Location: Junction 4 to junction 5, both directions Period: 27-Aug-2008 to 31-Oct-2009 Effect: Slight (less than 10 mins) Length: 7928 metres Description: Various daily & nightly 24 hour closures for ATM works to include narrow lanes, hardshoulder ruuning and 50mph speed limit [E416968,N289074] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Cheshire Location: Jct 16 to 17 North and Southbound Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 3657 metres Description: Lane three closure both directions overnight for barrier maintenance [E377515,N359119] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Cheshire Location: Jct 17 to 18 North and Southbound Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 4060 metres Description: Lane three closure both directions overnight for barrier maintenance [E376584,N362658] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Cheshire Location: Northbound, J19 Exit Slip Period: 31-Aug-2008 to 31-Aug-2008 Effect: Slight (less than 10 mins) Length: 592 metres Description: Lane 1 closed with switching on exit slip road to carry out essential maintenance. [E372569,N379294] ---------------------------------------------------------------------------------------------- M6, Cheshire Location: Jct 20 Slips Southbound and link from A50 to M56 East and West Period: 03-Sep-2008 to 04-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1205 metres Description: Total closure on slip road southbound overnight for essential maintenance [E366531,N384597] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Cheshire Location: Jct 22 to 23 North and Southbound and Jct 22 Northbound Access Slip Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 3045 metres Description: Lane two and three closure both directions overnight for essential maintenance [E360588,N394798] ---------------------------------------------------------------------------------------------- M6, Cheshire Location: Southbound, J21A - J21 Period: 09-Sep-2008 to 30-Sep-2008 Effect: Slight (less than 10 mins) Length: 2202 metres Description: Continuous hard shoulder closure to allow access to carry out maintenance work to pylons and overhead pylon lines. [E364208,N391106] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Cumbria Location: Southbound Between Jct 37 and Jct 36 Mp 411/0 - 408/0 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 3000 metres Description: Lane 1 closed Southbound for Coring Works 2000 - 0400 [E355055,N484680] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Cumbria Location: Jct 41 to Jct 42 at MP 482/4 - 483/7 Period: 01-Sep-2008 to 30-Nov-2008 Effect: Slight (less than 10 mins) Length: 1300 metres Description: All Lanes closed with Switching throughout the period for Parapet Replacement at 8 Bridges and N/B Deck Refurbishments at 8 Bridges and Bearing shelf Drainage improvement works at 7 Bridges 24h [E343421,N550704] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Lancashire Location: Jct 31a - 32 MP 354/0 - 357/7 Period: 31-Aug-2008 to 01-Sep-2008 Effect: Slight (less than 10 mins) Length: 2600 metres Description: Lane 3 closed both directions 2200 - 0600 hrs for temporary diversion of central reserve lighting cable [E354307,N434843] ---------------------------------------------------------------------------------------------- M6, Lancashire Location: Jct 32 - 33 MP 357/1 - 367/1 Period: 01-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 7337 metres Description: Lane closures with switching across all 3 lanes both directions 2000 - 0500 hrs for roadmarking renewals and Resurfacing Southbound [E352666,N438523] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Lancashire Location: Jct 30 North and Southbound Period: 04-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 1328 metres Description: Hardshoulder and lane one closure both directions overnight for inspections [E357183,N426463] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Lancashire Location: Northbound, J29 - J30 Period: 06-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 939 metres Description: Hard shoulder and lane 1 closed to carry out essential maintenance. [E357135,N425996] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Lancashire Location: Northbound Between Jct 33 and Jct 34 at MP 377/7 Period: 06-Sep-2008 to 07-Sep-2008 Effect: Slight (less than 10 mins) Length: 2900 metres Description: Lane 1 closed Northbound for Coring Works 2000 - 0400 [E348880,N456294] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Lancashire Location: Jct 27 to 28 and Jct 27 Access Slips North and Southbound Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 4038 metres Description: Lane two and three closure both directions overnight for essential maintenance [E354246,N411102] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Lancashire Location: Jct 28 Access and Exit Slips North and Southbound Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 507 metres Description: Lane two closure both directions overnight for essential maintenance [E355426,N422093] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Lancashire Location: Jct 27 to 28 North and Southbound Period: 09-Sep-2008 to 10-Sep-2008 Effect: Slight (less than 10 mins) Length: 3989 metres Description: Lane two and three closure both directions overnight for essential maintenance [E354433,N415464] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Lancashire Location: Jct 27 to 28 North and Southbound Period: 10-Sep-2008 to 11-Sep-2008 Effect: Slight (less than 10 mins) Length: 4012 metres Description: Lane two and three closure both directions overnight for essential maintenance [E354688,N419114] ---------------------------------------------------------------------------------------------- M6, Lancashire Location: Jct 28 to 29 North and Southbound Period: 11-Sep-2008 to 12-Sep-2008 Effect: Slight (less than 10 mins) Length: 4046 metres Description: Hardshoulder, lane one and lane two closure both directions overnight for preparatory work [E355511,N422691] ---------------------------------------------------------------------------------------------- M6, Leicestershire Location: M6 Joins the M1 Jct 19 Period: 30-Aug-2008 to 31-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 1858 metres Description: Carriageway closure southbound 2000-0600hrs due to essential maintenance. [E455928,N278491] ---------------------------------------------------------------------------------------------- M6, Leicestershire Location: M6 Joins the M1 Jct 19 Period: 06-Sep-2008 to 07-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1858 metres Description: Lane closures southbound 2000-0600hrs due to essential maintenance. [E455928,N278491] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Sandwell Location: Junction 7 southbound entry