Latest
M25 Hertfordshire | Anticlockwise | Heavy traffic   ...   M40 Buckinghamshire | Southbound | Accident, 1 lane closed   ...   A1(M) Cambridgeshire | Northbound | Accident   ...   M11 Essex | Southbound | Heavy traffic | Clear   ...   M6 Lancashire | Northbound | Vehicle recovery   ...   M25 Surrey | Clockwise | Heavy traffic   ...   A38 Derbyshire | Southbound | Heavy traffic   ...   M25 London | Clockwise | Accident, 2 lanes closed   ...   M6 Lancashire | Northbound | Emergency roadworks, 1 lane closed   ...   M6 Lancashire | Southbound | Emergency roadworks, 1 lane closed   ...   M6 Staffordshire | Southbound | Heavy traffic | Clear   ...   M25 Essex | Clockwise | Heavy traffic | Clear   ...   A27 Hampshire | Westbound | Heavy traffic   ...   A1 North Yorkshire | Southbound | Heavy traffic   ...   A38 Derbyshire | Southbound | Heavy traffic | Clear   ...   M3 Hampshire | Westbound | Heavy traffic | Clear   ...   M5 North Somerset | Northbound | Heavy traffic | Clear   ...   M25 Essex | Clockwise | 1 lane closed, fuel spill   ...   M4 Berkshire | Westbound | Heavy traffic | Clear   ...   A20 Kent | Eastbound | Multi-vehicle accident   ...   M67 Greater Manchester | Eastbound | Heavy traffic   ...   A1(M) South Yorkshire | Northbound | Accident, 1 lane closed   ...   M6 Staffordshire | Southbound | Broken down vehicle, 1 lane closed   ...   M180 South Yorkshire | Overturned vehicle, 1 lane closed   ...   
Home » Road Projects » Area 9 » Road Project
Contact us

by phone or email

Register for
email alerts

On information that's important to you

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

A3 Hindhead Improvement

The project will deliver quicker, more reliable journeys on a safer road.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

M5 Northbound Junction 2 to 1 Oldbury Interim Surfacing Scheme

M5 Northbound Junction 2 to 1 Oldbury Interim Surfacing Scheme

Status
Completed
Located in
Area 9Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency

The Project

Where

Work was undertaken on the M5 northbound carriageway between Junctions 2 - Oldbury and Junction 1 - West Bromwich.

Works are currently in 2 phases:
  • Phase 1 started on 6 March 2007 and was completed ahead of schedule on 28 March 2007
  • Phase 2 started on 9 July 2007 and was completed on 4 August 2007

What are we doing

Phase 1

We have resurfaced areas of lane 1, 2, and 3 of the northbound carriageway over a distance of approximately 3 km. We also installed new traffic movement loops and upgraded the road markings.

Phase 2

We have renewed the asphalt expansion joints where they are worn out and installed new ones where the new surface has been laid.

Why do we need to do this work

The carriageway had reached the end of its useful life and can no longer be repaired economically by patching works. These works removed the need for potholing or patching works and provides a safe surface for road users.

Traffic Management

Works were carried out using nightime lane closures for the safety of both road users and road workers. There was a single lane left open to traffic during the works with a 50mph speed limit. When we were working near the northbound entry slip road at Junction 2 it was necessary to close this slip road and traffic was diverted via Junction 3. In addition, when we was working near to Junction 1 northbound exit slip road it was necessary to close this slip road and traffic was diverted via Junction 3 and when we was working near to Junction 1 northbound exit slip road it was necessary to close the slip road and traffic was diverted via Junction 7 of the M6.