Latest traffic information

Breadcrumb Navigation

You are here:

  1. »
  2. Home »
  3. Road Projects »
  4. Road Projects »
  5. Area 6 »
  6. A11 Fiveways to Thetford Improvement »
  7. Publications »
  8. A11 fiveways to thetford improvement »
  9. A11 fiveways to thetford improvement

Website Navigation

Useful Links

Quick Links

Map Based Road Projects Finder - Feedback

We are currently piloting a new map based tool to help you find road projects. Please let us know what you think

The Project Control Framework

This framework sets out how we, together with the Department for Transport, manage and deliver major road improvement projects.

A11 fiveways to thetford improvement

Rejected options

Three other alignment variations have been considered and have already been rejected.

An option which followed the line of the existing road through Mildenhall Woods was considered but rejected because a dual carriageway on this alignment would require an 8 metre deep cutting over the crest of the hill.

A longer bypass of Elveden that extended further to the west was considered but rejected as it required more agricultural land, severed more agricultural fields and provided no significant benefits over the proposed option.

A shorter bypass of Elveden, which rejoined the existing A11 at the Redneck Farm entrance, was considered but rejected as it moved trunk road traffic nearer to residential property than does the proposed option.