slip road Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 640 metres Description: Lane 1 or 2 closure as required from 2100 - 0500 hrs for overhead gantry works [E404941,N294948] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Sandwell Location: Junction 8, M6 south to M5 south Period: 30-Aug-2008 to 31-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 1968 metres Description: Full overnight closure from 2100 - 0500 hrs for bridge repairs [E402057,N294726] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Sandwell Location: Junction 7 northbound exit slip road Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 574 metres Description: Lane 1 closure from 2100 - 0500 hrs for the installation of diversion route signage [E404968,N294869] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Sandwell Location: Junction 8, southbound Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 1171 metres Description: Single lane running (either hardshoulder or lane 3) from 2200 - 0500 hrs for installation of traffic sensors for Midlands TechMAC [E402547,N294955] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Sandwell Location: Junction 8, M6 south to M5 south Period: 06-Sep-2008 to 07-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1968 metres Description: Full overnight closure from 2100 - 0500 hrs for bridge repairs [E402057,N294726] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Sandwell Location: Junction 7 southbound exit slip road Period: 08-Sep-2008 to 13-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 410 metres Description: Full overnight closure from 2100 - 0500 hrs for sign installation as part of Network Diversion Scheme [E404326,N294942] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Sandwell Location: Junction 7 northbound entry slip road Period: 08-Sep-2008 to 13-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 414 metres Description: Full overnight closure from 2100 - 0500 hrs for sign installation as part of Network Diversion Scheme [E404328,N294881] ---------------------------------------------------------------------------------------------- M6, Solihull Location: Junction 4 to junction 5, both directions Period: 26-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 3616 metres Description: Nightly lane 2 & 3 closures northbound and lane 3 closure southbound from 2100 - 0500 hrs for drainage works [E417237,N289812] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Solihull Location: Junction 4 to junction 5, both directions Period: 26-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 1810 metres Description: Nightly lane 1 closures from 2100 - 0600 hrs for pre ATM Ground investigation works at various locations [E417533,N289523] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Solihull Location: Junction 5 to junction 4, southbound Period: 01-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 4363 metres Description: Daily (0500 - 2100) hardshoulder & nightly (2100 - 0500) lane 1 closures for pre ATM Ground investigation works at various locations [E417162,N289589] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Solihull Location: Junction 4 to junction 5, both directions Period: 01-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 3616 metres Description: Nightly lane 2 & 3 closures northbound and lane 3 closure southbound from 2100 - 0500 hrs for drainage works [E417237,N289812] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, St Helens Location: Jct 22 to 24 and Jct 23 Access Slips North and Southbound Period: 02-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 4047 metres Description: Lane two and three closure both directions overnight for essential maintenance [E358228,N397263] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Staffordshire Location: Junction 11 northbound exit slip road Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 547 metres Description: Lane 1 closure switching to lane 2 closure as required from 2000 - 0500 hrs for installation of traffic sensors [E395877,N306219] ---------------------------------------------------------------------------------------------- M6, Staffordshire Location: Jct 13 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 896 metres Description: Communications, carriageway closure, Northbound between 22:00 - 05:00 [E392558,N318886] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Staffordshire Location: Between Keele Services and Jct 16 Period: 02-Sep-2008 to 03-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1098 metres Description: Communications, hardshoulder, lane 1 and lane 2 closures, northbound between 22:00 - 05:00 [E378020,N349100] ---------------------------------------------------------------------------------------------- M6, Staffordshire Location: Jct 13 Period: 01-Sep-2008 to 08-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 5038 metres Description: Remedial works. Hardshoulder running, will be carrried out in one direction then will switch to the other. Works will be between 2200-0600. A 50mph speed restriction wil be in place for the duration. [E392971,N317576] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Staffordshire Location: Between Jct 12 and Jct 13 Period: 08-Sep-2008 to 10-Sep-2008 Effect: Slight (less than 10 mins) Length: 1023 metres Description: Inspection/Survey, Hardshoulder, lane 1 and 2 closures on the 1st night and lane 2 and 3 closures on the 2nd, all Northbound between 22:00 - 05:00 [E393410,N315688] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Walsall Location: Junction 10 to junction 10a, both directions Period: 04-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 1731 metres Description: Lane 3 closures from 2100 - 0500 hrs for electrical works [E398964,N299840] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Walsall Location: Junction 8 to junction 10a, both directions Period: 01-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 6295 metres Description: Daily (0500 - 2100) hardshoulder & nightly (2100 - 0500) lane 1 closures for pre ATM Ground investigation works at various locations [E399521,N297899] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Walsall Location: Junction 10 to junction 10a, both directions Period: 08-Sep-2008 to 12-Sep-2008 Effect: Slight (less than 10 mins) Length: 2045 metres Description: Nightly hardshoulder running from 2100 - 0500 hrs for the installation of traffic sensors [E398824,N300364] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Warwickshire Location: Jct 2 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 924 metres Description: Communications, carriageway closure, Southbound between 22:00 - 05:00 [E440343,N282294] ---------------------------------------------------------------------------------------------- M6, Warwickshire