Latest traffic information

Breadcrumb Navigation

You are here:

  1. »
  2. Home »
  3. Road Projects »
  4. Road Projects »
  5. Area 9 »
  6. A45/A46 Tollbar End Improvement »
  7. Publications »
  8. Public Consultation »
  9. Public Consultation

Website Navigation

Useful Links

Quick Links

Map Based Road Projects Finder - Feedback

We are currently piloting a new map based tool to help you find road projects. Please let us know what you think

The Project Control Framework

This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.

Public Consultation

A45/A46 Tollbar End Improvement

Yellow Option. Ground Level

yellow option - View larger image

This option would involve constructing new sections of road from the B4110 London Road, around the retail park to the A46 Coventry Eastern Bypass, a new link between the A46 and A45 and to Middlemarch Business Park, and a link road from Rowley Road to London Road passing under the existing A45 Stonebridge Highway. This option requires the widening of part of the A45 Stonebridge Highway to three lanes and traffic signalisation of Stivichall interchange.

SCHEME OPTION Traffic Design / Construction Environment
YELLOW

Journey time reliability improved

All existing movements retained with some substantial diversions

Pedestrian / Cycle links maintained

Flexibility to incorporate bus priorities

Provides secondary access to Middlemarch Business Park, Coventry Airport

More junction conflict points

Traffic management relatively insubstantial throughout construction period

Diversion of public utilities services relatively insubstantial

Up to 45 metre wide strip of land between A45 London Road and A46 Coventry Eastern Bypass, and between A45 London Road and Siskin Drive would be required

Up to 15 metre strip of land between B4110 London Road and A46 Coventry Eastern Bypass, and between B4110 London Road and Siskin Drive would be required

Relatively high land take

Requires commercial property demolition

NoiseOverall improvement achieved with around 30 less people annoyed by road traffic noise with scheme than without the scheme
Air QualitySignificant improvement at around 100 properties with a significant worsening at 320 properties. Although the number of pollutant weighted properties reduced, the improvement is not as great as Green or Purple Options
Greenhouse GasesGenerates highest increase in greenhouse gas emissions due to new link roads
LandscapeSlight negative impact and moderate negative visual impact on properties north of Tollbar
AmbienceReduced stress for some road users by avoiding Tollbar roundabout, but offset by new link road junctions. Link road will provide countryside views. Overall medium impact
TownscapeFeatures are typical and not particularly valued. Neutral in impact
BiodiversitySlight negative impact on conservation sites including Stonebridge Meadows, River Stowe, Coventry Nature Conservation Site and Warwickshire Ecosite. Potential intermediate negative impact on protected species, but could be minimised by mitigation
HeritageImpact on remains of Ryton Bridge, a listed building
WaterCould affect the Rivers Avon, Sowe and Sherbourne - risk of pollution and impact on the floodplain
Physical FitnessAdditional scope for provision for pedestrian / cyclists at junctions. Overall impact slight improvement