M6 Junction 4 to 3 Southbound Resurfacing

This scheme is for a targeted pavement renewal works.

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

A303 Eastbound and Hayes End Roundabout Resurfacing.

Resurfacing of the A303 eastbound and Hayes End roundabout, South Petherton.

Project Status:PlannedRegion: South WestType:Maintenance Scheme

M5 J14 to J15 southbound Itchington Geotechnical Scheme

Geotechnical slope stabilisation

Project Status:PlannedRegion: South WestType:Maintenance Scheme

M25 Junctions 23 to 27 Resurfacing

We are resurfacing the second and third lanes on both carriageways between junctions 23 and 24 and between junctions 25 and 27.

Project Status:CurrentRegion: London and South EastType:Improvement Scheme

M54 Junction 3 to 5 Westbound Resurfacing

We are replacing existing drainage, safety fencing and resurfacing the westbound carriageway with a material that will reduce tyre noise and spray when wet

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

M6 southbound Junction 10 to 8 Resurfacing and Bridge Expansion Joint Renewals

We will be carrying out resurfacing and bridge expansion joint renewals works.

Project Status:CurrentRegion: MidlandsType:Maintenance Scheme

A64 Carriageway Resurfacing Works between Barton Hill and Seamer

We plan to resurface the A64 carriageway between Barton Hill and Seamer

Project Status:PlannedRegion: North East and YorkshireType:Improvement Scheme

M1 Junctions 19 to 16: All Lane Running

Conversion of the hard shoulder into a running lane on a stretch of the M1 junction 19-16.

Project Status:PlannedRegion: MidlandsType:Major Scheme

A34 Didcot Drainage Maintenance

Essential maintenance to drainage works between Milton and Chilton

Project Status:PlannedRegion: London and South EastType:Maintenance Scheme

A5 Footway Renewal Schemes

Renewal of the footway re-surfacing on the A5 Eastbound and Westbound carriageway between the A5/A4601 Longford Island and A5/A34/A60 Lodge Lane island.

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

A38 Barton Service Road Resurfacing

We are carrying out works to the footway adjacent to the service road to improve the footways surface as if left untreated further deterioration will occur

Project Status:CurrentRegion: MidlandsType:Maintenance Scheme

M6 Farleton Interchange

Joint replacement, resurfacing and drainage works will be carried out at the M6 Junction 36

Project Status:PlannedRegion: North WestType:Maintenance Scheme

A1 Duns Road to Highfields Resurfacing

Resurfacing of the southbound and northbound carriageways

Project Status:CurrentRegion: North East and YorkshireType:Maintenance Scheme

M50 Junction 1 Embankment Improvement

We will be carrying out earthworks to the embankment, installing a new safety barrier, installing kerb drainage units, new carrier and filter drain.

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

A12 J31 - J33 northbound & southbound improvement works

carriageway resurfacing, footway resurfacing, renewal of road signs and sign lighting.Upgrade of safety barriers, drainage renewal and jetting.

Project Status:PlannedRegion: EastType:Improvement Scheme

A12 J11 - J12 northbound and southbound improvement works

Renewal of 15 road signs, 34 sign lighting upgrades. Upgrade of safety barriers. Drainage renewal,jetting and resurfacing of carriageways.

Project Status:PlannedRegion: EastType:Improvement Scheme

A590 Elliscales to Dalton

The over-run areas in the lay-bys between Askham roundabout and Dalton roundabout are to be reinstated.

Project Status:CurrentRegion: North WestType:Maintenance Scheme

A585 Beech Grove to M65 Junction 3

The A585 will be resurfaced between the M65 junction 3 and Beech Grove

Project Status:CurrentRegion: North WestType:Maintenance Scheme

A14 J26- J29 eastbound resurfacing

Carriageway resurfacing(patching) works in lane 1 and 2 of the eastbound carriageway. Road markings and road studs will also be renewed.

Project Status:PlannedRegion: EastType:Maintenance Scheme

A590 Newby Bridge to Backbarrow Westbound

The A590 carriageway will be resurfaced Newby Bridge and Backbarrow

Project Status:CurrentRegion: North WestType:Maintenance Scheme

A421 Bedford southern bypass resurfacing works

Resurfacing layby, footway and carriageways. Renwal of road markings and studs. Repairs to damaged drainage systems

Project Status:CurrentRegion: EastType:Maintenance Scheme

A590 Levens to Hincaster Drainage

The drain will be replaced on the central reserve between Levens and Hincaster

Project Status:CurrentRegion: North WestType:Maintenance Scheme

M25 Junction 5 - 6 Resurfacing

Resurfacing of the 2nd and 3rd lanes of the M25, clockwise and anti-clockwise between junctions 5 and 7.

Project Status:CurrentRegion: London and South EastType:Improvement Scheme

A46 Southbound Wanlip Interchange Entry Slip SCRIM

We are carrying out works to resurface the existing A46 Southbound Entry Slip roads to improve ride quality, improve the skid resistance & reduce noise.

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

M1 Old Park Charity Toddington Parapet

We are carrying out parpapet replacements on three M1 bridges.

Project Status:PlannedRegion: EastType:Maintenance Scheme

A46 Brownhills Roundabout and A1 Slip Safety

This scheme is to increase driver safety on the A1 Northbound Exit Slip near Newark. Works comprise the installation of new High Visibility Chevron signs.

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

A52 Westbound Easthorpe Retexturing (SCRIM)

We are carrying out works to retexture and improve the condition of the westbound carriageway between Grantham Road and Castle View Road, renewing markings

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

M5 Junction 9 to 8 Northbound Road Surface Improvement

The works are being carried out to improve the road surface.

Project Status:CurrentRegion: MidlandsType:Maintenance Scheme

M5 J21-22 Concrete Vehicle Restraint System

Replacing sections of existing central reservation with concrete and steel sections.

Project Status:PlannedRegion: South WestType:Maintenance Scheme

A46 Cattle Market to Brownhills Roundabout Safety

This scheme is to increase driver awareness and discourage dangerous manoeuvres on the A46 carriageway near Newark. Works involve two new warning signs.

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

A5 Old Stratford Roundabout Resurfacing

Resurfacing part of the roundabout, due to excessive wear.

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

A46 Southbound Broughton Lodge Slips SCRIM

We are carrying out works to resurface the existing A46 SB Exit/Entry Slip roads to improve ride quality, improve the skid resistance & reduce noise.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A46 Southbound Sixhills Entry Slip Kerbing and SCRIM

We are carrying out works to resurface the existing A46 Southbound Exit/Entry Slip road to improve ride quality, improve the skid resistance & reduce noise

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A46 Northbound Broughton Lodge Slips SCRIM

We are carrying out works to resurface the existing A46 NB Exit/Entry Slip roads to improve ride quality, improve the skid resistance & reduce noise.

Project Status:CurrentRegion: MidlandsType:Maintenance Scheme

M1 Northbound Rothersthorpe Services Roundabout Kerbs

Resurfacing of the circulatory outside Rothersthorpe Service Station on the M1 Northbound exit slip Junction 15a also with the replacement of kerbs.

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

A27 Worthing Phase 2 Lighting Scheme

Replacement of 36 street lighting columns, lanterns and bollards

Project Status:PlannedRegion: London and South EastType:Maintenance Scheme

A3 Hindhead Tunnel Maintenance Closures

Dates for planned closure of the A3 Hindhead tunnel for various maintenance reasons

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

A14 J24 Layby Renewal

We will be carrying out works to improve the layby at junction 24 on the A14 eastbound near Godmanchester.

Project Status:CurrentRegion: EastType:Maintenance Scheme

A30 Innis downs to Carminow Drianage Scheme

A30 Innis downs to Carminow Drianage Scheme

Project Status:PlannedRegion: South WestType:Maintenance Scheme

A36 Upton Lovell Safety Improvements.

Works to improve safety on the A36 Upton Lovell at the Manor Road Junction.

Project Status:CurrentRegion: South WestType:Maintenance Scheme

A38 Dobwalls Safety Scheme

Works on the A38 Dobwalls Bypass started on 22 September 2014 and will continue until May 2015 in order to reduce the build-up of water and ice.

Project Status:CurrentRegion: South WestType:Major Scheme

A14 J23 - 24 Crack Sealing

We are carrying out works to repair the road surface on the A14 between junctions 23 (Huntingdon) and 24 (Godmanchester) eastbound and westbound.

Project Status:CompletedRegion: EastType:Maintenance Scheme

A14 WB Brampton to Ellington Ditches

Works are being carried out to improve the drainage along the A14 between junction 21 and 21 westbound.

Project Status:CurrentRegion: EastType:Maintenance Scheme

A303 Wincanton Dual, Phase Two Resurfacing

Resurfacing scheme on the A303 between Sparkford and Wincanton.

Project Status:PlannedRegion: South WestType:Maintenance Scheme

A14 Junctions 31 - 26 Westbound Resurfacing

We will be resurfacing the westbound carriageway of the A14 between A1307 and junctions 26 (St Ives) and 31(Girton).

