A1089 ASDA Roundabout Resurfacing Scheme
A1089 ASDA Roundabout Resurfacing Scheme
The Project
These works were carried out using a traffic signalled contra-flow system. This contra-flow system allowed the A1089 Northbound and Southbound and Thurrock Parkway traffic to obtain access onto the roundabout throughout the duration of the works.
Works started on 17 November 2008 and were completed by the end of November 2008.