On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

Contract 1: Junctions 25 to 28

How we will widen the motorway

 Cuttings and embankments

We will need to alter embankment and cutting slopes to provide space for the extra lane in each direction. We will use a range of engineering methods such as retaining walls, soil nailing or steepening of existing slopes. The main point to note is that all the work will be undertaken within the existing motorway boundary; no land will need to be acquired. This will also minimise disturbance to the local environment and residents.

Bridges

We will be widening some underbridges, and replacing one overbridge, within the existing land. Parapet heights will be modified where necessary to meet current Highways Agency standards on bridges which carry designated bridleways.