Better information for your journey
The National Traffic Control Centre collects real-time information on road conditions.
The Project Control Framework
On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.
Traffic news on your desktop
Helpful ways to access the latest traffic information when you need it.
A40 Denham Viaduct Strengthening and Parapet Replacement
A40 Denham Viaduct Strengthening and Parapet Replacement
- Status
- Planned
- Located in
- Area 5

- Scheme type
- Other

The Project
The A40 Denham Viaduct is located between J1 of the M40 and Swakely's Roundabout to the south in Uxbridge and carries the A40 over the River Fray and surrounding floodplains.
We are proposing to replace the existing brickwork parapets to bring them up to current standards and strengthen the bridge deck from below to allow abnormal loads to use the A40 in both directions over the structure.
The existing 3 running lanes will be maintained for the duration, albeit with reduced lane widths and speed cameras will be used to enforce the 40mph mandatory speed limit through the extent of the works.
Innovative carbon fibre plate bonding techniques to strengthen the deck will be used, reducing construction waste and the duration of the works.
Strengthening of the deck will help eliminate congestion on the local diversion route currently caused by abnormal load vehicles too heavy to use this section of the A40.