Location: Between Jct 1 & Jct 2 Period: 01-Sep-2008 to 19-Dec-2008 Effect: Slight (less than 10 mins) Length: 663 metres Description: Construction Improvement Hardshoulder closure, Southbound between 2200-0627. A 50mph speed limit will be in place [E450613,N279342] ---------------------------------------------------------------------------------------------- M6, West Midlands Location: Between Jct 2 & Jct 3 Period: 31-Aug-2008 to 31-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 106 metres Description: Electrical Works Carriageway Closure Northbound between 0400-0425 [E435758,N284162] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M6, Wigan Location: Jct 25 Access and Exit Slips North and Southbound Period: 09-Sep-2008 to 10-Sep-2008 Effect: Slight (less than 10 mins) Length: 1627 metres Description: Lane two closure both directions overnight for essential maintenance [E356436,N401336] ---------------------------------------------------------------------------------------------- M6, Wigan Location: Southbound, J26 - J25 and J26 Entry Slip Period: 01-Sep-2008 to 20-Sep-2008 Effect: Slight (less than 10 mins) Length: 2041 metres Description: Hard shoulder, lane 1 and lane 2 closed with switching on the main carriageway, and total closure of the entry slip road, to carry out electrical works and resurfacing. [E354366,N402969] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Cambridgeshire Location: Jct 10 to Jct 9 Period: 26-Aug-2008 to 10-Sep-2008 Effect: Slight (less than 10 mins) Length: 2398 metres Description: Lane closure southbound 2000-0530hrs due to essential maintenance. [E548751,N243530] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 4 to Jct 5 Period: 26-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 3000 metres Description: 22.00hrs - 05.00hrs Lane 1 closure both directions, due to drainage survey. [E542573,N192831] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 7 to Jct 6 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2200 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure southbound, due to cctv schemes. [E547638,N201046] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 7 to Jct 6 Period: 02-Sep-2008 to 03-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2200 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure southbound, due to cctv schemes. [E547638,N201046] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 7 to Jct 6 Period: 03-Sep-2008 to 04-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2200 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure southbound, due to cctv schemes. [E547638,N201046] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 7 to Jct 6 Period: 04-Sep-2008 to 05-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2200 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure southbound, due to cctv schemes. [E547638,N201046] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Essex Location: Jct 4 to Jct 5 Period: 01-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 4000 metres Description: 22.00hrs - 05.00hrs lane 1 closure both carrriageways due to drainage survey. [E543570,N194501] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 7 to Jct 6 Period: 05-Sep-2008 to 06-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2200 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure southbound, due to cctv schemes. [E547638,N201046] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Essex Location: Jct 4 to Jct 5 Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 4000 metres Description: 22.00hrs - 05.00hrs lane 1 closure both carrriageways due to drainage survey. [E543570,N194501] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 6 Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 1000 metres Description: 22.00hrs - 05.30hrs Lane 3, 2 and 3 closure both carriageways due to electrical works. [E547170,N200185] ---------------------------------------------------------------------------------------------- M11, Essex Location: M25 clockwise to M11 southbound Period: 08-Sep-2008 to 12-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 500 metres Description: 22.00hrs - 05.30hrs Link road closure southbound due to anti skid works. Diversion to Jct 28 and back. [E546890,N199945] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 5 to Jct 4 Period: 09-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 3500 metres Description: 22.00hrs - 05.00hs Lane 1 and lane 2 closure with lane 3 switching to hardshoulder running southbound, due to resurfacing of carriageway. [E543560,N194459] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Essex Location: Jct 4 to Jct 5 Period: 09-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 4000 metres Description: 22.00hrs - 05.00hrs lane 1 closure northbound due to drainage survey. [E543580,N194543] ---------------------------------------------------------------------------------------------- M11, Essex Location: M25 A to M11 A slip Period: 08-Sep-2008 to 15-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 600 metres Description: 22.00hrs - 05.30hrs Link road closure nprthbound due to resurfacing and antiskid works. Diversion to Jct 28 and return. [E546662,N200350] ---------------------------------------------------------------------------------------------- M11, Essex Location: M25 clockwise to M11 southbound Period: 08-Sep-2008 to 15-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 700 metres Description: 22.00hrs - 05.30hrs Link road closure southbound due to resurfacing and antiskid works. Diversion to Jct 28 and return. [E546569,N200084] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 7 to Jct 8 Period: 08-Sep-2008 to 30-Sep-2008 Effect: Slight (less than 10 mins) Length: 13615 metres Description: Lane closure northbound 2000 - 0600hrs due to essential maintenance. [E549717,N213283] ---------------------------------------------------------------------------------------------- M11, Essex Location: Jct 8 to Jct 7 Period: 08-Sep-2008 to 30-Sep-2008 Effect: Slight (less than 10 mins) Length: 13636 metres Description: Lane closure southbound 2200-0600hrs due to essential maintenance. [E549865,N214049] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Essex Location: Jct 8 Period: 28-Aug-2008 to 07-Oct-2008 Effect: Slight (less than 10 mins) Length: 725 metres Description: Exit slip and roundabout lane closures northbound and southbound 2000-0600hrs due essential maintenance. [E551625,N221615] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Essex Location: Jct 8 to Jct 9 Period: 20-Aug-2008 to 14-Oct-2008 Effect: Moderate (10 - 30 mins) Length: 1007 metres Description: Hard Shoulder and lane closures northbound and southbound 24 hrs due to essential maintenance. [E552828,N225024] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Redbridge