Better information for your journey
The National Traffic Control Centre collects real-time information on road conditions.
A3 Hindhead Improvement
The project will deliver quicker, more reliable journeys on a safer road.
Traffic news on your desktop
Helpful ways to access the latest traffic information when you need it.
- Preferred Route Announcement Map for Ellington to Fen Drayton - October 2007
- A14 Ellington to Fen Ditton - Appraisal Summary Tables
- Stage 2 scheme assessment report parts 1 & 2, volume ii (drawings)
- Stage 2 scheme assessment report part 2, volume i, part a
- Stage 2 Scheme Assessment Report - Part 1, Volume 1, Part A
Publications
A14 Ellington to Fen Ditton
Publications
Whilst you are reading the information on this page about the project please note that the “Targeted Programme of Improvements” is now known as the “Programme of Major Schemes”.
- Leaflets
- Further Public Consultation, December 2006 (2.17MB PDF)
- New Exhibition Dates, May 2005 (100KB PDF)
- Public Consultation Leaflet, March 2005 (520KB PDF)
- Preferred Route Announcement (Fen Drayton to Fen Ditton section) March 2007 (591KB PDF)
- Preferred Route Announcement (Fen Drayton to Fen Ditton section) March 2007 Map
- Preferred Route Announcement (Ellington to Fen Drayton section and route strategy) - October 2007 (605KB PDF)
- Preferred Route Announcement Map (Ellington to Fen Drayton section and route strategy) - October 2007
- New Exhibition Dates, May 2005 (100KB PDF)
- Reports available to download or on CD
- A14 Ellington to Fen Ditton Commission to Preferred Route Announcement
- A14 Ellington to Fen Ditton - Appraisal Summary Tables (AST) (This AST was produced for the Preferred Route Announcement for the Ellington to Fen Drayton section of the scheme made on 24 October 2007)
- Stage 2 Scheme Assessment Report Part I, Volume I, Part A
- Stage 2 Scheme Assessment Report Part 2, Volume I, Part A
- Stage 2 Scheme Assessment Report Parts 1 & 2, Volume II (Drawings)
- A14 Ellington to Fen Ditton - Appraisal Summary Tables (AST) (This AST was produced for the Preferred Route Announcement for the Ellington to Fen Drayton section of the scheme made on 24 October 2007)
- Reports available on CD
- Stage 2 Scheme Assessment Report Part 1, Volume 1, Part B (Appendices)
- Stage 2 Scheme Assessment Report Part 2, Volume 1, Part B (Appendices)
- Stage 2 Scheme Assessment Report Part 1, Volume 1, Part A Addendum 2006
- Stage 2 Scheme Assessment Report Part 1, Volume 1, Part B (Appendices) Addendum 2006
- Stage 2 Scheme Assessment Report Part 1, Volume 2, (Drawings) Addendum 2006
- Scheme Assessment Report and Recommendation Part 1 Volume 1 (Fen Drayton to Fen Ditton)
- Scheme Assessment Report and Recommendation Part 1 Volume 2 Drawings (Fen Drayton to Fen Ditton)
- Scheme Assessment Report and Recommendation Part I Volume I (Ellington to fen Drayton and Route Strategy)
- Scheme Assessment Report and Recommendation Part I Volume II Drawings (Ellington to Fen Drayton and Route Strategy)
- Stage 2 Scheme Assessment Report Part 2, Volume 1, Part B (Appendices)
Please note: The above Stage 2 Scheme Assessment Report contains scheme background up to and including the original 2005 Public Consultation. The Addendum to the Stage 2 Scheme Assessment Report was produced to update the information from the original 2005 Public Consultation.
Copies of the reports on CD can be obtained on request from the Highways Agency at Woodlands, Manton Lane, Manton Industrial Estate, Bedford MK41 7LW or by emailing a14ellingtonfenditton@highways.gsi.gov.uk. Hard copies can also be made available but a charge will be made to cover the cost of printing and materials. Details of charges for the reports are available on request.


