Latest
Home » Road Projects » Area 7 » Road Project
Contact us

by phone or email

Register for
email alerts

On information that's important to you

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

A3 Hindhead Improvement

The project will deliver quicker, more reliable journeys on a safer road.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

A1 Shire Bridge to Long Bennington Safety Scheme

A1 Shire Bridge to Long Bennington Safety Scheme

Status
Planned
Located in
Area 7Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency
Updates
Get email alerts when we publish new information Get email alerts when we publish new information

The Project

This is a small safety scheme on the A1, which will include the installation of new central hatching, centre lines, edge lines, road studs, warning and direction signs.  It is aimed at raising the profile of junctions, gaps and associated hazards on both the north and southbound A1 between Shire Bridge (on the Nottinghamshire border) and Long Bennington, in Lincolnshire. For further safety reasons we are also adding driver reactive chevron signs at the bend on the B6326 prior to A1 southbound sliproad.

The work will start on 22nd October 2007 until 18th November 2007. All work will be carried out overnight between 8pm and 6am during which both carriageways and sliproads at B6326 and Doddington Lane with A1 southbound and Fen Lane exit from A1 northbound will, from time to time, be closed.

Traffic Management

Please note that this information is not updated in real time. Please check Traffic England for the latest information and current traffic conditions.

There will be a 40mph speed limit from the B6236 Great North Road overbridge at Balderton to Valley lane overbridge at Long Bennington and, when required, a 10mph speed limit for convoy working from the B6326 overbridge to Valley Lane overbridge.  There will also be gap closures preventing right turn movements from the A1 northbound to the B6326 with all vehicles diverted via the northbound A1 to Balderton off sliproad.

We apologise for any delay or disruption you may experience while we carry out these essential safety works.

Please allow extra time for your journey and follow all the diversion signs where applicable.