Project Status:CurrentRegion: EastType:Maintenance Scheme

M6 Junction 3 to 2 southbound Road Markings

Renewal of all existing road markings and road studs on all 3 lanes of southbound carriageway.

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

A49 Bromfield to Onibury Surface Renewal and Improvement works

We are carrying out works to undertake carriageway and footway resurfacing and improvements, signage installation and modification and replacement of VRS.

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

A66 Skirsgill to Kemplay Resurfacing Works

The eastbound carriageway of the A66 is to be resurfaced between the junction with the M6 and Kemplay roundabout

Project Status:CompletedRegion: North WestType:Maintenance Scheme

M27 River Blackwater Re-waterproofing

M27 River Blackwater Re-waterproofing

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

M6 Junction 2 to 3 Northbound Safety Improvement Scheme

Safety improvement works on the M6 northbound between junction 2 and 3.

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

A49 Leominster Bypass Resurfacing

We are carrying out works to improve the surface of the A49 Leominister Bypass.

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

A1 Stannington Vale Resurfacing

Resurfacing of the northbound carriageway

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

Glynn Valley Maintenance Scheme

Routine closure and maintenance in the Glynn Valley

Project Status:CurrentRegion: South WestType:Maintenance Scheme

A64 Rillington fields to Rillington carriageway renewal scheme

We plan to resurface the A64 carriageway between Rillington field and Collinson lane Rillington

Project Status:PlannedRegion: North East and YorkshireType:Improvement Scheme

A2 Boughton - Harbledown reconstruction work

A2 Brenley Corner to Harbledown carriageway reconstruction

Project Status:PlannedRegion: London and South EastType:Maintenance Scheme

A49/B4361 Onibury to Bromfield Resurfacing

Surface Renewal and Improvement Works.

Project Status:CurrentRegion: MidlandsType:Maintenance Scheme

A66 Preston Farm to Elton

The resurfacing of the A66 west bound carriageway from Preston Farm to Elton junctions.

Project Status:CurrentRegion: North East and YorkshireType:Maintenance Scheme

A66(M) East Bound Resurfacing.

Resurfacing of east bound carriageway from junction 57 A1(M) to Blackwell roundabout.

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

A1 Northbound and Southbound Resurfacing

The works consists of 50mm depth pavement inlays and the renewal of affected road markings and road studs.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M50 Horse Bridge Concrete Repairs and Cathodic Protection

We are carrying out concrete repairs to the bridge supports and re-waterproofing above the structure to save further water ingress.

Project Status:CurrentRegion: MidlandsType:Maintenance Scheme

A1 Washington to Blind Lane

Resurfacing of deteriorated sections of surface on the A1.

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

M4 Swindon Junction 16 Geotechnical Scheme.

Installation of embankment drainage and assosiated barrier work on the M4 junction 16, Swindon

Project Status:CurrentRegion: South WestType:Maintenance Scheme

M23 Coopers Hill Viaduct Works

Joint replacement works will be carried ou on the M23 Coopers Hill Viaduct in Sussex

Project Status:PlannedRegion: London and South EastType:Maintenance Scheme

A66 Kirkby Thore to Long Marston Drainage

The drainage will be replaced on the A66 between Kirkby Thore and Long Marton

Project Status:CompletedRegion: North WestType:Maintenance Scheme

A1(M) Sawtry Junctions 15 - 14 Resurfacing Scheme - Southbound

Repairs and improvements to existing carriageway.

Project Status:CompletedRegion: EastType:Maintenance Scheme

A303 Wincanton to Snag Farm Resurfacing

Resurfacing scheme on the A303 near Wincanton to Leigh.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A1 Haggerston to Broomhill

Resurfacing of the northbound and southbound carriageways

Project Status:CurrentRegion: North East and YorkshireType:Maintenance Scheme

A38 Merafield Bridge replacement

We need to replace the bridge as it is suffering from concrete decay

Project Status:CurrentRegion: South WestType:Maintenance Scheme

M62 & A63 Category Management Works

We plan to resurface the M62 and A63 along large sections of the road between Goole and Hull

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

A66 Appleby Bypass Westbound Surfacing Works

The westbound carriageway of the A66 will be replaced near Appleby

Project Status:CompletedRegion: North WestType:Maintenance Scheme

M56 Stoak Interchange

We are renewing the waterproofing and resurfacing three bridges at the Stoak Interchange.

Project Status:CurrentRegion: North WestType:Maintenance Scheme

East Ord to Scremerston Resurfacing.

Resurfacing approximately 3.3Km of the A1 near Berwick.

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

A20 through Dover Resurfacing Scheme

A resurfacing scheme will be carried out on the A20 through Dover to replace the areas of worn out surfacing

Project Status:PlannedRegion: London and South EastType:Maintenance Scheme

M60 Wardley Hall Bridge

Repair works are being carried out on Wardley Hall Bridge which carries the M60 over the A580.

Project Status:CurrentRegion: North WestType:Maintenance Scheme

A2 Bean & Ebbsfleet Junction Improvements

The proposed junction improvements form part of the Kent Thameside Strategic Transport Programme (STP)

Project Status:PlannedRegion: London and South EastType:Major Scheme

A1 Newton on the Moor NB Kerbing

Kerbing of the nearside edge of carriageway

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

A1M Preston Lane Bridge Repair Schemes

Painting bridge beams and parapets, concrete repairs, joint replacement, waterproofing and resurfacing of the bridge deck.

Project Status:CurrentRegion: North East and YorkshireType:Maintenance Scheme

A64 carriageway resurfacing works between the A1(M) Bramham and Malton

We plan to resurface the A64 carriageway between A1(M) Bramham and Malton

Project Status:PlannedRegion: North East and YorkshireType:Improvement Scheme

A38 Dry Bridge Replacement

Works to replace Dry Bridge, which crosses over the A38 Devon Expressway near the village of Rattery.

Project Status:CurrentRegion: South WestType:Maintenance Scheme

A1M Bowburn Interchange

Improvements to carriageway width, lining, signing and signal timings.

Project Status:CompletedRegion: North East and YorkshireType:Improvement Scheme

M61 to A580 Slip Road Improvement

The M61/A580 merge will be signalised to provide bus priority through the junction

Project Status:PlannedRegion: North WestType:Improvement Scheme

M180 Major Works

We are resurfacing the M180 from its junction with the M18 near Doncaster all the way through to junction 4 near Scunthorpe.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

A1M Ricknall Lane Bridge Repair Schemes

Works to maintain and repair the A1M Ricknall Lane bridge.

Project Status:CurrentRegion: North East and YorkshireType:Maintenance Scheme

M1 Junction 19-16 Central Reserve Barrier Renewal Works

Construction of a central reserve rigid concrete barrier on the M1between junctions 19 and 16 to replace the existing steel barrier.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

A21 Hurst Green, Kent Street and Baldslow Resurfacing

Resurfacing of the A21 in three locations.

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

A303 Andover to Bullington Resurfacing

Resurfacing sections of the A303 east and westbound carriageways between Bullington (exit for the A34) and Andover in Hampshire.

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

M42 Junction 9 to 10 Northbound Resurfacing and Radio Detection and Ranging works

Resurfacing a section of the M42 carriageway between junction 9 and 10 northbound and replacing traffic loops.

Project Status:CurrentRegion: MidlandsType:Maintenance Scheme

M42 Junction 6 Entry Slip Resurfacing

This scheme proposes to resurface the M42 junction 6 southbound entry slip road.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M42 Junctions 5 to 6 North and Southbound Improvement

Resurfacing of the carriageway to improve the ride quality and safety for the travelling public.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A1 Coalhouse Interchange

Works to install signals at two approaches along with local widening to increase capacity.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M5 Huntworth Viaduct Joint Replacement and Waterproofing.

Joint replacement and rewaterproofing of the Huntworth Viaduct.

Project Status:CurrentRegion: South WestType:Maintenance Scheme

M1 Junction 21 to 22 Northbound Resurfacing

We are carrying out resurfacing and associated white lining, studs renewal works to the carriageway between junctions 22 to 23 of the M1.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A1 North Lining Renewal

Works to refresh and renew road markings and studs on the A1 in Northumberland

Project Status:CurrentRegion: North East and YorkshireType:Maintenance Scheme

A21 Medway Viaduct concrete repairs and bearing replacement

Works to replace bearings and concrete repairs at Medway Viaduct.

Project Status:PlannedRegion: London and South EastType:Maintenance Scheme

M1 Grange Park Beam Painting

We will be repainting the bridge beams at M1 Junction 15, Grange Park, Northampton.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M5 Junction 5 Underbridge Alteration

Alterations to the height of bearings at the south abutment of the M5 junction 5 underbridge.

Project Status:PlannedRegion: MidlandsType:Maintenance Scheme

A66 Neasham Road to Morton Palms

Resurfacing of the A66 Neasham Road to Morton Palms.

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

A1 Lobley Hill to Metrocentre Resurfacing

Resurfacing of the northbound A1 mainline carriageway

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

A21 Kent

Resurfacing at 2 locations near Pembury and Flimwell

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

M5 Junction 1 and 2 Signage

Works to replace 3 signs and install new low voltage LED lamps on 2 new sign faces.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

Stokenchurch Overbridge Refurbishment

Extensive concrete repairs to the central reserve pier and abutments, re-waterproofing, replacement of the bridge bearings and the movement joints.

