Disabled Driver Questionnaire
We want to produce a driver information programme for our disabled customers. To help us produce the best possible guidance, please take a few minutes to fill in our questionnaire.
Better information for your journey
The National Traffic Control Centre collects real-time information on road conditions.
The Project Control Framework
On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.
Traffic news on your desktop
Helpful ways to access the latest traffic information when you need it.
M6 Penkridge to Junction 13 Resurfacing
M6 Penkridge to Junction 13 Resurfacing
- Status
- Completed
- Located in
- Area 11

- Scheme type
- Other

The Project
The scheme extends over 3.7km of dual 3 lane motorway and hardshoulder and is situated between Junctions 12 to 13 of the M6 motorway through Staffordshire. After the installation of a contraflow system, the existing concrete surface was overlaid with a low noise, low spray bituminous bound material. The centre reserve was hardened, and a slip formed concrete barrier was provided. Some drainage upgrading works were also undertaken. Two underbridges and the River Penk viaduct were re-waterproofed as part of the works. Roadmarkings and traffic loops were reinstated upon completion.
The scheme started on 8 January 2007 and was completed by 7 June 2007.