Latest
A628 Derbyshire | Westbound | Heavy traffic   ...   M621 West Yorkshire | Eastbound | Heavy traffic   ...   M62 Greater Manchester | Westbound | Heavy traffic | Clear   ...   M621 West Yorkshire | Westbound | Heavy traffic | Clear   ...   M4 South Gloucestershire | Eastbound | Accident   ...   M4 South Gloucestershire | Westbound | Accident | Clear   ...   M25 Hertfordshire | Anticlockwise | Heavy traffic | Clear   ...   M20 Kent | Eastbound | Heavy traffic | Clear   ...   A38 Devon | Southbound | Accident   ...   A34 Hampshire | Northbound | Accident, 1 lane closed   ...   A34 Hampshire | Southbound | Accident, 1 lane closed   ...   M60 Greater Manchester | Anticlockwise | Heavy traffic   ...   A663 Greater Manchester | Southbound | Heavy traffic   ...   M25 Hertfordshire | Anticlockwise | Heavy traffic | Clear   ...   M1 Leicestershire | Southbound | Vehicle recovery   ...   M25 Hertfordshire | Clockwise | Heavy traffic | Clear   ...   M25 Kent | Anticlockwise | Vehicle recovery   ...   M20 Kent | Eastbound | Accident | Clear   ...   M6 West Midlands | Southbound | Accident | Clear   ...   A1 Gateshead | Northbound | Heavy traffic   ...   A47 Cambridgeshire | Eastbound | Heavy traffic   ...   A12 London | Northbound | Heavy traffic   ...   A590 Cumbria | Westbound | Heavy traffic   ...   M25 Kent | Anticlockwise | Heavy traffic   ...   
Home » Road Projects » Area 9 » M42 Jct 3a - Jct 7 Active Traffic Management » About the scheme » About the scheme
Contact us

by phone or email

Register for
email alerts

On information that's important to you

Feature

Better information for your journey

The National Traffic Control Centre collects real-time information on road conditions.

Quick Links

The Project Control Framework

On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.

Traffic news on your desktop

Helpful ways to access the latest traffic information when you need it.

About the scheme

M42 Jct 3a - Jct 7 Active Traffic Management

How does it work?

The main purpose of Active Traffic Management is to manage congestion, but it can also be used to manage the traffic around an incident, should one occur.

When this stretch of the M42 is not congested and there are no incidents, all normal motorway rules apply.

Normal Motorway Conditions:
Normal Motorway Conditions

  • No congestion or incident
  • No speed limits shown on signals
  • National speed limits apply
  • Hard shoulder only for emergency and break down use
  • Use emergency refuge areas in an emergency or break down for added safety

If there is congestion or an incident, Active Traffic Management will manage the traffic to ease congestion:

Active Traffic Management without hard shoulder running:
Active Traffic Management without hard shoulder running

  • Incident or congestion ahead
  • Speed limit signals are set and must be obeyed
  • Driver information signs provide necessary information for road users
  • Red cross over hard shoulder means do not use this lane, except in an emergency or break down
  • Use emergency refuge areas in an emergency or break down for added safety

Controlling the traffic across all lanes, with the right speed for the traffic conditions, enables the traffic to flow more smoothly. This reduces constant stopping and starting, which therefore helps to prevent the break down of traffic flow. This will help to reduce congestion.

The system sets the same speed across the carriageway, which reduces the need for drivers to change lanes.

When necessary, the system also sets messages on the driver information signs to inform road users of the road conditions ahead of them. This helps to protect queuing traffic because drivers are aware of slow moving or stationary traffic ahead.

In the case of severe congestion or an incident in one of the normal running lanes the hard shoulder may be opened to traffic under controlled conditions:

Active Traffic Management with hard shoulder running:
Active Traffic Management with hard shoulder running

  • Incident or congestion ahead
  • Speed limit signals will be set and must be obeyed
  • Driver information signs provide necessary information for road users
  • Hard shoulder used as a running lane between junctions
  • Do not stop on the hard shoulder
  • Use emergency refuge areas in an emergency or break down for added safety

The control centre can open the hard shoulder, as an extra running lane to reduce the impact of congestion by providing extra space for the traffic. The hard shoulder is opened under controlled conditions, once the Regional Control Centre operator has checked that the hard shoulder is clear of debris and vehicles.

The hard shoulder will only be open to vehicles between junctions and only between junctions that have a high volume of vehicles.