Project Status:CompletedRegion: EastType:Maintenance Scheme

M5 Junction 27 to 28 Willand Resurfacing

Works to resurface the M5 junction 27 to 28.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A47 Kings Lynn Bypass Rewaterproofing & Resurfacing

Resurfacing & rewaterproofing work between A47/A17 Pullover Roundabout and A47/A10/A149 Hardwick Roundabout.

Project Status:CompletedRegion: EastType:Maintenance Scheme

M5 Exe and Exminster Parapet

Work to replace the existing viaduct parapets.

Project Status:CurrentRegion: South WestType:Maintenance Scheme

M4 Second Severn Crossing

Work to carry out carriageway surfacfing repairs between junctions 22 and 23

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A49 to B4361 Bromfield to Onibury Resurfacing

Resurfacing and signage works at A49 to B4361 Bromfield to Onibury.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A23 / M23 Road Resurfacing / Footway Renewal Works / Gas Replacement

Works to resurface the carriageway and undertake manhole, kerb repairs and footway repairs on the A23.

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

M4 J8/9 to 10 Resurfacing

Resurfacing of the M4 between Junction 10 to junction 8/9 of the M4.

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A1/A47 Wansford Interchange (East) Improvement

Improvements to the A1 southbound slip road and east roundabout at the A1/A47 Wansford Junction.

Project Status:PlannedRegion: EastType:Improvement Scheme

A36/A27 Junction to Canada Common/Canada Common to Ower Roundabout

Safety improvement works and resurfacing.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

M6 Junction 15 to 14 Resurfacing

Works to resurface M6 junctions 15 to 14

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M6 Junction 3 Exit and Entry Slip Resurfacing

Works to resurface M6 junction 3 slip roads.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A423 Link to Ryton Resurfacing

Works to resurface the A423 carriageway exit slip road from the A45 on the approach to and including the A45 Ryton industrial estate roundabout.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A49 Southbound Broadleys Crescent Resurfacing

Works to resurface A49 Southbound Broadleys Crescent.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M54 Junction 4 and Junction 6 Lighting Renewals

Replacement of lighting columns, cable network and new cable and duct on M54 junction 4 and junction 6.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M62 Junctions 11 to 12

Resurfacing works on the M62 between junctions 11 and 12.

Project Status:CompletedRegion: North WestType:Maintenance Scheme

A49 Stapleton to Condover Resurfacing

Works to resurface areas of the carriageway, replace road markings and reinstate traffic loops at A49 Stapleton to Condover.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A38 Glynn Valley Stabilisation

We will be renewing the edge of the trunk road at three locations in the Glynn Valley.

Project Status:PlannedRegion: South WestType:Maintenance Scheme

A40 Daff-Y-Nant Works

Works to repair a defective stream channel cutting, using a combination of vegetation clearance and pumping works at the A40 at Daff-Y-Nant.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A49 Mayberry Avenue and A49 Hinton Road Footway

Footway resurfacing and upgrading of pedestrian facilities on the A49 Mayberry Avenue and A49 Hinton Road.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M6 Junction 14 to 13 Southbound Verge

Works are required to remove debris and replace a broken filter drain on the M6 junction 14 to 13

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M5 Titford Viaduct Joint Renewals

Works to replace the bridge expansion joints on the M5 at Titford Viaduct.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M54 Westbound Concrete Slab Repair

Works to repair concrete bays and resurface along a section of the M54.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

Heysham to M6 Link

The Lancashire County Council project will improve the link from the M6 junction 34 to Heysham

Project Status:CurrentRegion: North WestType:Improvement Scheme

A259 Belle Hill Junction - Bexhill to Hastings Link Road

Link to information on Belle Hill Junction.

Project Status:CurrentRegion: London and South EastType:Improvement Scheme

M56 Junctions 8 to 9 Maintenance

The existing barrier and drainage in the central reservation will be replaced between M56 Junctions 8 and 9.

Project Status:CompletedRegion: North WestType:Maintenance Scheme

M2 Junction 5 Stockbury Roundabout Resurfacing

Resurfacing on the M2/A249 junction Stockbury roundabout.

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A449 Station Drive

Works to replace and update measurements shown on the signage at A449 Station Drive.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A36 Salisbury Roundabout Improvements

Works to ease congestion on the A36 Salisbury Roundabout.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A259 Bexhill Street Lighting Scheme

A259 street lighting replacement and resurfacing works.

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

A1 Charlton Mires Resurfacing

Resurfacing of the northbound and southbound carriageways

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

M5 Northbound Junction 8 to 7 Resurfacing

Works to resurface the carriageway and renew road markings and road studs on M5 junction 8 to 7.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A458 Winnington Green Resurfacing

The proposed footway resurfacing works for this scheme will include repairs and also installation of new edge kerbs to replace existing damaged ones.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A46 M4 Junction 18 Roundabout and Slip Road Resurfacing

Resurfacing of the A46 M4 junction 18 roundabout and slip roads.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A500 Queensway to Etruria Markings and Studs

Works to renew the existing road markings and road studs on the A500 in specific areas of the northbound and southbound carriageways.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A49 Northbound from B4361 to Ludlow Refurbishment

Works to replace the existing road markings and high friction surface.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M5 Junction 7 to 8 Road Markings and Studs Renewal

Works to replace road markings and studs along the M5 southbound carriageway.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A5 Boot Inn Footway Resurfacing

Works to resurface the northern and southern footways to the east of the Grendon roundabout and add a new drain.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A1 Morpeth Bypass

Resurfacing of the northbound carriageways

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

A500 Hanchurch Layby Closure

Permanent full closure of the westbound layby at Hanchurch, 50m prior to the M6 junction 15 roundabout.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A46 Tormarton - Dyrham Park Resurfacing

Resurfacing scheme between M4 junction 18 Tormarton-Dyrham Park to A46 Cold Ashton roundabout.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A5 Rising Sun to White Horse Repairs

Carriageway repairs to the road surface on the Westbound of A5, Watling Street and replacement of high friction surfacing.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M4 Junction 15 (Swindon) Resurfacing Scheme

Resurfacing works on the M4 beneath junction 15 (the exit to Swindon)

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A483 Morda to A5 Mile End Resurfacing

Works to resurface the A483 Morda to A5 Mile End.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M6 Walsall Canal Bridge Southbound Re-Waterproofing

This scheme is happening to remove the existing waterproofing and replace joints along with concrete repairs of delaminated sections.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A5 Gledrid Resurfacing

Work involves resurfacing of a section of the B5070 carriageway on the eastern arm of the A5 Gledrid Roundabout.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A1 Alnwick Northbound Resurfacing

Resurfacing of both northbound carriageways on A1 Alnwick.

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

A303 Bullington to Overton Resurfacing Scheme

Both carriageways of the six mile section of the A303 between the A34 (Bullington Cross) and the Overton/Micheldever Station junction will be resurfaced

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M4 Junction 11 (Reading) Resurfacing

Resurfacing works on a 2 mile section of the M4 eastbound beneath junction 11.

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A34/A33 Link Road (Winchester) Resurfacing Scheme

Works to resurface the A34/A33 Southbound link roads between M3 junction 9 Winnall roundabout and the N3047 at Kings Worth.

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A49 Callow Hill to Redhill Resurfacing

Resurfacing and drainage improvements on the A49 Callow Hill to Redhill.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A5 Nesscliffe Bypass Eastbound

Works to improve the road surface at A5 Nesscliffe Bypass.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A50 Catchems Corner Westbound Entry Slip

Works to replace existing road markings and road studs and improve surface defects on the carriageway at A50 Catchems Corner.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A483 Pant Cable replacement

Works to replace faulty cable at A483 Pant.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M5 Wigmore Viaduct to M5 Junction 1 Resurfacing

Carriageway repairs to M5 Wigmore Viaduct to M5 junction 1.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A46 Beckford Cross Hill View Cottages Resurfacing

Works to replace existing road markings and road studs and resurface at A46 Beckford Cross Hill View cottages.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M6 Southbound Junction 2 Vehicle Restraint System

Works to replace the existing Vehicle Restraint Systems near the M6 junction 2 slip road exit.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A38 Shobnall Layby

The permanent closure of the northbound layby at Shobnall approx. 50m prior to the Belvoir road footbridge.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A49 Dorrington Pedestrian Crossing Improvements

Works to improve accessibility across the A49 trunk road at Dorrington, with installation of a traffic controlled pedestrian crossing.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M6 Craddock’s Moss to Junction 16 Northbound Exit Slip

Works to resurface the M6 Craddock’s Moss to Junction 16 northbound carriageway and exit slip roads.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A38/A5127 Streethay Junction

Works to improve the northbound merge and signage on the A38 at the Streethay junction.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M5 Junctions 21 and 22 Vehicle Restraint System

Replacement of barriers on the M5 between junctions 21 and 22.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