Location: M11 southbound to A406 westbound Period: 28-Aug-2008 to 29-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 1000 metres Description: 22.00hrs - 05.00hrs Slip road closure southbound, due to drainage survey.Diversion to redbridge. [E541398,N190543] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Redbridge Location: M11 Northbound to A406 Eastbound Period: 29-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 900 metres Description: 22.00hrs - 05.00hrs Slip road closure northbound, due to drainage survey.Diversion to redbridge. [E541262,N190484] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Redbridge Location: M11 Northbound to A406 Westbound Period: 01-Sep-2008 to 03-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 900 metres Description: 22.00hrs - 05.00hrs Slip road closure northbound, due to drainage survey.Diversion to A406. [E541319,N190506] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Redbridge Location: Jct 4 to Jct 5 Period: 01-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 700 metres Description: 22.00hrs - 05.00hrs lane 1 closure both carrriageways due to drainage survey. [E541262,N190484] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Redbridge Location: Jct 4 to Jct 5 Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 700 metres Description: 22.00hrs - 05.00hrs lane 1 closure both carrriageways due to drainage survey. [E541262,N190484] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M11, Redbridge Location: Jct 4 to Jct 5 Period: 09-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 700 metres Description: 22.00hrs - 05.00hrs lane 1 closure northbound due to drainage survey. [E541262,N190484] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: Jct 1 to Jct 3 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 3900 metres Description: 22.00hrs - 05.00hrs Lane 2 and 3 closure both carriageways, due to routine maintenance. [E560331,N160054] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: Jct 1 to Jct 2 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 4000 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure eastbound due to pavement surveys. [E557230,N165538] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: Jct 1 to Jct 3 Period: 02-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 2800 metres Description: 22.00hrs - 05.00hrs Lane 2 and 3 closure both carriageways, due to routine maintenance. [E562916,N159139] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: Jct 2 to Jct 1 Period: 02-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 900 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure westbound due to pavement surveys. [E557710,N165005] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: Jct 2 to Jct 1 Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 4000 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure westbound due to pavement surveys. [E555777,N166681] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: Jct 2 to Jct 1 Period: 04-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 1000 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure westbound due to pavement surveys. [E553671,N167491] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: M20 Jct 1 to M25 Jct 3 rbt Period: 04-Sep-2008 to 05-Sep-2008 Effect: Slight (less than 10 mins) Length: 800 metres Description: 22.00hrs - 05.30hrs Lane 1 closure westbound due to pavement surveys. [E553680,N167469] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: Westbound between Junctions 8 and 9 Period: 09-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 1493 metres Description: Horticultural Works - Day and Night working, westbound hard shoulder closure [E587310,N151655] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: Eastbound between Junctions 4 and 5 Period: 11-Sep-2008 to 11-Sep-2008 Effect: Slight (less than 10 mins) Length: 1079 metres Description: Horticultural Works - Day and Night working, eastbound hard shoulder closure [E571653,N158730] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: East and westbound between jct10 & jct13 & A20/A260 interchange Period: 04-May-2008 to 12-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 6522 metres Description: Various lane and slip road closures for carriageway maintenance 24 hour works- Operation Stack Scheme [E616721,N137218] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M20, Kent Location: Eastbound between Hall Road Overbrigde and Tea Pot Lane footbridge Period: 31-Aug-2008 to 25-Oct-2008 Effect: Moderate (10 - 30 mins) Length: 544 metres Description: Hard shoulder closure with narrow lanes, 24 hour works, for noise and safety barrier replacement with a temporary speed limit of 50mph - Phase 6 [E572578,N158488] ---------------------------------------------------------------------------------------------- M20, Kent Location: East and westbound between jcts 4 & 8 Period: 01-Feb-2007 to 22-Dec-2008 Effect: Slight (less than 10 mins) Length: 9217 metres Description: Controlled motorway scheme - , east and westbound various lane closures and speed limits [E575755,N157836] ---------------------------------------------------------------------------------------------- M20, Kent Location: Jct 3 to Jct 4 Period: 08-Sep-2008 to 30-Jan-2009 Effect: Slight (less than 10 mins) Length: 1400 metres Description: 24 hrs, hardshoulder closure, eastbound and westbound, for installing lighting columns. [E564646,N159169] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M23, Surrey Location: M25 A to M23 A Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2300 metres Description: 22.00hrs - 05.00hrs Total closure southbound due to white lining works. Diversion to Jct 8. [E532195,N152887] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M23, Surrey Location: M25 A to M23 B Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1000 metres Description: 22.00hrs - 05.00hrs Total closure northbound due to white lining works. Diversion to Jct 8. [E530976,N153380] ---------------------------------------------------------------------------------------------- M23, Surrey Location: Jct 8 to Jct 7 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 800 metres Description: 22.00hrs - 05.30hrs lane 2 and 3 into lane 2 closure, northbound, for installing cables at compound entrance. [E529071,N154505] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M23, Surrey Location: Jct 9 to Jct 8 Period: 08-Sep-2008 to 10-Sep-2008 Effect: Slight (less than 10 mins) Length: 1400 metres Description: 22.00hrs - 05.30hrs Various lane closure northbound due to white lining. [E530998,N152354] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M23, Surrey Location: Jct 8 to Jct 9 Period: 09-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 1100 