Latest traffic information

Breadcrumb Navigation

You are here:

  1. »
  2. Home »
  3. Road Projects »
  4. Road Projects »
  5. Area 10 »
  6. Road Project

Website Navigation

Useful Links

Quick Links

Map Based Road Projects Finder - Feedback

We are currently piloting a new map based tool to help you find road projects. Please let us know what you think

The Project Control Framework

This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.

M53 Junctions 7 - 8 Hybrid Scheme

M53 Junctions 7 - 8 Hybrid Scheme

Status
Completed
Located in
Area 10Map of the Agency's Operational Areas
Scheme type
OtherRoad Schemes Managed by the Highways Agency

The Project

Work on the £7.5m scheme to upgrade the M53 motorway between junction 7 and junction 8 at Ellesmere Port, Cheshire was completed in December 2009. 

A new concrete step barrier has been installed in the central reservation, a new vehicle restraint system (barriers) has been installed on the verges and slip roads whilst new lighting has been installed on top of the concrete central reservation barrier.  Two railway under-bridges have been refurbished and drainage works carried out in the central reservation.  Both carriageways and the junction 8 slip roads have been completely re-surfaced.