M5 Southbound Eastern Arm Joint Renewals

Works to replace bridge expansion joints on the M5 southbound.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M6 Ansty Brinklow Bridge Joint Renewals

Works to replace the bridge expansion joints between Ansty and Brinklow on the M6 near Coventry.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A46 Warwick Bypass Resurfacing

Works to repair the current road surface at A46 Warwick Bypass.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A46 Ashton-Evesham Improvement

Work to repair surface defects within the carriageway and footway at A46 Ashton-Evesham.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A46 Lay-by Signing

Road marking, signing and footway widening works at layby and along A46.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M69 Drainage and Road Markings

Works to clear drainage and reinstate road markings and road studs on the M69.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M6 Junction 16 Southbound Entry Slip Resurfacing

Road renewal works on the M6 junction 16 southbound entry slip road.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M49 Southbound Expansion Joints

Refurbishment of the expansion joints on the M49 southbound underbridge.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

M54 Overdale Subway Lighting Upgrade

Works to upgrade the worn and damaged lighting within the Overdale subway in Telford.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A36 Cotley Hill Roundabout

Resurfacing works on the A38 Cotley Hill roundabout.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A40/A449 Ross Spur Improvement

Works to improve the current lane markings, signage and the High Friction Surface on A40/A449 Ross Spur.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A5 Westbound Lay-by footway resurfacing

Works to construct a new heavy duty replacement footway on the A5.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M5 Junctions 11a to 12 Stroud Road/Brookthorpe Bridge

Works to repair to bridge foundations on the Stroud Road/Brookthorpe Bridge.

Project Status:CurrentRegion: South WestType:Maintenance Scheme

A46 Route Safety Improvements and A46 Hartley Bends Resurfacing Scheme.

Safety improvements and resurfacing of the carriageway through A46 Hartley Bends.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A20 Roundhill Viaduct Lantern Replacement

Lighting works on A20 Roundhill Viaduct

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M6 Vehicle Restraint System Junction 15 to 16

Works to remove and replace/upgrade the existing vehicle restraint systems at 10 different site locations.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M40 Junction 12 Improvements Scheme

Works to reduce congestion on the M40 southbound diverge slip road at junction 12 and on the main carriageway

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

M5 Junction 10 Piffs Elm Foundation Replacement

We are replacing the existing foundations of the bridge.

Project Status:CurrentRegion: South WestType:Maintenance Scheme

A49 Barton Road to Edgar Street

Works to resurface the A49 between Barton Road and Edgar Street.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M6 Junction 15 to Junction 14 Improvements

Works to improve the southbound entry slip road on the M6 junctions 15 to 14.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M5 Northbound Western Arm Joint Renewals

This scheme replaced the existing bridge expansion joints which had passed there usable life.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A50 Meir Eastbound Entry Slip

Works to resurface areas of the A50 Meir eastbound entry slip road.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A66 Barras Junction to the County Boundary Eastbound Resurfacing

A 2 mile section of the A66 eastbound will be resurfaced east of Brough.

Project Status:CompletedRegion: North WestType:Maintenance Scheme

M20 Junction 6 to 7 Signing and Resurfacing Scheme

Works to resurface and signage improvements to the coastbound carriageway of the M20 between junctions 6 and 7

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

A120 Pellens Corner Average Speed Cameras/Safety Improvements

Introduction of a 50 mph speed restriction, average speed cameras, improved signing and road markings on the A120 Pellens Corner.

Project Status:CurrentRegion: EastType:Improvement Scheme

M6 Newcastle to Eccleshall Central Reserve Parapet Upgrade

Safety improvements were made to the central reserve parapets and safety barriers on the M6 Newcastle to Eccleshall.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M40 Horse Brook Drainage

Works have been completed to upgrade drainage infrastructure on the M40 Horse Brook.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A5 Major Highway Improvements

Work will include junction improvements plus a new length of dual carriageway and roundabout at the MIRA Technology Park frontage, to improve traffic flow

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

M2 Junctions 6 and 7 Resurfacing

Resurfacing works are being carried out on the M2 junctions 6 to 7 in both directions to improve the road surface and prolong the life of the carriagway

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

M5 Junctions 4a to 6

Proposal to convert the hard shoulder to a permanent running lane

Project Status:PlannedRegion: MidlandsType:Major Scheme

A21 Silverhill to Hurst Green Drainage Scheme

Drainage work on the A21 through Hurst Green and SilverHill

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A259 Guestling Drainage and Resurfacing

Drainage and resurfacing works were carried out on the A259 between Mill Lane junction and Broad Street junction

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M5 Junction 3 to Junction 2 Northbound Environmental Barrier Replacement

Works to replace the barrier and clear vegetation on the M5 junctions 3 to 2.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A38 Barton to Branston Central Reservation Gaps

Works to close all four gaps in the central reservation along an area of the A38, together with a revision of road service diverge.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M5 Staverton/Hayden Bridge Repairs

Works to repair existing foundations on the M5 Staverton/Hayden bridge.

Project Status:CurrentRegion: South WestType:Maintenance Scheme

A23 Drainage Works at Randolph's Copse

Drainage works on the A23 between Patcham Interchange and the B2117.

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

A38 Clay Mills to Toyota Improvement

Resurfacing and drainage scheme on the A38 Clay Mills to Toyota.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A1 Southoe to Buckden Safety Cameras

To improve safety on the A1 between Southoe and Buckden we introduced a 60mph speed limit with enforcement by average speed cameras

Project Status:CompletedRegion: EastType:Improvement Scheme

M20 Junctions 4 to 6 Resurfacing

Resurfacing works on the M20 coastbound carriageway between junctions 4 and 6

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

M50 Westbound Road Restraint System

Replacement of existing double sided tension corrugated safety barrier on the M50.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A21 Marley Lane to Watlington Resurfacing

Works to resurface the A21 between Marley Lane and Whatlinton

Project Status:CurrentRegion: London and South EastType:Improvement Scheme

A27 Lancing Maintenance Scheme

Works to improve the drainage, replace the street lighting and resurface sections of the A27 at Lancing.

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

M6 Junction 1 to Junction 2 Solar Studs

Works to replace the solar studs and install a thin surface course on the M6 between junctions 1 and 2.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M20 Junction 8 resurfacing work

Works to resurface junction 8 of the M20

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M6 Thelwall Viaduct

Work to replace expansion joints on the M6 Thelwall Viaduct

Project Status:CompletedRegion: North WestType:Maintenance Scheme

M6 Whittingham Lane Northbound Re-waterproofing

Works to re-waterproof and resurface the northbound carriageway on the M6 north of junction 32.

Project Status:On HoldRegion: North WestType:Maintenance Scheme

A590 Booths Roundabout to Swan Street Resurfacing

Resurfacing parts of the east and westbound A590, just east of Ulverston.

Project Status:CompletedRegion: North WestType:Maintenance Scheme

A2 Littledale Joint Replacement Scheme

Replacement of joints on the A2 near Littledale

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

M4 Junctions 10 to 11 Bridge Refurbishment

Replacing the joints, re-waterproofing and resurfacing four bridges on the M4 between junctions 10 to 11.

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

M6 Bromford Viaduct Gutter Replacement

The scheme is to replace the gutters that protect the structure from water which seeps through from the road above.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M6 Thornbridge Viaduct Gutter Replacement

Work to replace the gutters on the M6 Thornbridge Viaduct.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M6 Junctions 10 to 11 Lighting Column and Cable Repair

Works to replace existing road lighting columns and cabling on the M6 junctions 10 to 11.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M56 Thorley Lane Scheme

The existing Thorley Lane Bridge, which goes over the link road from the M56 junction 5 to Manchester Airport, will be replaced with a new bridge

Project Status:CurrentRegion: North WestType:Improvement Scheme

M54/A5 Junction 7 Drainage

Works to repair an area with a non-functioning filter drain on the M54/A5 at junction 7, near Telford.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A585 Bourne Way to Fleetwood Road roundabout

Resurfacing north and southbound carriageways of the A585 from Bourne Way to Fleetwood Road roundabout.

Project Status:CompletedRegion: North WestType:Maintenance Scheme

M55 Junction 1 to Lower Bartle

Works on lane 1 of the westbound carriageway from junction 1 to Lower Bartle Bridge on the M55

Project Status:CompletedRegion: North WestType:Maintenance Scheme

M6 Ashflats Lane Parapet Upgrade

Works to improve the M6 Ashflats Lane bridge parapet and install new safety barriers on the approach.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

M1 Junction 16 and 17 Improvement

Works to install a retaining wall and safety barrier, renew the drainage and reconstruct hard shoulder and embankment on the M1 junctions 16 to 17.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A21 Resurfacing Lamberhurst to Flimwell

We carried out resurfacing on the A21 between Forstal Farm roundabout, near Lamberhurst and Flimwell Crossing, Kent. 

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

The A20 Roundhill Tunnel Drainage Clearance and Maintenance Scheme

Work was carried out to improve the drainage system to reduce the risk of the road becoming flooded

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M5 Junctions 21 to 22 Vehicle Restraint System and Fence Installation

Essential verge barrier replacement and installation of rock catch fence on the M5 junctions 21 to 22.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A585 Anchorsholme Lane to the Victoria Road roundabout

The A585 was resurfaced between Anchorsholme Lane and Victoria Road roundabout.