metres Description: 22.00hrs - 05.30hrs Various lane closure southbound due to white lining. [E531267,N151743] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M23, Surrey Location: North and Southbound between Junctions 8 and 9 Period: 09-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 1575 metres Description: Road Markings - Area 5 Works, Nightworks, north and southbound lane closures with switching [E531560,N150301] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Enfield Location: Jct 24 to Jct 25 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 3200 metres Description: 22.00hrs - 05.00hrs Lane 3 closure, clockwise, for centre reservation visits. [E530226,N200639] ---------------------------------------------------------------------------------------------- M25, Enfield Location: jct 24 to Jct 26 Period: 29-Aug-2008 to 31-Aug-2008 Effect: Slight (less than 10 mins) Length: 1500 metres Description: 22.00hrs - 05.30hrs lane 1 and lane 2 closure clockwise, due to tunnel maintenance. [E535497,N200021] ---------------------------------------------------------------------------------------------- M25, Enfield Location: Jct 25 entry slip Period: 29-Aug-2008 to 31-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 300 metres Description: 22.00hrs - 05.30hrs Slip road closure clockwise, due to tunnel maintenance.Diversion to Jct 24 and back [E535256,N200079] ---------------------------------------------------------------------------------------------- M25, Enfield Location: Jct 23 to Jct 25 Period: 01-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 3500 metres Description: 22.00hrs - 05.30hrs Lane 2 and 3 closure clockwise due to fence replacements. [E527479,N200288] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Enfield Location: Jct 24 to Jct 25 Period: 08-Sep-2008 to 11-Sep-2008 Effect: Slight (less than 10 mins) Length: 2400 metres Description: 22.00hrs - 05.00hrs Various lane closures clockwise, due to essential maintenance. [E527767,N200329] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 28 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 800 metres Description: 22.00hrs - 05.30hrs Lane 3, 2 and 3 closure both carriageways due to electrical works. [E557017,N191971] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 29 to Jct 31 Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 2000 metres Description: 22.00hrs - 05.00hrs Lane 2 and lane 3 closure, clockwise for safety fence repair [E557552,N179918] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 28 to Jct 26 Period: 27-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 2000 metres Description: 22.00hrs - 05.30hrs Lane 1, 2 and 3 closure Anticlockwise, due to bridge joint replacement. [E547415,N199750] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 27 Period: 30-Aug-2008 to 31-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 1700 metres Description: 22.00hrs - 05.30hrs Total closure clockwise due to resurfacing works. Diversion to M11 Jct 7 and back. [E546515,N200163] ---------------------------------------------------------------------------------------------- M25, Essex Location: M11 A to M25 A slip Period: 30-Aug-2008 to 31-Aug-2008 Effect: Slight (less than 10 mins) Length: 900 metres Description: 22.00hrs - 05.30hrs Lane 2 closure anticlockwise due to resurfacing works. [E547032,N199899] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 31 to Jct 1A Period: 30-Aug-2008 to 31-Aug-2008 Effect: Slight (less than 10 mins) Length: 600 metres Description: 22.00hrs - 05.30hrs Lane 3 and 4 closure clockwise due to toll plaza works. [E557515,N178516] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 27 to Jct 26 Period: 26-Aug-2008 to 01-Sep-2008 Effect: Slight (less than 10 mins) Length: 4100 metres Description: 2200 - 0500hrs, various lane closures, anticlockwise for tunnel refurbishment [E545565,N200523] ---------------------------------------------------------------------------------------------- M25, Essex Location: M11 Jct 7 to M25 B Period: 26-Aug-2008 to 01-Sep-2008 Effect: Slight (less than 10 mins) Length: 1000 metres Description: 22.00hrs - 05.30hrs Lane 1 closure Clockwise and Anticlockwise due to Tunnel Refurbishment. [E547273,N200067] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 30 to Jct 29 Period: 30-Aug-2008 to 01-Sep-2008 Effect: Slight (less than 10 mins) Length: 4600 metres Description: 22.00hrs - 05.30hrs Lane 2 and lane 3 closure anticlockwise, due to road markings [E558462,N186449] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 27 Period: 31-Aug-2008 to 01-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1800 metres Description: 22.00hrs - 05.30hrs Carriageway closure anticlockwise, due to resurfacing of carriageway. Diversion to M11 Jct 7. [E547645,N199668] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 31 to Jct 1A Period: 31-Aug-2008 to 01-Sep-2008 Effect: Slight (less than 10 mins) Length: 600 metres Description: 22.00hrs - 05.30hrs Lane 3 and 4 closure clockwise due to toll plaza works. [E557515,N178516] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 28 entry slip Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 500 metres Description: 22.00hrs - 05.30hrs Total slip closure anticlockwise due to carriageways repairs. Diversion to Jct 29 and return. [E556362,N192862] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 26 to Jct 28 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Slight (less than 10 mins) Length: 1400 metres Description: 22.00hrs - 05.30hrs Lane 1, lane 2 and lane 3 closure with hardshoulder running with a 50mph speed limit, clockwise, due to bridge joint repairs. [E546260,N200272] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 26 to Jct 27 Period: 01-Sep-2008 to 03-Sep-2008 Effect: Slight (less than 10 mins) Length: 2000 metres Description: 22.00hrs - 05.30hrs Various lane closures clockwise, due to tunnel refurbishments. [E544679,N200911] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 26 to Jct 28 Period: 02-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 2000 metres Description: 22.00hrs - 05.30hrs Lane 1, lane 2 and lane 3 closure with hardshoulder running with a 50mph speed limit, anticlockwise, due to bridge joint repairs. [E547191,N199836] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 27 to Jct 28 Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 700 metres Description: 22.00hrs - 05.30hrs Lane 3 and 4 closure clockwise due to fence replacements. [E549381,N198620] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 30 to Jct 29 Period: 01-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 3000 metres Description: 22.00hrs - 05.00hrs Lane 1 and lane 2 closure anticlockwise with hardshoulder running switching to a lane 3 running, due to resurfacing of