Latest traffic information

Breadcrumb Navigation

You are here:

  1. »
  2. Home »
  3. Road Projects »
  4. Road Projects »
  5. Area 6 »
  6. A14 Ellington to Fen Ditton »
  7. Publications »
  8. Stage 2 Scheme Assessment Report - Part 1, Volume 1, Part A »
  9. Stage 2 Scheme Assessment Report - Part 1, Volume 1, Part A

Website Navigation

Useful Links

Quick Links

Map Based Road Projects Finder - Feedback

We are currently piloting a new map based tool to help you find road projects. Please let us know what you think

The Project Control Framework

This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.

Stage 2 Scheme Assessment Report - Part 1, Volume 1, Part A

5. Environmental Assessment - 1

5.1 Introduction

An environmental assessment has been undertaken of the route options beingconsidered for the improvement of the existing A14 from Ellington to Fen Ditton.The aim being to:

identify the environmental advantages, disadvantages and constraints associated with each of these route options; andallow the public and statutory environmental bodies to comment on their implications.lead to the selection of a preferred scheme.