Project Status:CompletedRegion: North WestType:Maintenance Scheme

A27 Falmer to Lewes Drainage

Work to improve draining on the A27 Falmer to Lewes.

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A303 Stockton Wood to Deptford Resurfacing

Works to resurface the A303 from Stockton Wood to Deptford

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A20 Courtwood

A20 Courtwood resurfacing

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A27 Worthing Maintenance

Clapham junction to Lyons Way

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

M5 Junctions 4a to 6 Barrier Renewal Works

The project will involve the removal of the existing steel central reserve barrier and will be replaced with a rigid concrete barrier.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A631T/M1 Junction 34 Tinsley and South Roundabouts Recabling Works

Cabling works at Tinsley north and south roundabouts, at both ends of Tinsley Viaduct at M1 junction 34

Project Status:CompletedRegion: North East and YorkshireType:Improvement Scheme

M3 Junction 4a to 5 Bridge Deck Joint Replacement

Works to replace the bridge deck joints and install new waterproof membranes on the two bridges between junctions 4a to 5 of the M3

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A38 Harcombe Cross Parapets

We have carried out maintenance works on the bridge which carries the A38 over the B3344

Project Status:CompletedRegion: South WestType:Maintenance Scheme

A1(M) Junction 36 Improvement Scheme

Improvements to the A1(M) J36 junction.

Project Status:CompletedRegion: North East and YorkshireType:Improvement Scheme

A61/A616 Westwood Roundabout Service Diversions

The project is to undertake Service Diversions at A61/A616 Westwood roundabout in preparation for a major junction improvement scheme.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

A64 Grimston Bar Interchange Widening

We have improved Grimston Bar Interchange

Project Status:CompletedRegion: North East and YorkshireType:Improvement Scheme

M5 Junction 11a-12 Gloucester Painswick

Repairs to the bridge deck on the M5 junction 11a to 12

Project Status:CurrentRegion: South WestType:Maintenance Scheme

A27 Polegate to Wilmington resurfacing work

The resurfacing works will be carried out to improve safety and prolong the life of the carriageway

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A2 East Scheme

We are resurfacing the A2 near Canterbury

Project Status:PlannedRegion: London and South EastType:Maintenance Scheme

A1 Biggleswade Roundabout Improvements

Improvement and reconfiguration of the A1/A6001 London Road Roundabout

Project Status:CurrentRegion: EastType:Improvement Scheme

M18 Junction 5 Improvement Works (Ings)

We improved the M18 junction 5 by creating additional running lanes on the south east section of the roundabout.

Project Status:CompletedRegion: North East and YorkshireType:Improvement Scheme

M56/M53 Interchange CCTV

We plan to provide CCTV coverage of the M56/M53 Interchange

Project Status:CurrentRegion: North WestType:Improvement Scheme

A21 Tonbridge to Pembury Resurfacing Scheme

Resurfacing works were carried out on the A21 at Burgess Farm, between Tonbridge and Pembury.

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

M20 Junction 11a to 13 Resurfacing Work

The resurfacing works will be carried out to improve safety and prolong the life of the carriageway

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

A36 Stoford and Stapleford Drainage

Essential repair to drainage defects at A36 Stoford and Stapleford

Project Status:On HoldRegion: South WestType:Maintenance Scheme

M1 Junction 10-13 Works

Following the M1 Junction 10-13 Managed Motorway Scheme, we are undertaking resurfacing, installation of CCTV and landscaping work.

Project Status:CurrentRegion: EastType:Major Scheme

A2 Guston to Lydden Resurfacing Scheme

Resurfing works will be carried out on the A2 between Guston and Lydden in Kent and a low noise surfacing wil be used.

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

M56 Junction 7 Eastbound Improvement

We are undertaking improvement work on the M56 junction 7 eastbound in order to provide additional capacity.

Project Status:CurrentRegion: North WestType:Improvement Scheme

M6 Junction 23 Roundabout Improvement

We are undertaking work to improve the flow of traffic and reduce congestion

Project Status:PlannedRegion: North WestType:Improvement Scheme

A5036 Bridge Road Sefton Improvements

We are undertaking improvement work on the A5036 in Litherland to provide additional capacity.

Project Status:CurrentRegion: North WestType:Improvement Scheme

M6 Junction 26 Eastbound Roundabout, Orrell

We are undertaking widening work at M6 junction 26 southbound exit slip to improve the flow of traffic and reduce congestion

Project Status:CurrentRegion: North WestType:Improvement Scheme

M65 Junction 5 Improvements

We are undertaking work at M65 junction 5 to improve the flow of traffic and reduce congestion.

Project Status:PlannedRegion: North WestType:Improvement Scheme

A120 Galleys Corner Roundabout Improvement

Works to widen the A120 Galleys Corner roundabout and improve signing and lining.

Project Status:CompletedRegion: EastType:Improvement Scheme

A38 Haldon Hill Slope Stabilisation

We reinforced the earth embankment alongside the westbound carriageway on the A38 trunk road at Haldon Hill near Exeter.

Project Status:CompletedRegion: South WestType:Maintenance Scheme

M60 Junction 8 to M62 Junction 20

We are working to improve the M60 by making it a smart motorway between junction 8 of the M60 and junction 20 of the M62.

Project Status:CurrentRegion: North WestType:Major Scheme

A55/A483 CCTV

We will provide CCTV coverage at the junction of A55 and A483.

Project Status:CompletedRegion: North WestType:Improvement Scheme

M20 Junction 8 to 11 CCTV Installation

We are improving the Closed Circuit Television (CCTV) coverage on the M20 between junctions 8 and 11

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

A26 Beddingham to Newhavan Resurfacing Scheme

Resurfacing works took place on sections of the A26 between Beddingham Roundabout and Newhaven

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M56 Junction 5 CCTV

We plan to provide CCTV coverage of the M56 Junction 5

Project Status:PlannedRegion: North WestType:Improvement Scheme

North West Motorway Network CCTV Enhancement

We plan to provide CCTV coverage at 6 locations on the North West Motorway Network

Project Status:PlannedRegion: North WestType:Improvement Scheme

M62 Junction 6 CCTV

We plan to provide CCTV coverage of the M62 Junction 6

Project Status:CurrentRegion: North WestType:Improvement Scheme

A284 Approach to A27 Crossbush Interchange Emergency Lane Closure

An emergency lane closure has been put in place on the A284 approach to the A27 Crossbush Interchange following a land slip on the embankment

Project Status:CompletedRegion: London and South EastType:Other

M6 Junction 27 to 28 CCTV

The project is to provide CCTV coverage of the M6 between junctions 27 and 28

Project Status:PlannedRegion: North WestType:Improvement Scheme

A12 Hughes Corner Average Speed Cameras

We will be installing average speed cameras between south of the bridge over the River Stour and northeast of the junction of the A12 with the B1070.

Project Status:PlannedRegion: EastType:Improvement Scheme

A12 Kelvedon Average Speed Cameras

We will be installing average speed cameras on the A12 between Rivenhall End and junction 24 (B1024)

Project Status:PlannedRegion: EastType:Improvement Scheme

M6 Thelwall Viaduct CCTV

The project is to provide CCTV coverage of the Thelwall Viaduct

Project Status:CurrentRegion: North WestType:Improvement Scheme

M56/M53 Driver Information Signs

We are improving information given to motorists by introducing driver information signs at the junction of M56/M53

Project Status:PlannedRegion: North WestType:Improvement Scheme

M57/M58 Driver Information Signs

We are improving information given to motorists by introducing driver information signs at the junction of M57/M58.

Project Status:PlannedRegion: North WestType:Improvement Scheme

M56 Junction 11 CCTV

The project is to provide CCTV coverage of the M56 Junction 11.

Project Status:PlannedRegion: North WestType:Improvement Scheme

M6 Junctions 16 to 19 CCTV

The project is to provide comprehensive CCTV coverage of the M6 between junctions 16 and 19.

Project Status:PlannedRegion: North WestType:Improvement Scheme

A590 Driver Information Signs

We are improving information given to motorists by introducing driver information signs on the A590 between Barrow-in-Furness and M6 Junction 36.

Project Status:PlannedRegion: North WestType:Improvement Scheme

A595 Mirehouse Road Signalisation

We are undertaking improvement work at the A595 at the Mirehouse Road junction by introducing traffic signals.