carriageway. [E557968,N183262] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 25 to Jct 26 Period: 01-Sep-2008 to 06-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2700 metres Description: 22.00hrs - 05.30hrs Various lane closure both carriageways due to electrical works [E538291,N199827] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 26 to Jct 27 Period: 04-Sep-2008 to 07-Sep-2008 Effect: Slight (less than 10 mins) Length: 2000 metres Description: 22.00hrs - 05.30hrs Various lane closures clockwise, due to tunnel refurbishments. [E544679,N200911] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 26 to Jct 25 Period: 06-Sep-2008 to 08-Sep-2008 Effect: Slight (less than 10 mins) Length: 3000 metres Description: 22.00hrs - 05.00hrs Various lane closures anticlockwise, due to bridge joint repairs. [E537716,N199848] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 25 to Jct 26 Period: 07-Sep-2008 to 08-Sep-2008 Effect: Slight (less than 10 mins) Length: 2500 metres Description: 22.00hrs - 05.00hrs Various lane closures clockwise, due to bridge joint repairs. [E539029,N199781] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 26 exit slip Period: 07-Sep-2008 to 08-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 400 metres Description: 22.00hrs - 05.00hrs Slip road closure clockwise, due to bridge joint repairs.Diversion to Jct 28 and back. [E540126,N199735] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 30 to Jct 29 Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 4600 metres Description: 22.00hrs - 05.30hrs Lane 2 and lane 3 closure anticlockwise, due to road markings [E558462,N186449] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 27 to Jct 26 Period: 09-Sep-2008 to 11-Sep-2008 Effect: Slight (less than 10 mins) Length: 2000 metres Description: 22.00hrs - 05.30hrs Various lane closures anticlockwise, due to tunnel refurbishments. [E545124,N200713] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 25 to Jct 26 Period: 08-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 2700 metres Description: 22.00hrs - 05.30hrs Lane 3, 2 and 3 closure both carriageways due to electrical works. [E538291,N199827] ---------------------------------------------------------------------------------------------- M25, Essex Location: Jct 27 Period: 08-Sep-2008 to 15-Sep-2008 Effect: Slight (less than 10 mins) Length: 600 metres Description: 22.00hrs - 05.30hrs Lane 1 closure clockwise due to resurfacing and antiskid works. Diversion to Jct 28 and return. [E545822,N200444] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 27 to Jct 26 Period: 09-Sep-2008 to 30-Dec-2009 Effect: Slight (less than 10 mins) Length: 2600 metres Description: 22.00hrs - 05.30hrs Various lane closures anticlockwise, due to tunnel refurbishments. [E545124,N200713] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Essex Location: Jct 26 to Jct 27 Period: 09-Sep-2008 to 30-Dec-2009 Effect: Slight (less than 10 mins) Length: 2300 metres Description: 22.00hrs - 05.30hrs Various lane closures clockwise, due to tunnel refurbishments. [E544679,N200911] ---------------------------------------------------------------------------------------------- M25, Havering Location: Jct 28 to Jct 29 Period: 26-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 3300 metres Description: 22.00hrs - 05.30hrs Lane 2 and lane 3 closure both carriageways, due to electrical works. [E558418,N188389] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Havering Location: Jct 29 to Jct 30 Period: 01-Sep-2008 to 03-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1000 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure clockwise due to installation of sensors. [E558543,N185585] ---------------------------------------------------------------------------------------------- M25, Havering Location: Jct 29 to Jct 30 Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 1000 metres Description: 22.00hrs - 05.00hrs Lane 1 closure clockwise due to carriageways repairs. [E558551,N188139] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Havering Location: Jct 28 to Jct 30 Period: 05-Sep-2008 to 07-Sep-2008 Effect: Slight (less than 10 mins) Length: 4200 metres Description: 22.00hrs - 05.30hrs Lane 2 and lane 3 closure clockwise, due to road markings. [E558494,N187276] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Havering Location: Jct 29 entry slip Period: 05-Sep-2008 to 07-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 300 metres Description: 22.00hrs - 05.30hrs Slip road closure clockwise, due to road markings.Diversion to Jct 28 and back. [E558633,N188076] ---------------------------------------------------------------------------------------------- M25, Havering Location: Jct 29 B entry slip Period: 07-Sep-2008 to 08-Sep-2008 Effect: Slight (less than 10 mins) Length: 800 metres Description: 22.00hrs - 05.30hrs Lane 1 slip closure anticlockwise due to carriageways repairs. [E558108,N189097] ---------------------------------------------------------------------------------------------- M25, Havering Location: Jct 29 to Jct 28 Period: 07-Sep-2008 to 08-Sep-2008 Effect: Slight (less than 10 mins) Length: 2600 metres Description: 22.00hrs - 05.30hrs Lane 2 and 3 closure anticlockwise due to carriageways repairs. [E557821,N189710] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Hertfordshire Location: Jct 25 to Jct 24 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 3100 metres Description: 22.00hrs - 05.00hrs Lane 2 and 3 closure, anticlockwise, for centre reservation visits. [E530267,N200631] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 18 to Jct 17 Period: 26-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 2400 metres Description: 22.00hrs - 05.00hrs Lane 1 and lane 2 closure with hardshoulder running switching to lane 3 running anticlockwie, due to resurfacing of carriageway. [E504206,N196351] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 18 exit slip Period: 26-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 400 metres Description: 22.00hrs - 05.00hrs Slip road closure anticlockwise, due to resurfacing . Diversion to M25 Jct 17 [E504272,N196627] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 18 entry slip Period: 26-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 300 metres Description: 22.00hrs - 05.00hrs Slip road closure anticlockwise, due to resurfacing . Diversion to M25 Jct 19 [E504129,N195987] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Hertfordshire Location: Jct 22 to Jct 24 Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 4600 metres Description: 22.00hrs - 05.00hrs Lane 2 and lane 3 closure both carriageways, due to routine maintenance. [E522192,N200889] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 20 exit slips both