Latest
M25 Hertfordshire | Anticlockwise | Heavy traffic   ...   M40 Buckinghamshire | Southbound | Accident, 1 lane closed   ...   A1(M) Cambridgeshire | Northbound | Accident   ...   M11 Essex | Southbound | Heavy traffic | Clear   ...   M6 Lancashire | Northbound | Vehicle recovery   ...   M25 Surrey | Clockwise | Heavy traffic   ...   A38 Derbyshire | Southbound | Heavy traffic   ...   M25 London | Clockwise | Accident, 2 lanes closed   ...   M6 Lancashire | Northbound | Emergency roadworks, 1 lane closed   ...   M6 Lancashire | Southbound | Emergency roadworks, 1 lane closed   ...   M6 Staffordshire | Southbound | Heavy traffic | Clear   ...   M25 Essex | Clockwise | Heavy traffic | Clear   ...   A27 Hampshire | Westbound | Heavy traffic   ...   A1 North Yorkshire | Southbound | Heavy traffic   ...   A38 Derbyshire | Southbound | Heavy traffic | Clear   ...   M3 Hampshire | Westbound | Heavy traffic | Clear   ...   M5 North Somerset | Northbound | Heavy traffic | Clear   ...   M25 Essex | Clockwise | 1 lane closed, fuel spill   ...   M4 Berkshire | Westbound | Heavy traffic | Clear   ...   A20 Kent | Eastbound | Multi-vehicle accident   ...   M67 Greater Manchester | Eastbound | Heavy traffic   ...   A1(M) South Yorkshire | Northbound | Accident, 1 lane closed   ...   M6 Staffordshire | Southbound | Broken down vehicle, 1 lane closed   ...   M180 South Yorkshire | Overturned vehicle, 1 lane closed   ...   
Home » Road Projects » Area 9 » Road Project
Contact us

by phone or email

Register for
email alerts

On information that's important to you

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

A3 Hindhead Improvement

The project will deliver quicker, more reliable journeys on a safer road.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A46 Temple Grafton to Redhill Carriageway Renewal

A46 Temple Grafton to Redhill Carriageway Renewal

Status
Completed
Located in
Area 9Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency

The Projects

To make best use of road closures and resources, two schemes were carried out at the same time at the end of summer 2007 and was completed on 3 November 2007.

We carried out work to stabilise the embankment on the A46 at Taylors Wood, 1km to the west of Stratford upon Avon.We also resurfaced nearly 2km of the A46, a further 1¾ km to the west of Taylors Wood, between The Stag public house and the Temple Grafton/Haselor turning.

Why was the work necessary?

At Taylors Wood, 1km west of Shottery Island, the road is built along the side of a hill. The embankment to the south of the road started to be unstable and tension cracks had appeared in the road surface. To stop further cracks, we strengthened the embankment and then resurfaced the road.

Slightly further west along the A46, between The Stag public house and the Temple Grafton/Haselor turning, the road surface had come to the end of its life. New kerbs were laid at certain key areas and the whole road resurfaced.

What work was done?

To stabilise the Taylors Wood embankment, gabion baskets were installed at the bottom of the slope. These are large wire mesh boxes, which are put into place, filled with large stones and have their lids wired down. Once the gabions were in place the embankment will be built up to road level and drainage installed to make sure the new embankment cannot be affected by water running of the road.

When the stabilisation works was completed new kerbs werel be put in, the road resurfaced and also completely reconstructed (360mm deep) in the cracked areas. There was also some new safety fencing installed.

The Temple Gratfon to Redhill resurfacing scheme covered the road in both directions as well as the climbing lane near to The Stag public house. Most of this was a relatively straightforward scheme where 110mm was removed from the surfacing and replaced with new material. There was however, a section of the road where deeper layers had failed as well. This meant 300mm needed to be removed and replaced. There was not enough time during an overnight road closure for 300mm of material to cool enough for traffic to run on it the following morning.  Because of this, the road needed to be closed for a full weekend.