Feature
Better information for your journey
The National Traffic Control Centre collects real-time information on road conditions.
Quick Links
How We Manage Our Roads
In this section you can find out more about how we manage and maintain these roads and plan for the future
The Project Control Framework
On 1st April 2008 we launched the Project Control Framework. The Framework sets out how we, together with the Department for Transport, manage and deliver major improvement projects.
Traffic news on your desktop
Helpful ways to access the latest traffic information when you need it.
A419 COMMONHEAD JUNCTION IMPROVEMENT
4. DESCRIPTION OF SCHEME OPTIONS
4.1 Three options to solve the problems at Commonhead junction have been considered as follows:
- Option A - 'Overpass'
- Option B - 'Underpass'
- Option C - At-grade throughabout
4.2 Option A (Overpass) would add a second level above the existing Commonhead junction for A419 through traffic. The removal of the through traffic would reducecongestion at the roundabout.
4.3 Option B (Underpass) would provide a similar reduction in congestion as Option A (Overpass) but would pass under the existing Commonhead junction.
4.4 Option C (throughabout) would provide a new traffic signal controlled layout at the same level as the existing Commonhead roundabout. This option however would not provide a long term solution to congestion and would provide congestion relief for around only 6 years.
Cost Estimates
4.5 The construction cost estimate for each option is as follows:
| Option A | Option B | Option C |
|---|---|---|
| 10.5 | 16.5 | 5.0 |
Note: These estimates are based on (£ million) 2001/Q1 values.