Project Status:PlannedRegion: North WestType:Improvement Scheme

A55/A483 Improvements

We are undertaking improvement work on the A55/A483 to provide additional capacity and reduce congestion

Project Status:CurrentRegion: North WestType:Improvement Scheme

A19 / A1231 Hylton Grange

A scheme will be taking place to improve the A19/A1231 Hylton Grange interchange near Sunderland, Tyne and Wear.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

A5 Hinckley Low Bridge Warning Signs

Works to install signs to warn over-height vehicles of a low Network Rail bridge.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M4 Junctions 11 to 12 Theale Railway Bridge Maintenance

We have undertaken ridge maintenance works on the Theale Railway Bridge which carries the M4 over the Western Region Railway Line

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M4 Junction 7 Bridge Maintenance

Works to repair the concrete sections of the pier beams and abutments at the M4 junction 7 bridge

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M1 Junctions 28-31 Barrier Works

Replace old steel barrier with new concrete barrier.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A5 Dodwells Roundabout Economy and Longshoots Junction Improvements

The scheme will include minor widening and signalisation of Dodwells roundabout and installation of controlled pedestrian crossing at Longshoot Junction.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

A5 Mile End Junction Improvements

This work has been designed to tackle congestion by improving capacity at the A5 Mile End junction.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

M4 Junction 10 Congestion Relief Improvement

A scheme will improve the links between the M4 and A329(M), to provide increased capacity at the junction and improve traffic flows.

Project Status:PlannedRegion: London and South EastType:Improvement Scheme

M40 Junction 4/A404 Handy Cross Roundabout SCOOT Installation

We are installing a new traffic operating system at Handy Cross roundabout to help improve the efficiency of the traffic signals

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

M6 junction 16 Improvement Scheme

The work is designed to tackle congestion at M6 junction 16

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

M56 Junction 11 Daresbury Improvements

We aim to improve the flow of the M56 Junction 11 roundabout

Project Status:CurrentRegion: North WestType:Improvement Scheme

A5 Churchbridge Cannock Island Improvements

We are carrying out work to realign the carriageway at the junction and on approach to the junction.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

M6 Junction 17 Sandbach Improvements

We aim to improve the flow of the M6 junction 17 roundabout

Project Status:CurrentRegion: North WestType:Improvement Scheme

M54 Junction 5 Forge Roundabout Improvements

Work to install new traffic signals on sections of the M54 junction 5 roundabout.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M60 Junction 24 Denton Roundabout Improvements

We are undertaking works at the M60 junction 24 to improve the capacity and reduce congestion

Project Status:CurrentRegion: North WestType:Improvement Scheme

A2 Eastcliff Viaduct Refurbishment Works, Dover

Refurbishment works were carried out on the Eastcliff Viaduct in Dover to prolong the life of the structure

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M54 Ketley Interchange Bridges and Dawley Overbridge

Works to refurbish the overbridges at Ketley Interchange M54 J6 and Dawley Overbridge.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A5 South Mancetter B4111

We have improved the A5 carriageway at Mancetter

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A14 Cambridge to Huntingdon Improvement Scheme

A major road scheme to improve the A14 between Cambridge and Huntingdon.

Project Status:PlannedRegion: EastType:Major Scheme

M6 Junction 33 Electronic Message Signs and CCTV

We are undertaking works at the M6 junction 33 to improve the provision of information to road users.

Project Status:CompletedRegion: North WestType:Improvement Scheme

M6 Junction 32 Northbound Widening

We are undertaking widening work at M6 junction 32 to improve the flow of traffic

Project Status:CurrentRegion: North WestType:Improvement Scheme

M6 Junction 6 Salford Circus Roundabout

We are carrying out works to improve the M6 Junction 6, near Birmingham. This scheme is part of the Pinch Point Programme.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A46 Ashchurch and M5 Junction Improvements

Works to improve the A46 at Ashchurch and the M5 junction 9 in Gloucestershire.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M6 Junction 35 Electronic Message Signs and CCTV

We are undertaking works at the M6 junction 35 to improve the provision of information to road users.

Project Status:CurrentRegion: North WestType:Improvement Scheme

A585 Windy Harbour Junction Improvement

We are undertaking improvement work at the A585 Windy Harbour to create extra lanes through the junction.

Project Status:CurrentRegion: North WestType:Improvement Scheme

A585 Bourne Way to West Drive Widening and Improvement

We are undertaking work to improve access to the trunk road network just south of Fleetwood.

Project Status:CurrentRegion: North WestType:Improvement Scheme

A453 Variable Message Sign Upgrade

We are installing new roadside technology on the A453

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

A14 Junction 31 to 32 Eastbound and Westbound Improvements

We are constructing an additional lane in both directions between junctions 31 and 32 of the A14 and improving the westbound slip roads at junction 31

Project Status:CurrentRegion: EastType:Improvement Scheme

M42 Junction 9 to 10 resurfacing

We resurfaced the carriageway on the M42 in both directions between junctions 9 and 10, near Tamworth in Staffordshire.

Project Status:CompletedRegion: MidlandsType:Maintenance Scheme

A1(M) Junction 6 Northbound Improvements, Welwyn

We are improving the existing northbound carriageway and slip roads at A1(M) junction 6

Project Status:PlannedRegion: EastType:Improvement Scheme

A1 Black Cat Roundabout Improvements

We will be increasing the size of the Black Cat Roundabout and installing part time traffic signals

Project Status:CurrentRegion: EastType:Improvement Scheme

M1 Junction 41 improvement

We are improving the M1 junction 41 roundabout near Wakefield.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M1 Junction 40 southbound exit improvement

We plan to improve the M1 junction 40 southbound exit near Wakefield.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M62 Junction 31 eastbound exit improvement, Normanton

We are improving the M62 at junction 31 near Normanton

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M1 Junction 33 Catcliffe interchange

We have improved the M1 junction 33 circulatory carriageway near Rotherham, South Yorkshire.

Project Status:CompletedRegion: North East and YorkshireType:Improvement Scheme

M18 interchange with M1 to Junction 3

We are improving the M18 between junction 0 (M1 interchange) and junction 3, near Sheffield and Doncaster, South Yorkshire.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M5 Junction 11-12 Southbound Gloucester Driver Information Signals (GDIS)

We plan to install additional roadside information signs on the M5 Southbound between junctions 11 and 12

Project Status:CurrentRegion: South WestType:Improvement Scheme

M18 Junctions 2 to 3 northbound improvement

We are widening the northbound carriageway of the M18 between junction 2 and junction 3 near Doncaster in South Yorkshire.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M1 Junction 44 improvement, Leeds

We are improving the M1 at junction 44 near Leeds.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M62 Junction 35 to M18 Langham Interchange

We are improving the provision of traffic technology at Langham Interchange between the M62 at junction 35 and the M18 near Goole.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M1 Junction 31 to Junction 32

Works to improve the M1 between junction 31 and junction 32 near Sheffield, South Yorkshire.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M18 Junction 5

We plan to improve the M18 junction 5 near Doncaster, South Yorkshire.

Project Status:PlannedRegion: North East and YorkshireType:Improvement Scheme

M62 Junction 30 to Junction 32

We are improving the M62 between junction 30 (Rothwell) and junction 32 (Castleford) in West Yorkshire

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M62 Junction 32 eastbound exit improvement

We are improving the M62 at junction 32 near Pontefract.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

A19 Moor Farm Roundabout

Works to widen a section of the A19 at Moor Farm roundabout.

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

M62 Junction 22 to Junction 23

We plan to improve the M62 between junction 22 and junction 23 near Huddersfield in West Yorkshire.

Project Status:PlannedRegion: North East and YorkshireType:Improvement Scheme

M62 Junction 34 to Junction 35

We plan to improve the M62 between junction 34 and junction 35 near Goole in the East Riding of Yorkshire.

Project Status:PlannedRegion: North East and YorkshireType:Improvement Scheme

M5 Junction 27 southbound widening and part time signals

To carry out works to improve M5 Junction 27

Project Status:CurrentRegion: South WestType:Improvement Scheme

A40 Over Roundabout Gloucester Westbound Approach Widening

To carry out works to improve the A40 at Over, Gloucester

Project Status:PlannedRegion: South WestType:Improvement Scheme

A40 Longford Roundabout Gloucester

To carry out works to improve the A40 Longford Roundabout, Gloucester

Project Status:CurrentRegion: South WestType:Improvement Scheme

A30 Loggans Moor Roundabout

We carried out works to improve the A30 at Loggans Moor.

Project Status:CompletedRegion: South WestType:Improvement Scheme

A1(M) Blind Lane to Washington resurfacing

Resurfacing works between Junction 63 and Junction 65 of the A1(M)

Project Status:CurrentRegion: North East and YorkshireType:Maintenance Scheme

A38 Carkeel Roundabout

We plan to improve the A38 approach and exit to the Carkeel roundabout

Project Status:PlannedRegion: South WestType:Improvement Scheme

A1M Bowburn Circulatory Resurfacing

Resurfacing the A1M Junction 61 (Bowburn Interchange) roundabout.

Project Status:CompletedRegion: North East and YorkshireType:Maintenance Scheme

Dartford Crossing Remote Payment Scheme

Works to reduce the current levels of congestion at Dartford Crossing by introducing newer technology and road layout changes

Project Status:CurrentRegion: London and South EastType:Improvement Scheme

A14 Junction 23 Spittals Interchange Westbound Off-Slip Improvement

We have withdrawn plans to widen and extend the existing exit slip road at the A14 junction 23 westbound

Project Status:WithdrawnRegion: EastType:Improvement Scheme

A404 Bisham Roundabout Improvement

Works to reduce congestion and improve safety at the Bisham roundabout on the A404 near Marlow.

