On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.
Traffic news on your desktop
Helpful ways to access the latest traffic information when you need it.
Disconnected Pages
Frequently Asked Questions
00000
M3 Junction 3 to 4 Major Maintenance Scheme Drainage Replacement
Frequently Asked Questions
Traffic Management will consist of the following:
- Isolated & overnight lane closures on the M3 from 5 September to 26 September 2005
- Full contra-flow from 26 September to 16 December 2005
- No slip road closures are planned for these works
- No daytime reduction in number of lanes are planned (usual three lanes in each direction to be maintained)
- There will be a 50 mph speed limit with Safety Cameras operated by Surrey Camera Partnership
- There will be a physical barrier separating opposing traffic
- Vehicle recovery service is 24 hours per day from 26th Sept until completion
- HGV to straddle lane 1 and 2
What is being carried out
- Essential drainage reconstruction and upgrade
- Resurfacing of the eastbound hardshoulder where damaged by works
- Renewal of road markings and studs
- Vegetation/ tree clearance locally to allow safety operation of machines
- Vegetation clearance on westbound carriageway to allow hardshoulder to be used as running lane
Why is this work being carried out
- To prevent further subsidence of the verge and hardshoulder
- To avoid localised flooding
- To improve safety on the highway network
Where
- Works are only being carried out on the Eastbound verge
- Traffic management from 1 mile south of J4 to the Maultway Bridge (between J3 and J4)
- Works will take place between Watchetts Pond and the Maultway
- Noise levels have been agreed with Surrey Heath Council
Who
- Highways Agency (Client)
- Mott MacDonald (Supervision)
- Edmund Nuttall Ltd (Contractor)
Value
- £4.0 million