carriageways Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 500 metres Description: 22.00hrs - 05.00hrs Slip road closures both carriageways , due to routine maintenance.Diversion to Anticlockwise Exit - Jct 18 and back Clockwise Exit - Jct 22 and back. [E507708,N201327] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 25 to Jct 24 Period: 01-Sep-2008 to 03-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 3300 metres Description: 22.00hrs - 05.30hrs Lane 2 and lane 3 closure anticlockwise due to white lining works. [E531861,N200587] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Hertfordshire Location: Jct 22 to Jct 23 Period: 03-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 800 metres Description: 22.00hrs - 05.30hrs lane 1 closure clockwise, due to communication works. [E522608,N200192] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: M1 B to M25 A on slip Period: 04-Sep-2008 to 04-Sep-2008 Effect: Slight (less than 10 mins) Length: 600 metres Description: 09.30hrs - 16.30hrs Hardshoulder closure clockwise due to parapet repairs. [E511829,N203653] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 25 to Jct 24 Period: 03-Sep-2008 to 05-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 4000 metres Description: 22.00hrs - 05.30hrs Lane 2 and lane 3 closure anticlockwise due to white lining works. [E529632,N200533] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 18 to Jct 17 Period: 02-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 2500 metres Description: 22.00hrs - 05.00hs Lane 1 and lane 2 closure with lane 3 switching to hardshoulder running anticlockwise, due to resurfacing of carriageway. [E504206,N196351] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 18 exit slip Period: 02-Sep-2008 to 06-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 400 metres Description: 22.00hrs - 05.00hrs Slip road closure anticlockwise, due to resurfacing . Diversion to M25 Jct 17 [E504272,N196627] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 18 entry slip Period: 02-Sep-2008 to 06-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 300 metres Description: 22.00hrs - 05.00hrs Slip road closure anticlockwise, due to resurfacing . Diversion to M25 Jct 19 [E504129,N195987] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 24 B exit slip Period: 05-Jun-2008 to 06-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 200 metres Description: 22.00hrs - 05.30hrs Total closure anticlockwise due to white lining works. Diversion to Jct 23 and return. [E527296,N200262] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 25 to Jct 24 Period: 05-Sep-2008 to 06-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 2200 metres Description: 22.00hrs - 05.30hrs Lane 2 and lane 3 closure anticlockwise due to white lining works. [E527939,N200305] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Hertfordshire Location: Jct 23 entry slip Period: 07-Sep-2008 to 08-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 400 metres Description: 22.00hrs - 05.00hrs Slip road closure anticlockwise, due to essential maintenance..Diversion to Jct 24 and back. [E522177,N200388] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Hertfordshire Location: Jct 19 spur Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 2100 metres Description: 22.00hrs - 05.30hrs Lane 1 closure both carriageways, due to survey. [E507173,N198986] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 19 to Jct 17 Period: 11-Sep-2008 to 13-Sep-2008 Effect: Slight (less than 10 mins) Length: 2400 metres Description: 22.00hrs - 05.00hrs Lane 1 and lane 2 closure with hardshoulder switching to lane 3 running anticlockwise , due to resurfacing of carriageway. [E504206,N196351] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 18 exit slip Period: 11-Sep-2008 to 13-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 400 metres Description: 22.00hrs - 05.00hrs Slip road closure anticlockwise, due to resurfacing . Diversion to M25 Jct 17 [E504272,N196627] ---------------------------------------------------------------------------------------------- M25, Hertfordshire Location: Jct 18 entry slip Period: 11-Sep-2008 to 13-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 300 metres Description: 22.00hrs - 05.00hrs Slip road closure anticlockwise, due to resurfacing . Diversion to M25 Jct 19 [E504129,N195987] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Kent Location: Jct 5 to Jct 6 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 1400 metres Description: 22.00hrs - 05.00hrs Lane 3 closure both carriageways due to matrix repairs. [E541407,N154280] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Kent Location: Jct 5 spur to Jct 4 Period: 11-Sep-2008 to 12-Sep-2008 Effect: Slight (less than 10 mins) Length: 4600 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure anticlockwise due to pavement surveys. [E549907,N157594] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Kent Location: Jct 6 to Jct 5 Period: 11-Sep-2008 to 12-Sep-2008 Effect: Slight (less than 10 mins) Length: 1500 metres Description: 22.00hrs - 05.30hrs Lane 1 closure anticlockwise due to pavement surveys. [E548753,N156675] ---------------------------------------------------------------------------------------------- M25, Kent Location: Jct 1a to Jct 4 Period: 01-May-2007 to 31-Dec-2008 Effect: Moderate (10 - 30 mins) Length: 11793 metres Description: 24 hrs, various lane closure, clockwise and anticlockwise, for major widening scheme. [E553908,N170001] ---------------------------------------------------------------------------------------------- M25, Kent Location: Jct 2 Period: 01-May-2007 to 31-Dec-2008 Effect: Moderate (10 - 30 mins) Length: 850 metres Description: 24 hrs, entry slip roads various lane closure, anticlockwise, for major widening scheme. [E552995,N168176] ---------------------------------------------------------------------------------------------- M25, S. Bucks Location: M25 anticlockwise to M4 Links to both carriageways Period: 26-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 625 metres Description: 22.00hrs - 05.30hrs Link road closures anticlockwise, due to road markings . Diversion to Jct 14 and back [E504464,N178951] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, S. Bucks Location: Jct 12 to Jct 15 Period: 05-Sep-2008 to 06-Sep-2008 Effect: Slight (less than 10 mins) Length: 3200 metres Description: 00.00hrs - 04.00hrs Various lane closure clockwise due to Speed camera markings. [E503526,N175117] ---------------------------------------------------------------------------------------------- M25, S. Bucks Location: M25 clockwise to M4 Links to both carriageways Period: 01-Sep-2008 to 06-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 500 metres Description: 22.00hrs - 05.30hrs Link road closures clockwise, due to road markings . Diversion to M40 Jct 1 [E504528,N178150] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, S. Bucks Location: Jct 14 to Jct 15 Period: 08-Sep-2008 to 09-Sep-2008 Effect: Slight (less than 10 mins) Length: 3700 metres Description: 22.00hrs - 05.30hrs Lane 5 and 6 closure clockwise due to speed camera markings. [E504297,N177786] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, S. Bucks Location: Jct 17 to Jct 16 Period: 09-Sep-2008 to 10-Sep-2008 Effect: Slight (less than 10 mins) Length: 2200 metres Description: 22.00hrs - 05.30hrs Various lane closures anticlockwise, due to road markings. [E501907,N186075] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, S. Bucks Location: M25 anticlockwise to M40 westbound Period: 09-Sep-2008 to 10-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 500 metres Description: 22.00hrs - 05.30hrs Slip road closure anticlockwise, due to road markings.Diversion to Jct 14 and back. [E501904,N186036] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, S. Bucks Location: Jct 14 to Jct 15 Period: 11-Sep-2008 to 12-Sep-2008 Effect: Slight (less than 10 mins) Length: 2400 metres Description: 2200 - 0500hrs, lane 1 and 2 closure, clockwise for carriageway repairs [E504199,N176966] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, S. Bucks Location: M25 Both Directions to M4 Westbound Period: 11-Sep-2008 to 12-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 500 metres Description: 2200 - 0530hrs, link road closures, both directions, for carriageway repair, diversion to M4 Jct 4 [E504402,N178374] ---------------------------------------------------------------------------------------------- M25, S. Bucks Location: M4 Westbound to M25 both carriageways Period: 08-Sep-2008 to 13-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 700 metres Description: 22.00hrs - 05.30hrs Link road closures both carriageways, due to road markings . Diversion to M4 Jct 5 [E504906,N178321] ---------------------------------------------------------------------------------------------- M25, Surrey Location: Jct 10 to Jct 9 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 1400 metres Description: 22.00hrs - 05.00hrs Lane 2, 3 and 4 closure switching to 1,2 and 3 closure anticlockwise due to loop cutting works. [E510295,N158066] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Surrey Location: Jct 11 to Jct 10 Period: 28-Aug-2008 to 29-Aug-2008 Effect: Slight (less than 10 mins) Length: 1200 metres Description: 22.00hrs - 05.30hrs Lane 1 and 2 closure anticlockwise due to carriageway repairs. [E504892,N162987] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Surrey Location: Jct 11 and Jct 11 entry slip Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 1400 metres Description: 22.00hrs - 05.00hrs Lane 2 and 3 closure switching to lane 1 and 2 closure anticlockwise due to cutting loops. [E503760,N165231] ---------------------------------------------------------------------------------------------- M25, Surrey Location: Jct 8 Period: 26-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 1000 metres Description: 22.00hrs - 05.30hrs Lane 4 closure clockwise and anticlockwise due to ramp metering infrastructure installation. [E526799,N153107] ---------------------------------------------------------------------------------------------- M25, Surrey Location: Jct 8 entry slip road Period: 26-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 1000 metres Description: 22.00hrs - 05.30hrs Full closure anticlockwise due to ramp metering infrastructure installation. Diversion via M25 clockwise to Jct 9, then A243 to return to M25 anticlockwise. [E526530,N153063] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Surrey Location: Jct 10 to Jct 9 Period: 29-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 900 metres Description: 22.00hrs - 05.30hrs Lane 2, 3 and 4 closure anticlockwise due to carriageway repairs. [E512044,N157866] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Surrey Location: Jct 10 to Jct 9 Period: 29-Aug-2008 to 30-Aug-2008 Effect: Moderate (10 - 30 mins) Length: 900 metres Description: 23.00hrs - 05.30hrs Lane 2,3 and 4 closure anticlockwise due to patching repairs. [E512044,N157866] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Surrey Location: Clackets entry slip Period: 29-Aug-2008 to 30-Aug-2008 Effect: Slight (less than 10 mins) Length: 1200 metres Description: 23.00hrs - 07.00hrs Lane 1 closure anticlockwise due to sweeping and litterpicking. [E541270,N154285] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Surrey Location: Jct 6 to Jct 7 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 5400 metres Description: 22.00hrs - 05.00hrs Lane 1, 2, 3 and 4 closure switching to Hardshoulder, Lane 1, 2 and 3 closure clockwise due to white lining works. [E531868,N153075] ---------------------------------------------------------------------------------------------- **************** New or Amended Record **************** M25, Surrey Location: Jct 6 to Jct 7 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 5400 metres Description: 22.00hrs - 05.00hrs Lane 1, 2, 3 and 4 closure switching to Hardshoulder, Lane 1, 2 and 3 closure clockwise due to white lining works. [E531868,N153075] ---------------------------------------------------------------------------------------------- M25, Surrey Location: Jct 9 to Jct 8 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1900 metres Description: 22.00hrs - 05.30hrs, Lane 1 and lane 2 closure, anticlockwise, due to routine maintenance. [E517031,N157711] ---------------------------------------------------------------------------------------------- M25, Surrey Location: Jct 9 to Jct 8 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 600 metres Description: 22.00hrs - 05.30hrs, Slip road closure, anticlockwise, due to routine maintenance. [E516631,N158402] ---------------------------------------------------------------------------------------------- M25, Surrey Location: Jct 13 to Jct 12 Period: 01-Sep-2008 to 02-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 5300 metres Description: 22.00hrs - 05.30hrs Lane 1, 2, 3 and 4 closure anticlockwise due to speed camera marking works. [E502049,N170195] ---------------------------------------------------------------------------------------------- M25, Surrey Location: Jct 8 entry slip road Period: 02-Sep-2008 to 03-Sep-2008 Effect: Moderate (10 - 30 mins) Length: 1000 metres Description: 22.00hrs - 05.30hrs Full closure anticlockwise due to ramp metering infrastructure installation. Diversion via M25 clockwise to Jct 9, then A243 to return to M25 anticlockwise. [E526530,N153063] ---------------------------------------------------------------------------------------