Project Status:On HoldRegion: London and South EastType:Improvement Scheme

M6 Junction 38 Southbound Tebay Bridge

We are undertaking maintenance work on Tebay Bridge, which carries the M6 over the River Lune near junction 38.

Project Status:CompletedRegion: North WestType:Maintenance Scheme

A50 to A500 Sideway Improvement

Works to tackle congestion at A50 - A500 Sideway by improving the traffic signals, road markings and road signs at the junction.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A5 Edgebold roundabout junction improvement

Works to tackle congestion at the A5 Edgebold roundabout by widening the carriageway and improving road markings and signs.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M5 junction 4 improvements

Works to tackle congestion at the M5 junction 4 by widening the junction and creating a new lane.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

A5 / A5148 Wall Island junction improvement

Work designed to tackle congestion by installing traffic signals and widening the approaches to the junction.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A43 / M40 J10 Economy

Works to tackle congestion by changing the way traffic on the A43 enters the M40 southbound traffic

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

A43 / A5 Tove Roundabout Economy

This work has been designed to tackle congestion by widening the A43 to three lanes through the junction and reducing the size of the central island.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

M1 J24 / A50 Approach Economy

Works to tackle congestion by changing the way traffic on the A50 eastbound enters the M1 southbound

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

A34 M40 Junction 9 Wendlebury Phase 2

A scheme will be taking place to improve the A34 northbound approach and A41 exit/entry points at the M40 junction 9 roundabout near Bicester (Oxfordshire)

Project Status:CurrentRegion: London and South EastType:Improvement Scheme

A5 Emstrey roundabout improvement

This work has been designed to tackle congestion by realigning the carriageway and introducing traffic lights.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

M42 junction 10 improvement

We are improving the M42 junction 10 by installing traffic signals and widening the carriageway on approach to the junction.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

M42 junction 6 improvement

The work has been designed to tackle congestion by widening sections of the roundabout at this junction.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

A5 Preston Boats junction improvement

This work has been designed to tackle congestion by replacing the A5 Preston Boats junction with a junction controlled by traffic lights.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

A590 Greenodd Junction Improvement

Works to replace the T-junction at the A590 and A5092 with a roundabout

Project Status:CompletedRegion: North WestType:Improvement Scheme

A3 Ham Barn Roundabout Improvements

We are carrying out improvement work to reduce congestion at the A3/B3006 junction.

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

A38 Manadon On-Slips Improvement, Plymouth

To carrying out works to improve the A38 at Manadon, Plymouth.

Project Status:CurrentRegion: South WestType:Improvement Scheme

A38 Splatford to Wobbly Wheel Improvement

We will improve the A38 at Splatford Split, Devon, as part of the Pinch Point Programme.

Project Status:CurrentRegion: South WestType:Improvement Scheme

A38 Drumbridges Roundabout Improvement, Newton Abbot

We are undertaking improvement works to the A38 Drumbridges roundabout, Newton Abbot, in partnership with Devon County Council

Project Status:CurrentRegion: South WestType:Improvement Scheme

M3 Junction 6 Black Dam Roundabout Improvements

We will be carrying out works to convert the existing Black Dam roundabout into a junction with traffic signals.

Project Status:CurrentRegion: London and South EastType:Improvement Scheme

M27 Junction 3 Improvements

We are improving the M271 junction 2 where it meets the M27 J3 by widening the M27 westbound exit slip road and short section of the M271 to three lanes.

Project Status:PlannedRegion: London and South EastType:Improvement Scheme

M5 Junction 17 Southbound Off-Slip, Bristol

We will be improving the M5 at Junction 17, South Gloucestershire, as part of the Pinch Point Programme.

Project Status:PlannedRegion: South WestType:Improvement Scheme

M5 Junction 16 Northbound Off-slip

We will be improving the M5 at Junction 16, South Gloucestershire, as part of the Pinch Point Programme.

Project Status:PlannedRegion: South WestType:Improvement Scheme

A303 Cartgate Roundabout Improvement, Yeovil

Works will be carried out improve the left turns at the A303 Cartgate roundabout. Part of the Pinch Point Programme.

Project Status:PlannedRegion: South WestType:Improvement Scheme

M5 Junction 30 Southbound Off-Slip, Exeter

We will be improving the M5 at Junction 30, Devon as part of the Pinch Point Programme.

Project Status:PlannedRegion: South WestType:Improvement Scheme

A12 Hughes Corner Gap Closures

We have permanently closed the gaps in the central reservation of the A12 at Hughes Corner

Project Status:CompletedRegion: EastType:Improvement Scheme

QEII Dartford - Thurrock River Crossing Joint Replacement Works

We are replacing expansion joints on the QEII Bridge at the Dartford - Thurrock River Crossing

Project Status:CurrentRegion: London and South EastType:Maintenance Scheme

A1 Coal House to Metro Centre Improvement

We propose to upgrade the A1 between the Coal House and Metro Centre junctions.

Project Status:CurrentRegion: North East and YorkshireType:Major Scheme

A1 / A19 Seaton Burn Interchange & Fisher Lane Junction Improvement

To improve the A1/A19 Interchange and the A19 Fisher Lane

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

A19/A689 Wolviston Interchange, Wynyard

Works to improve the queuing on the A689 westbound approach and on the A19 mainline southbound in the morning peaks.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

A19 / A174 Parkway Junction Improvement, Middlesbrough

Works to improve the queuing on the A174 eastbound and westbound approaches, and on the A19 southbound exit slip road in the evening peak.

Project Status:CurrentRegion: North East and YorkshireType:Improvement Scheme

M27 Junction 5 Improvements

Continuation of a previous scheme constructed in 2009 by Hampshire County Council to improve the M27 westbound exit slip road and A335 Stoneham Way.

Project Status:CurrentRegion: London and South EastType:Improvement Scheme

A45 / A509 Wilby Way Roundabout Improvement Scheme

Works to control and improve the flow of traffic through the A45/A509 Willby Way roundabout junction.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A34 Easton Lane Signalisation

We have completed a scheme to reduce congestion at the Winnall roundabout, where the A34 meets the M3 at junction 9 near Winchester (Hampshire).

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

A38 Little Eaton Economy

We are increasing the number of lanes and installing traffic signals at A38 Little Eaton Economy.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

A38 Markeaton Economy

The works will involve increasing the number of lanes and installing traffic signals, to control the flow of traffic through the junction

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

M25 Junction 30 Interim Scheme

Improvements are being made to the slip roads and traffic signals at Junction 30 of the M25 in Essex.

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

A5 Towcester Parking (Northamptonshire)

Works to redesign the existing car park layout outside the town hall on the A5 Towcester

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

M6 Junction 9 Traffic Signal Upgrade

We have successfully completed work to upgrade the traffic lights on the roundabout at M6 junction 9, near Walsall, West Midlands.

Project Status:CompletedRegion: MidlandsType:Improvement Scheme

A1 Leeming to Barton Improvement

Works to upgrade existing dual carriageway to a three lane motorway.

Project Status:CurrentRegion: North East and YorkshireType:Major Scheme

M27 Junction 9 Pier Replacement

We replaced the bridge piers on the M27 junction 9 as part of our essential maintenance programme.

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A2 Eastcliffe/Jubilee Way

Work took place on the A2 Jubilee Way Bridge in Dover, Kent.

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

M23 Hooley Junction Improvement

We are not currently undertaking any further studies for a potential future major scheme at this location.

Project Status:On HoldRegion: London and South EastType:Improvement Scheme

A27 Chichester Drainage Improvements

We have improved the drainage system on the A27 Chichester Bypass.

Project Status:CompletedRegion: London and South EastType:Improvement Scheme

A55 Vicars Cross Roundabout Resurfacing

The project will resurface the carriageway on both approaches of the A51 to the Vicars Cross roundabout.

Project Status:CompletedRegion: North WestType:Maintenance Scheme

A5/A444 Red Gate Junction Improvement

We are proposing to improve the Red Gate junction of the A5 and A444.

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

A138 Chelmsford - Replacement of Chelmer Viaduct

We propose to replace the existing A138 Chelmer Viaduct and River Bridge with a new structure.

Project Status:PlannedRegion: EastType:Maintenance Scheme

A1/B6387 Twyford Bridge Junction Improvement

We are proposing to improve the Twyford Bridge junction of the A1 and B6387.

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

A1 Elkesley Junctions Improvement

We are proposing a new junction at Elkesley, with links providing a new local route to Retford avoiding the A1.

Project Status:CurrentRegion: MidlandsType:Improvement Scheme

M25 Junctions 27-30 Widening

We have widened the M25 between junctions 27-30.

Project Status:CompletedRegion: London and South EastType:Major Scheme

A421 Bedford to M1 Junction 13

We have remodelled Junction 13 of the M1, with a new bridge carrying the A421 over and new "grade separated" junctions at Marston Moretaine and Marsh Leys.

Project Status:CompletedRegion: EastType:Major Scheme

M25 Junctions 16-23 Widening

We have completed work to widen the M25 from three to four lanes between junctions 16 and 23.

