Latest
Home » Road Projects » Area 6 » A14 Ellington to Fen Ditton » Publications
Contact us

by phone or email

Register for
email alerts

On information that's important to you

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

A3 Hindhead Improvement

The project will deliver quicker, more reliable journeys on a safer road.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

Publications

A14 Ellington to Fen Ditton

Publications

Whilst you are reading the information on this page about the project please note that the “Targeted Programme of Improvements” is now known as the “Programme of Major Schemes”.

Leaflets
Further Public Consultation, December 2006 (2.17MB PDF)
New Exhibition Dates, May 2005 (100KB PDF)
Public Consultation Leaflet, March 2005 (520KB PDF)
Preferred Route Announcement (Fen Drayton to Fen Ditton section) March 2007 (591KB PDF)
Preferred Route Announcement (Fen Drayton to Fen Ditton section) March 2007 Map
Preferred Route Announcement (Ellington to Fen Drayton section and route strategy) - October 2007 (605KB PDF) 
Preferred Route Announcement Map (Ellington to Fen Drayton section and route strategy) - October 2007
Reports available to download or on CD
A14 Ellington to Fen Ditton Commission to Preferred Route Announcement
A14 Ellington to Fen Ditton - Appraisal Summary Tables (AST) (This AST was produced for the Preferred Route Announcement for the Ellington to Fen Drayton section of the scheme made on 24 October 2007)
Stage 2 Scheme Assessment Report Part I, Volume I, Part A
Stage 2 Scheme Assessment Report Part 2, Volume I, Part A
Stage 2 Scheme Assessment Report Parts 1 & 2, Volume II (Drawings)
Reports available on CD
Stage 2 Scheme Assessment Report Part 1, Volume 1, Part B (Appendices)
Stage 2 Scheme Assessment Report Part 2, Volume 1, Part B (Appendices)
Stage 2 Scheme Assessment Report Part 1, Volume 1, Part A Addendum 2006
Stage 2 Scheme Assessment Report Part 1, Volume 1, Part B (Appendices) Addendum 2006
Stage 2 Scheme Assessment Report Part 1, Volume 2, (Drawings) Addendum 2006
Scheme Assessment Report and Recommendation Part 1 Volume 1 (Fen Drayton to Fen Ditton)
Scheme Assessment Report and Recommendation Part 1 Volume 2 Drawings (Fen Drayton to Fen Ditton)
Scheme Assessment Report and Recommendation Part I Volume I (Ellington to fen Drayton and Route Strategy)
Scheme Assessment Report and Recommendation Part I Volume II Drawings (Ellington to Fen Drayton and Route Strategy)

Please note: The above Stage 2 Scheme Assessment Report contains scheme background up to and including the original 2005 Public Consultation. The Addendum to the Stage 2 Scheme Assessment Report was produced to update the information from the original 2005 Public Consultation.

Copies of the reports on CD can be obtained on request from the Highways Agency at Woodlands, Manton Lane, Manton Industrial Estate, Bedford MK41 7LW or by emailing a14ellingtonfenditton@highways.gsi.gov.uk. Hard copies can also be made available but a charge will be made to cover the cost of printing and materials. Details of charges for the reports are available on request.

Newsletters