Disabled Driver Questionnaire
We want to produce a driver information programme for our disabled customers. To help us produce the best possible guidance, please take a few minutes to fill in our questionnaire.
Better information for your journey
The National Traffic Control Centre collects real-time information on road conditions.
A3 Hindhead Improvement
The project will deliver quicker, more reliable journeys on a safer road.
Traffic news on your desktop
Helpful ways to access the latest traffic information when you need it.
M40 Junction 15 Improvement Scheme
- Status
- Completed
- Located in
- Area 11

- Scheme type
- Other

The Project
The M40 junction 15 in Warwickshire is a busy interchange between the M40, A46 and the A429. The works, now completed, consisted of replacing the carriageway around the roundabout and on the northbound off and southbound on slips of the motorway. These slip roads were also widened to smooth the flow of traffic. The northern half of the circulatory roundabout was widened as was the A46 approach from Coventry. Finally an improved traffic signal system with new signing was installed.
Post Opening Project Evaluation
As part of our ongoing programme of Post Opening Project Evaluation (POPE) a study has been undertaken comparing the outturn effects of this scheme to the predicted impacts. A summary of the report is available to download below. If you require a full version of the report, please contact us.