Project Status:CompletedRegion: London and South EastType:Major Scheme

M6 Junctions 13-19

We have proposed making the M6 between junctions 13 and 19 a smart motorway.

Project Status:On HoldRegion: MidlandsType:Major Scheme

A64 Rillington Bypass

We have proposed the development of a bypass of Rillington village, which gets particularly congested during the busy summer holiday period.

Project Status:On HoldRegion: North East and YorkshireType:Major Scheme

A483 Pant to Llanymynech Bypass

We have proposed an upgrade a bypass on the A483 Pant to Llanymynech.

Project Status:On HoldRegion: MidlandsType:Major Scheme

A30 Temple to Higher Carblake Improvement

We have proposed a new dual carriageway between Temple and the Bodmin Bypass.

Project Status:PlannedRegion: South WestType:Major Scheme

M62 Junctions 18-20 Managed Motorway

We proposed to improve the M62 junctions 18 and 20 by making it a "managed motorway". This scheme has been superceded by a new combined project

Project Status:WithdrawnRegion: North WestType:Major Scheme

M60 Junctions 8-12 Managed Motorways

We proposed to improve the M60 junctions 8 to 12 by making it a "managed motorway". This has been superceded by a new combined project

Project Status:WithdrawnRegion: North WestType:Major Scheme

A30 Carland Cross to Chiverton Cross

We proposed an upgrade to the 8.7 mile section of single carriageway on the A30 between Carland Cross and Chiverton Cross from single to dual carriageway.

Project Status:On HoldRegion: South WestType:Major Scheme

A1 Morpeth to Felton Dualling

We proposed an upgrade to the 13 kilometre section of single carriageway on the A1 between Morpeth and Felton from single to dual, two lane carriageway.

Project Status:On HoldRegion: North East and YorkshireType:Major Scheme

A1 Adderstone to Belford dualling

We have proposed an upgrade the 4km section of A1 between Adderstone and Belford.

Project Status:On HoldRegion: North East and YorkshireType:Major Scheme

M60 Junctions 15-12 Lane Gain

We proposed to improve the M60 by providing an additional lane between junctions 15 and 12. This project has now been superceded by a new combined project

Project Status:WithdrawnRegion: North WestType:Major Scheme

M6 Junction 10a-13

We are working to improve the M6 by making it a "smart motorway" between junctions 10a and 13.

Project Status:CurrentRegion: MidlandsType:Major Scheme

M6 Birmingham Box Phase 3

We propose to improve the M6 by making it a "smart motorway" between junctions 5 and 8, including M5 link roads.

Project Status:CurrentRegion: MidlandsType:Major Scheme

M54 to M6/M6 (Toll) Link Road

We are proposing a link between the M54 , M6 and the M6 (Toll).

Project Status:PlannedRegion: MidlandsType:Major Scheme

M4 Junctions 3-12

We propose to improve the M4 by making it a "smart motorway" between junctions 3 and 12. Smart motorways help relieve congestion by using technology

Project Status:PlannedRegion: London and South EastType:Major Scheme

M3 Junctions 2-4a

We propose to improve the M3 by making it a "smart motorway" between junctions 2 and 4.

Project Status:CurrentRegion: London and South EastType:Major Scheme

M25 Junctions 5-7

Works to make the M25 a "smart motorway" (previously known as managed motorways) between junctions 5 and 7

Project Status:CompletedRegion: London and South EastType:Major Scheme

M25 Junctions 23-27

We are improving the M25 by making it a "smart motorway" (previously known as managed motorways) between junctions 23 and 37.

Project Status:CurrentRegion: London and South EastType:Major Scheme

M25 Junction 30/A13 Corridor Relieving Congestion Scheme

We propose to improve the capacity of the highway network at the M25 junction 30.

Project Status:PlannedRegion: London and South EastType:Major Scheme

M20 Junction 10A

We are proposing to provide a new M20 Junction 10A and link road to the A2070 at Ashford in Kent.

Project Status:PlannedRegion: London and South EastType:Major Scheme

M1 Junction 19 Improvement Scheme

We are improving junction 19 of the M1 motorway and related sections of the M6 motorway and A14 trunk road.

Project Status:CurrentRegion: MidlandsType:Major Scheme

M1 Junctions 39-42

We propose to improve the M1 by making it a "smart motorway" between junctions 39 and 42.

Project Status:CurrentRegion: North East and YorkshireType:Major Scheme

M1 Junctions 28-31

We propose to improve the M1 by making it a "smart motorway" between junctions 28 and 31.

Project Status:CurrentRegion: MidlandsType:Major Scheme

A63 Castle Street Improvement

We propose to improve the A63 at Castle Street by lowering the A63, with Ferensway and Commercial Road passing over, creating a split level junction.

Project Status:PlannedRegion: North East and YorkshireType:Major Scheme

A5-M1 Link (Dunstable Northern Bypass)

We are proposing to construct a two-lane dual carriageway running east from the A5 north of Dunstable to join the M1 at a new Junction 11a south of Chalton

Project Status:PlannedRegion: EastType:Major Scheme

A556 Knutsford to Bowdon Improvement

We have been asked to look at alternative proposals for the A556 Knutsford to Bowdon Improvement, involving local communities in our work.

Project Status:CurrentRegion: North WestType:Major Scheme

A453 Widening (M1 Junction 24 to A52 Nottingham)

We are proposing to improve a section of the A453 between the M1 and A52 by widening the urban section and dualling the rural section.

Project Status:CurrentRegion: MidlandsType:Major Scheme

M1 Junctions 32-35a

We propose to improve the M1 by making it a "managed motorway" between junctions 32 and 35a.

Project Status:PlannedRegion: North East and YorkshireType:Major Scheme

A47 Postwick Interchange - Norfolk County Council scheme

The scheme is funded and promoted by Norfolk County Council (NCC) and is not a Highways Agency scheme.

Project Status:CurrentRegion: EastType:Improvement Scheme

A45/A46 Tollbar End Improvement

We are proposing to improve the A45 Stonebridge Highway and the Tollbar End roundabout in southern Coventry.

Project Status:CurrentRegion: MidlandsType:Major Scheme

A27 Chichester Improvement

We are proposing a package of improvements for a section of the A27 near Chichester.

Project Status:PlannedRegion: London and South EastType:Major Scheme

A38 Derby Junctions

To improve the three existing roundabout junctions at A38 / A5111 Kingsway, A38 / A52 Markeaton and A38 / A61 Little Eaton.

Project Status:PlannedRegion: MidlandsType:Improvement Scheme

A19/A1058 Coast Road Junction Improvement

We are proposing to improve the A19/A1058 Coast Road junction.

Project Status:PlannedRegion: North East and YorkshireType:Improvement Scheme

A19 Testos Junction Improvements

We are proposing to improve the A19 by constructing a flyover to take the A19 over the Testos junction

Project Status:PlannedRegion: North East and YorkshireType:Major Scheme

A160/A180 Port of Immingham Improvement

To provide better access to the Port of Immingham by improving the A160 between the junction with the A180 at Brocklesby Interchange and the Port.

Project Status:PlannedRegion: North East and YorkshireType:Major Scheme

A14 Junctions 7-9 Kettering Bypass Improvement

We aim to enhance the A14 by providing an extra lane in each direction from junction 7 (A43) to junction 9 (A509).

Project Status:CurrentRegion: MidlandsType:Major Scheme

A2 Jubilee Way Bridge Joint Protection

Protection works took place on the A2 Jubilee Way Bridge.

Project Status:CompletedRegion: London and South EastType:Maintenance Scheme

A21 Tonbridge to Pembury Dualling

Upgrade the A21 between Tonbridge and Pembury to dual 2-lane carriageway standard.

Project Status:PlannedRegion: London and South EastType:Major Scheme

A120 Braintree Marks Farm Roundabout

We are working to improve the A120 Marks Farm roundabout.

Project Status:PlannedRegion: EastType:Improvement Scheme

A11 Fiveways to Thetford Improvement

We propose to improve the A11 by making it a dual carriageway between Fiveways and Thetford.

Project Status:CurrentRegion: EastType:Major Scheme

M1 Junction 10-13 Improvements

We are working to improve the M1 by making it a "managed motorway" between junctions 10 and 13.

Project Status:CompletedRegion: EastType:Major Scheme

M62 Junctions 25 to 30

Implementing a "smart motorway" between junctions 25 and 30.

Project Status:CompletedRegion: North East and YorkshireType:Major Scheme

M4 Junction 19-20 and M5 Junction 15-17

We are working to improve the M4 between junctions 19 and 20, and the M5 between junctions 15 and 17, by making it a "smart motorway".

Project Status:CompletedRegion: South WestType:Major Scheme

A46 Newark to Widmerpool Improvement

We are constructing a new 17 miles long two-lane dual carriageway from the A606 junction at Widmerpool to the roundabout at Farndon, just south of Newark.

Project Status:CurrentRegion: MidlandsType:Major Scheme

A23 Handcross to Warninglid

We are working to widen the A23 between Handcross and Warninglid.